492 resultados para demands


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

China is now seen as arguably, the next economic giant of the 21st century. From a country closed in the past to the external world, the Chinese market now presents as one of the most lucrative in the world economy. One area that has drawn increasing international interest is education - it has been estimated that by 2020 there will be 25 million excess demands for higher education places that the Chinese tertiary educational system cannot meet. Many overseas institutions have developed programs to cater for this immense potential market. In 2000 the Law Faculty of the University of Technology, Sydney (UTS)introduced a new postgraduate program specifically targeting the Chinese market. This paper is a brief assessment of the program - it examines general issues in the pedagogical delivery of programs in LOTE (Language Other Than English) and the use of 'proxies' in the delivery of LOTE programs. The paper concludes that while the UTS program demonstrates that it is feasible to use proxy lecturers or interpreters in the delivery of programs in LOTE, the exercise entails significant problems that can undermine the integrity of such programs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Residents, businesses, local, state and national government stakeholders all want to have their say when airports expand or develop. While stakeholder engagement is increasingly a strategy employed for managing the tensions attracted to airport development, different stakeholders have different expectations and demands of airports. This requires different approaches to stakeholder engagement. Identifying the public values that are at stake in developing airports provides an initial step towards building a platform for selecting and applying stakeholder engagement strategies in airport and more general infrastructure contexts. -------- This paper uses the existing literature of public values to build a general typology of public values for the stakeholders of airport development. A range of semi-privatised and state owned airport case studies from Europe have been used to demonstrate the universal nature of the identified values. The result is a framework that identifies both the substantive and procedural values, separated into local, state/regional and national levels of interest. The typology provides a generalised view of public values in airport development; however, the public values identified may be limited to more western oriented societies due to the skew of airport cases reviewed. --------- Contributions are made to the literature with a typology of public values derived from existing knowledge and explored using empirical case examples. The provided typology enables research of airport development decision-making to delineate public values both within and between stakeholder groups, and helps to explain the different perspectives that stakeholders have towards airport development. Future research may focus on refining the typology for different types of airport governance structures, such as differences between public values in state and market-led airport development; include more airport cases from eastern societies to draw parallels or differences between western and eastern societies; or utilise the typology as a framework for analysing changes in public values of airports over time.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

E-commerce technologies such as a website, email and the use of web browsers enables access to large amounts of information, facilitates communication and provides niche companies with an effective mechanism for competing with larger organisations world-wide. However recent literature has shown Australian SMEs have been slow in the uptake of these technologies. The aim of this research was to determine which factors were important in impacting on small firms' decision making in respect of information technology and e-commerce adoption. Findings indicate that generally the more a firm was concerned about its competitive position such a firm was likely to develop a web site. Moreover the 'Industry and Skill Demands' dimension suggested that as the formal education of the owner/manager increased, coupled with the likelihood that the firm was in the transport and storage or communication services industries, and realising the cost of IT adoption was in effect an investment, then such a firm would be inclined to develop a web site.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In a knowledge economy where technologically mediated information plays an important role, greater understanding is required of its impact on organisational sustainability. This paper examines the link between mediated information within a global economy and its relationship to a key to long-term organisational success– legitimacy. Aligning organisational legitimacy and the demands of a range of internal and external stakeholders is a central concern for managers when challenges to legitimacy continue to arise. Particularly during times of internally or environmentally driven change, challenges are created for managers seeking to ensure their organisation avoids questioning about its legitimacy. This paper presents the proposition that the perceptions of collective opinion derived from mass media provide a lens to a global world upon which managers base decisions to protect and repair organisational legitimacy. Legitimacy is determined from a broad social arena that can cross national and international boundaries (Lomi, 2000). Experience of legitimacy concerns, therefore, are often outside the traditional realms of managerial knowledge, and experience and of local business association networks (Aldrich, 1999). While the organisational landscape has been changing, at the same time, mass media have increased the focus on bringing news about events, and interpretations of events, from a broad and even global social area (Mutz, 1998). In addition, electronically facilitated media have exposed both organisational stakeholders and managers to views and interpretations of the world more quickly and more explicitly than in previous times. This paper proposes a relationship between perceptions of collective opinion derived from mass media and organisational legitimacy in such an environment.