677 resultados para implementation method


Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Facing with the difficulty in information propagation and synthesizing from conceptual to embodiment design, this paper introduces a function-oriented, axiom based conceptual modeling scheme. Default logic reasoning is exploited for recognition and reconstitution of conceptual product geometric and topological information. The proposed product modeling system and reasoning approach testify a methodology of "structural variation design", which is verified in the implementation of a GPAL (Green Product All Life-cycle) CAD system. The GPAL system includes major enhancement modules of a mechanism layout sketching method based on fuzzy logic, a knowledge-based function-to-form mapping mechanism and conceptual form reconstitution paradigm based on default geometric reasoning. A mechanical hand design example shows a more than 20 times increase in design efficacy with these enhancement modules in the GPAL system on a general 3D CAD platform.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

For certain continuum problems, it is desirable and beneficial to combine two different methods together in order to exploit their advantages while evading their disadvantages. In this paper, a bridging transition algorithm is developed for the combination of the meshfree method (MM) with the finite element method (FEM). In this coupled method, the meshfree method is used in the sub-domain where the MM is required to obtain high accuracy, and the finite element method is employed in other sub-domains where FEM is required to improve the computational efficiency. The MM domain and the FEM domain are connected by a transition (bridging) region. A modified variational formulation and the Lagrange multiplier method are used to ensure the compatibility of displacements and their gradients. To improve the computational efficiency and reduce the meshing cost in the transition region, regularly distributed transition particles, which are independent of either the meshfree nodes or the FE nodes, can be inserted into the transition region. The newly developed coupled method is applied to the stress analysis of 2D solids and structures in order to investigate its’ performance and study parameters. Numerical results show that the present coupled method is convergent, accurate and stable. The coupled method has a promising potential for practical applications, because it can take advantages of both the meshfree method and FEM when overcome their shortcomings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this article I outline and demonstrate a synthesis of the methods developed by Lemke (1998) and Martin (2000) for analyzing evaluations in English. I demonstrate the synthesis using examples from a 1.3-million-word technology policy corpus drawn from institutions at the local, state, national, and supranational levels. Lemke's (1998) critical model is organized around the broad 'evaluative dimensions' that are deployed to evaluate propositions and proposals in English. Martin's (2000) model is organized with a more overtly systemic-functional orientation around the concept of 'encoded feeling'. In applying both these models at different times, whilst recognizing their individual usefulness and complementarity, I found specific limitations that led me to work towards a synthesis of the two approaches. I also argue for the need to consider genre, media, and institutional aspects more explicitly when claiming intertextual and heteroglossic relations as the basis for inferred evaluations. A basic assertion made in this article is that the perceived Desirability of a process, person, circumstance, or thing is identical to its 'value'. But the Desirability of anything is a socially and thus historically conditioned attribution that requires significant amounts of institutional inculcation of other 'types' of value-appropriateness, importance, beauty, power, and so on. I therefore propose a method informed by critical discourse analysis (CDA) that sees evaluation as happening on at least four interdependent levels of abstraction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The determination of the most appropriate procurement method for capital works projects is a challenging task for the Department of Housing and Works (DHW) and other Western Australian State Government Agencies because of the array of assessment criteria that are considered and the procurement methods that are available. A number of different procurement systems can be used to deliver capital works projects such a traditional, design and construct and management. Sub-classifications of these systems have proliferated and continue to emerge in response to market demands. The selection of an inappropriate procurement method may lead to undesirable project outcomes. To facilitate DHW in selecting an appropriate procurement method for its capital works projects, a six step procurement method selection process is presented. The characteristics of the most common forms of procurement method used in Australia are presented. Case studies where procurement methods have been used for specific types of capital works in Western Australia are offered to provide a reference point and learning opportunity for procurement method selection.