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the study of student learning literature, the traditional view holds that when students are faced with heavy workload, poor teaching, and content that they cannot relate to – important aspects of the learning context, they will more likely utilise the surface approach to learning due to stresses, lack of understanding and lack of perceived relevance of the content (Kreber, 2003; Lizzio, Wilson, & Simons, 2002; Ramdsen, 1989; Ramsden, 1992; Trigwell & Prosser, 1991; Vermunt, 2005). For example, in studies involving health and medical sciences students, courses that utilised student-centred, problem-based approaches to teaching and learning were found to elicit a deeper approach to learning than the teacher-centred, transmissive approach (Patel, Groen, & Norman, 1991; Sadlo & Richardson, 2003). It is generally accepted that the line of causation runs from the learning context (or rather students’ self reported data on the learning context) to students’ learning approaches. That is, it is the learning context as revealed by students’ self-reported data that elicit the associated learning behaviour. However, other research studies also found that the same teaching and learning environment can be perceived differently by different students. In a study of students’ perceptions of assessment requirements, Sambell and McDowell (1998) found that students “are active in the reconstruction of the messages and meanings of assessment” (p. 391), and their interpretations are greatly influenced by their past experiences and motivations. In a qualitative study of Hong Kong tertiary students, Kember (2004) found that students using the surface learning approach reported heavier workload than students using the deep learning approach. According to Kember if students learn by extracting meanings from the content and making connections, they will more likely see the higher order intentions embodied in the content and the high cognitive abilities being assessed. On the other hand, if they rote-learn for the graded task, they fail to see the hierarchical relationship in the content and to connect the information. These rote-learners will tend to see the assessment as requiring memorising and regurgitation of a large amount of unconnected knowledge, which explains why they experience a high workload. Kember (2004) thus postulate that it is the learning approach that influences how students perceive workload. Campbell and her colleagues made a similar observation in their interview study of secondary students’ perceptions of teaching in the same classroom (Campbell et al., 2001). The above discussions suggest that students’ learning approaches can influence their perceptions of assessment demands and other aspects of the learning context such as relevance of content and teaching effectiveness. In other words, perceptions of elements in the teaching and learning context are endogenously determined. This study attempted to investigate the causal relationships at the individual level between learning approaches and perceptions of the learning context in economics education. In this study, students’ learning approaches and their perceptions of the learning context were measured. The elements of the learning context investigated include: teaching effectiveness, workload and content. The authors are aware of existence of other elements of the learning context, such as generic skills, goal clarity and career preparation. These aspects, however, were not within the scope of this present study and were therefore not investigated.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper details the design of an autonomous helicopter control system using a low cost sensor suite. Control is maintained using simple nested PID loops. Aircraft attitude, velocity, and height is estimated using an in-house designed IMU and vision system. Information is combined using complimentary filtering. The aircraft is shown to be stabilised and responding to high level demands on all axes, including heading, height, lateral velocity and longitudinal velocity.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper details the design of an autonomous helicopter control system using a low cost sensor suite. Control is maintained using simple nested PID loops. Aircraft attitude, velocity, and height is estimated using an in-house designed IMU and vision system. Information is combined using complimentary filtering. The aircraft is shown to be stabilised and responding to high level demands on all axes, including heading, height, lateral velocity and longitudinal velocity.