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The construction industry is categorised as being an information-intensive industry and described as one of the most important industries in any developed country, facing a period of rapid and unparalleled change (Industry Science Resources 1999) (Love P.E.D., Tucker S.N. et al. 1996). Project communications are becoming increasingly complex, with a growing need and fundamental drive to collaborate electronically at project level and beyond (Olesen K. and Myers M.D. 1999; Thorpe T. and Mead S. 2001; CITE 2003). Yet, the industry is also identified as having a considerable lack of knowledge and awareness about innovative information and communication technology (ICT) and web-based communication processes, systems and solutions which may prove beneficial in the procurement, delivery and life cycle of projects (NSW Government 1998; Kajewski S. and Weippert A. 2000). The Internet has debatably revolutionised the way in which information is stored, exchanged and viewed, opening new avenues for business, which only a decade ago were deemed almost inconceivable (DCITA 1998; IIB 2002). In an attempt to put these ‘new avenues of business’ into perspective, this report provides an overall ‘snapshot’ of current public and private construction industry sector opportunities and practices in the implementation and application of web-based ICT tools, systems and processes (e-Uptake). Research found that even with a reserved uptake, the construction industry and its participating organisations are making concerted efforts (fortunately with positive results) in taking up innovative forms of doing business via the internet, including e-Tendering (making it possible to manage the entire tender letting process electronically and online) (Anumba C.J. and Ruikar K. 2002; ITCBP 2003). Furthermore, Government (often a key client within the construction industry),and with its increased tendency to transact its business electronically, undoubtedly has an effect on how various private industry consultants, contractors, suppliers, etc. do business (Murray M. 2003) – by offering a wide range of (current and anticipated) e-facilities / services, including e-Tendering (Ecommerce 2002). Overall, doing business electronically is found to have a profound impact on the way today’s construction businesses operate - streamlining existing processes, with the growth in innovative tools, such as e-Tender, offering the construction industry new responsibilities and opportunities for all parties involved (ITCBP 2003). It is therefore important that these opportunities should be accessible to as many construction industry businesses as possible (The Construction Confederation 2001). Historically, there is a considerable exchange of information between various parties during a tendering process, where accuracy and efficiency of documentation is critical. Traditionally this process is either paper-based (involving large volumes of supporting tender documentation), or via a number of stand-alone, non-compatible computer systems, usually costly to both the client and contractor. As such, having a standard electronic exchange format that allows all parties involved in an electronic tender process to access one system only via the Internet, saves both time and money, eliminates transcription errors and increases speed of bid analysis (The Construction Confederation 2001). Supporting this research project’s aims and objectives, researchers set to determine today’s construction industry ‘current state-of-play’ in relation to e-Tendering opportunities. The report also provides brief introductions to several Australian and International e-Tender systems identified during this investigation. e-Tendering, in its simplest form, is described as the electronic publishing, communicating, accessing, receiving and submitting of all tender related information and documentation via the internet, thereby replacing the traditional paper-based tender processes, and achieving a more efficient and effective business process for all parties involved (NT Governement 2000; NT Government 2000; NSW Department of Commerce 2003; NSW Government 2003). Although most of the e-Tender websites investigated at the time, maintain their tendering processes and capabilities are ‘electronic’, research shows these ‘eTendering’ systems vary from being reasonably advanced to more ‘basic’ electronic tender notification and archiving services for various industry sectors. Research also indicates an e-Tender system should have a number of basic features and capabilities, including: • All tender documentation to be distributed via a secure web-based tender system – thereby avoiding the need for collating paperwork and couriers. • The client/purchaser should be able to upload a notice and/or invitation to tender onto the system. • Notification is sent out electronically (usually via email) for suppliers to download the information and return their responses electronically (online). • During the tender period, updates and queries are exchanged through the same e-Tender system. • The client/purchaser should only be able to access the tenders after the deadline has passed. • All tender related information is held in a central database, which should be easily searchable and fully audited, with all activities recorded. • It is essential that tender documents are not read or submitted by unauthorised parties. • Users of the e-Tender system are