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Sustainable infrastructure demands that declared principles of sustainability are enacted in the processes of its implementation. However, a problem arises if the concept of sustainability is not thoroughly scrutinised in the planning process. The public interest could be undermined when the rhetoric of sustainability is used to substantiate a proposed plan. This chapter analyses the manifestation of sustainable development in the Boggo Road Busway Plan in Brisbane, Australia against the sustainability agenda set in the South East Queensland Regional and Transport Plans. Although the construction of the Busway was intended to improve public transport access in the region, its implementation drew significant environmental concerns. Local community groups contested the ‘sustainability’ concept deployed in Queensland’s infrastructure planning. Their challenges resulted in important concessions in the delivery of the Busway plan. This case demonstrates that principles of sustainable infrastructure should be measurable and that local communities be better informed in order to fulfil the public interest in regional planning.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Contemporary urban form, particularly in the cities of South Africa, lacks distinction and quality. The majority of developments are conceived as private and dislocated initiatives, surveiled enclaves with gated access being the only conduit to the outside world. Any concern for a positive contribution to the matrix of public activity is seldom a consideration. The urban form responds to the perception that traffic systems are paramount to the successful flux of the city in satisfying the escalating demands of vehicular movement. In contrast many of the urban centres around the world, the great historical centres of Europe, Americas and the Sub-Continent are admired and considered the ultimate models in urban experience. The colonnades, bazaars and boulevards hosting an abundance of street activity are the characteristics of such centres and are symptomatic of a city growth based on pedestrian movement patterns, an urbanism supportative of human interaction and exchange, a form which has nurtured the existence of a public realm. Through the understanding of the principles of traditional urbanism we may learn that the modernist paradigm of a contemporary suburbia has resulted in disconnected and separate land uses with isolated districts where a reliance on the car is essential rather than optional.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper is a report of a study to explore what constitutes nurse-patient interactions and to ascertain patients' perceptions of these interactions. BACKGROUND: Nurses maintain patient integrity through caring practices. When patients feel disempowered or that their integrity is threatened they are more likely to make a complaint. When nurses develop a meaningful relationship with patients they recognize and address their concerns. It is increasingly identified in the literature that bureaucratic demands, including increased workloads and reduced staffing levels, result in situations where the development of a 'close' relationship is limited. METHOD: Data collection took two forms: twelve 4-hour observation periods of nurse-patient interactions in one cubicle (of four patients) in a medical and a surgical ward concurrently over a 4-week period; and questionnaires from inpatients of the two wards who were discharged during the 4-week data collection period in 2005. FINDINGS: Observation data showed that nurse-patient interactions were mostly friendly and informative. Opportunities to develop closeness were limited. Patients were mostly satisfied with interactions. The major source of dissatisfaction was when patients perceived that nurses were not readily available to respond to specific requests. Comparison of the observation and survey data indicated that patients still felt 'cared for' even when practices did not culminate in a 'connected' relationship. CONCLUSION: The findings suggest that patients believe that caring is demonstrated when nurses respond to specific requests. Patient satisfaction with the service is more likely to be improved if nurses can readily adapt their work to accommodate patients' requests or, alternatively, communicate why these requests cannot be immediately addressed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Schizophrenia can be a very disabling illness that affects between 0.5% and 1% of the population. This illness has a great personal impact on the individual sufferer, their family and friends. In addition, it makes significant demands on health services and the community in general. This paper reviews the literature on housing and supportive relationships for people with schizophrenia. The literature reports that people's experience of their schizophrenia is that it not only causes symptoms, but often impacts on their ability to maintain the basic resources in life. These resources include the ability to maintain reasonable quality housing, which seems to further impact negatively on their illness and their ability to maintain supportive social relationships. People with schizophrenia (and people in general) rely on their social relationships and family to maintain their mental health. The loss of social relationships and inability to maintain quality housing seem to be related - if people cannot maintain quality housing, they find it difficult to maintain supportive social relationships.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Typical quadrotor aerial robots used in research weigh inlMMLBox and carry payloads measured in hundreds of grams. Several obstacles in design and control must be overcome to cater for expected industry demands that push the boundaries of existing quadrotor performance. The X-4 Flyer, a 4 kg quadrotor with a 1 kg payload, is intended to be prototypical of useful commercial quadrotors. The custom-built craft uses tuned plant dynamics with an onboard embedded attitude controller to stabilise flight. Independent linear SISO controllers were designed to regulate flyer attitude. The performance of the system is demonstrated in indoor and outdoor flight.