to be properly identified and registered via controlled access. In simple terms, security has to be as good as if not better than a manual tender process. Data is to be encrypted and users authenticated by means such as digital signatures, electronic certificates or smartcards. • All parties must be assured that no 'undetected' alterations can be made to any tender. • The tenderer should be able to amend the bid right up to the deadline – whilst the client/purchaser cannot obtain access until the submission deadline has passed. • The e-Tender system may also include features such as a database of service providers with spreadsheet-based pricing schedules, which can make it easier for a potential tenderer to electronically prepare and analyse a tender. Research indicates the efficiency of an e-Tender process is well supported internationally, with a significant number, yet similar, e-Tender benefits identified during this investigation. Both construction industry and Government participants generally agree that the implementation of an automated e-Tendering process or system enhances the overall quality, timeliness and cost-effectiveness of a tender process, and provides a more streamlined method of receiving, managing, and submitting tender documents than the traditional paper-based process. On the other hand, whilst there are undoubtedly many more barriers challenging the successful implementation and adoption of an e-Tendering system or process, researchers have also identified a range of challenges and perceptions that seem to hinder the uptake of this innovative approach to tendering electronically. A central concern seems to be that of security - when industry organisations have to use the Internet for electronic information transfer. As a result, when it comes to e-Tendering, industry participants insist these innovative tendering systems are developed to ensure the utmost security and integrity. Finally, if Australian organisations continue to explore the competitive ‘dynamics’ of the construction industry, without realising the current and future, trends and benefits of adopting innovative processes, such as e-Tendering, it will limit their globalising opportunities to expand into overseas markets and allow the continuation of international firms successfully entering local markets. As such, researchers believe increased knowledge, awareness and successful implementation of innovative systems and processes raises great expectations regarding their contribution towards ‘stimulating’ the globalisation of electronic procurement activities, and improving overall business and project performances throughout the construction industry sectors and overall marketplace (NSW Government 2002; Harty C. 2003; Murray M. 2003; Pietroforte R. 2003). Achieving the successful integration of an innovative e-Tender solution with an existing / traditional process can be a complex, and if not done correctly, could lead to failure (Bourn J. 2002).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

- This paper presents a validation proposal for development of diagnostic and prognostic algorithms for SF6 puffer circuit-breakers reproduced from actual site waveforms. The re-ignition/restriking rates are duplicated in given circuits and the cumulative energy dissipated in interrupters by the restriking currents. The targeted objective is to provide a simulated database for diagnosis of re-ignition/restrikes relating to the phase to earth voltage and the number of re-ignition/restrikes as well as estimating the remaining life of SF6 circuit-breakers. The model-based diagnosis of a tool will be useful in monitoring re-ignition/restrikes as well as predicting a nozzle’s lifetime. This will help ATP users with practical study cases and component data compilation for shunt reactor switching and capacitor switching. This method can be easily applied with different data for the different dielectric curves of circuit breakers and networks. This paper presents modelling details and some of the available cases, required project support, the validation proposal, the specific plan for implementation and the propsed main contributions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The implementation of ‘good governance’ in Indonesia’s regional government sector became a central tenet in governance research following the introduction of the national code for governance in 2006. The code was originally drafted in 1999 as a response to the Asian financial crises and many cases of unearthed corruption, collusion, and nepotism. It was reviewed in 2001 and again in 2006 to incorporate relevant political, economical, and social developments. Even though the national code exists along with many regional government decrees on good governance, the extent of implementation of the tenets of good governance in Indonesia’s regional government is still questioned. Previous research on good governance implementation in Indonesian regional government (Mardiasmo, Barnes and Sakurai, 2008) identified differences in the nature and depth of implementation between various Indonesian regional governments. This paper analyses and extends this recent work and explores key factors that may impede the implementation and sustained application of governance practices across regional settings. The bureaucratic culture of Indonesian regional government is one that has been shaped for