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The analysis of investment in the electric power has been the subject of intensive research for many years. The efficient generation and distribution of electrical energy is a difficult task involving the operation of a complex network of facilities, often located over very large geographical regions. Electric power utilities have made use of an enormous range of mathematical models. Some models address time spans which last for a fraction of a second, such as those that deal with lightning strikes on transmission lines while at the other end of the scale there are models which address time horizons consisting of ten or twenty years; these usually involve long range planning issues. This thesis addresses the optimal long term capacity expansion of an interconnected power system. The aim of this study has been to derive a new, long term planning model which recognises the regional differences which exist for energy demand and which are present in the construction and operation of power plant and transmission line equipment. Perhaps the most innovative feature of the new model is the direct inclusion of regional energy demand curves in the nonlinear form. This results in a nonlinear capacity expansion model. After review of the relevant literature, the thesis first develops a model for the optimal operation of a power grid. This model directly incorporates regional demand curves. The model is a nonlinear programming problem containing both integer and continuous variables. A solution algorithm is developed which is based upon a resource decomposition scheme that separates the integer variables from the continuous ones. The decompostion of the operating problem leads to an interactive scheme which employs a mixed integer programming problem, known as the master, to generate trial operating configurations. The optimum operating conditions of each trial configuration is found using a smooth nonlinear programming model. The dual vector recovered from this model is subsequently used by the master to generate the next trial configuration. The solution algorithm progresses until lower and upper bounds converge. A range of numerical experiments are conducted and these experiments are included in the discussion. Using the operating model as a basis, a regional capacity expansion model is then developed. It determines the type, location and capacity of additional power plants and transmission lines, which are required to meet predicted electicity demands. A generalised resource decompostion scheme, similar to that used to solve the operating problem, is employed. The solution algorithm is used to solve a range of test problems and the results of these numerical experiments are reported. Finally, the expansion problem is applied to the Queensland electricity grid in Australia.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The analysis of investment in the electric power has been the subject of intensive research for many years. The efficient generation and distribution of electrical energy is a difficult task involving the operation of a complex network of facilities, often located over very large geographical regions. Electric power utilities have made use of an enormous range of mathematical models. Some models address time spans which last for a fraction of a second, such as those that deal with lightning strikes on transmission lines while at the other end of the scale there are models which address time horizons consisting of ten or twenty years; these usually involve long range planning issues. This thesis addresses the optimal long term capacity expansion of an interconnected power system. The aim of this study has been to derive a new, long term planning model which recognises the regional differences which exist for energy demand and which are present in the construction and operation of power plant and transmission line equipment. Perhaps the most innovative feature of the new model is the direct inclusion of regional energy demand curves in the nonlinear form. This results in a nonlinear capacity expansion model. After review of the relevant literature, the thesis first develops a model for the optimal operation of a power grid. This model directly incorporates regional demand curves. The model is a nonlinear programming problem containing both integer and continuous variables. A solution algorithm is developed which is based upon a resource decomposition scheme that separates the integer variables from the continuous ones. The decompostion of the operating problem leads to an interactive scheme which employs a mixed integer programming problem, known as the master, to generate trial operating configurations. The optimum operating conditions of each trial configuration is found using a smooth nonlinear programming model. The dual vector recovered from this model is subsequently used by the master to generate the next trial configuration. The solution algorithm progresses until lower and upper bounds converge. A range of numerical experiments are conducted and these experiments are included in the discussion. Using the operating model as a basis, a regional capacity expansion model is then developed. It determines the type, location and capacity of additional power plants and transmission lines, which are required to meet predicted electicity demands. A generalised resource decompostion scheme, similar to that used to solve the operating problem, is employed. The solution algorithm is used to solve a range of test problems and the results of these numerical experiments are reported. Finally, the expansion problem is applied to the Queensland electricity grid in Australia