over approximately 30 years, in particular during that of the Soeharto regime. Previous research on this regime suggests a bureaucratic culture with a mix of positive and negative aspects. On one hand Soeharto’s regime resulted in strong development growth and strong economic fundamentals, resulting in Indonesia being recognised as one of the Asian economic tigers prior to the 1997 Asian financial crises. The financial crises however revealed a bureaucratic culture that was rife with corruption, collusion, and nepotism. Although subsequent Indonesian governments have been committed to eradicating entrenched practices it seems apparent that the culture is ingrained within the bureaucracy and eradication of it will take time. Informants from regional government agree with this observation, as they identify good governance as an innovative mechanism and to implement it will mean a deviation from the “old ways.” Thus there is a need for a “changed” mind set in order to implement sustained governance practices. Such an exercise has proven to be challenging so far, as there is “hidden” resistance from within the bureaucracy to change its ways. The inertia of such bureaucratic cultures forms a tension against the opportunity for the implementation of good governance. From this context an emergent finding is the existence of a ‘bureaucratic generation gap’ as an impeding variable to enhanced and more efficient implementation of governance systems. It was found that after the Asian financial crises the Indonesian government (both at national and regional level) drew upon a wider human resources pool to fill government positions – including entrants from academia, the private sector, international institutions, foreign nationals and new graduates. It suggested that this change in human capital within government is at the core of this ‘inter-generational divide.’ This divergence is exemplified, at one extreme, by [older] bureaucrats who have been in-position for long periods of time serving during the extended Soeharto regime. The “new” bureaucrats have only sat in their positions since the end of Asian financial crisis and did not serve during Soeharto’s regime. It is argued that the existence of this generation gap and associated aspects of organisational culture have significantly impeded modernising governance practices across regional Indonesia. This paper examines the experiences of government employees in five Indonesian regions: Solok, Padang, Gorontalo, Bali, and Jakarta. Each regional government is examined using a mixed methodology comprising of on-site observation, document analysis, and iterative semi-structured interviewing. Drawing from the experiences of five regional governments in implementing good governance this paper seeks to better understand the causal contexts of variable implementation governance practices and to suggest enhancements to the development of policies for sustainable inter-generational change in governance practice across regional government settings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Crash data involving taxis indicates that such drivers are over represented in crashes and are one to two times more likely to be involved in a fatality crash. This study reports on the pre intervention survey to provide a baseline measure of the self-reported attitudes and corresponding driving behaviours of a sample of taxi drivers. Results indicate that some taxi drivers willingly admit to engaging in unsafe driving practices. In addition, preliminary results of a post intervention survey revealed that taxi drivers’ safety perceptions, attitude and behaviours improved after completing a Driving Diary intervention.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background First aid given immediately after a motor vehicle crash can have considerable benefits. Less understood however is first aid training as a prevention strategy for reducing risk-taking. A first step is to understand whether first aid skills are associated with risk-taking and injury experiences. Further, students and teachers who undergo or deliver such training offer important perspectives about implementation. Aims The research has two aims: (i) to identify whether first aid knowledge is associated with road risk-taking and injury and (ii) to examine teachers’ and students’ experiences of first aid activities within a school-based injury prevention and control program. Method Participants were 173 Year 9s (47% male) who completed a survey which included demographic information, first aid knowledge and risk-taking behaviour and injury experiences. Focus groups were held with 8 teachers who delivered, and 70 students who participated in, a school-based injury prevention and control program. Results Results showed a relationship between greater first aid knowledge and reduced engagement in risk-taking and injury experiences. Both students and teachers reported favourably on first aid however teachers also acknowledged challenges in delivering practical activities. Discussion & Conclusion It appears that first aid can be implemented within the school setting, particularly at the Year 9 level, and that both students and teachers involved in such training identify multiple benefits and positive experiences with first aid training. In addition, the findings suggest that first aid knowledge could be an important part of a prevention program.