181 resultados para Roads and streets


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Unlicensed driving remains a serious problem for road safety, despite ongoing improvements in traffic law enforcement practices and technology. While it does not play a direct causative role in road crashes, unlicensed driving undermines the integrity of the driver licensing system and is associated with a range of high-risk behaviours. The Queensland Transport and Main Roads (TMR) commissioned a program of research with separate components relating to different aspects of unlicensed driving. Drawing on Australian and international studies, the Unlicensed and Unregistered Vehicle (UUV) project explores the nature of unlicensed driving in Queensland, consolidates the available research evidence and identifies gaps in current knowledge relating to the driving behaviours of unlicensed drivers.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This article describes research conducted for the Japanese government in the wake of the magnitude 9.0 earthquake and tsunami that struck eastern Japan on March 11, 2011. In this study, material stock analysis (MSA) is used to examine the losses of building and infrastructure materials after this disaster. Estimates of the magnitude of material stock that has lost its social function as a result of a disaster can indicate the quantities required for reconstruction, help garner a better understanding of the volumes of waste flows generated by that disaster, and also help in the course of policy deliberations in the recovery of disaster-stricken areas. Calculations of the lost building and road materials in the five prefectures most affected were undertaken. Analysis in this study is based on the use of geographical information systems (GIS) databases and statistics; it aims to (1) describe in spatial terms what construction materials were lost, (2) estimate the amount of infrastructure material needed to rehabilitate disaster areas, and (3) indicate the amount of lost material stock that should be taken into consideration during government policy deliberations. Our analysis concludes that the material stock losses of buildings and road infrastructure are 31.8 and 2.1 million tonnes, respectively. This research approach and the use of spatial MSA can be useful for urban planners and may also convey more appropriate information about disposal based on the work of municipalities in disaster-afflicted areas.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Although road construction and use provides significant economic and social benefits, its environmental impact is of growing concern. Roads are one of the greatest greenhouse gas contributors, both directly through fossil energy consumed in mining, transporting, earthworks and paving work, plus the emissions from road use by vehicles. Further, according to the Australian Government, when combined with forecast population growth, internal migration and changes in temperature and rainfall, these are expected to increase road maintenance costs. This discussion paper outlines opportunities within the Australian context for reducing environmental and carbon pressure from road building, and provides a framework for considering the potential future pressures that will affect the resilience of roads to the impacts of climate change and oil vulnerability. Seven strategic areas are outlined for further investigation, including a guide to carbon management for road agencies covering planning, funding, procurement, delivery and maintenance of roads.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Many countries over the last decade, have used performance-based contracting (PBC) to manage and maintain roads. The implementation of PBC provides additional benefits for the government/public such as cost savings and improved conditions of contracted road assets. In Australia, PBC is already being implemented on all categories of roads: national, state, urban and rural. Australian PBC arrangement is designed to turn over control and responsibility for roadway system maintenance, rehabilitation, and capital improvement projects to private contractors. Contractors’ responsibilities include determination of treatment types, the design, programming and the undertaking of works needed to maintain road networks at predetermined performance levels. Indonesia initiated two PBC pilot projects in 2011, the Pantura Section Demak-Trengguli (7.68 kilometers) in Central Java Province and Section Ciasem-Pamanukan (18.5 kilometers) in West Java Province. Both sections are categorized as national roads. The contract duration for both of these projects is four years. To facilitate a possible way forward, it is proposed to conduct a study to understand Australia's experiences of advancing from pilot projects to nation-wide programs using PBC. The study focuses on the scope of contracts, bidding processes, risk allocation, and key drivers, using relevant PBC case studies from Australia. Recommendations for future PBC deployment nation-wide should be based on more research associated with risk allocation. This will include investigation of standard conditions of contract. Implications of the contract clauses for the risk management strategy to be adopted by contractors. Based on the nature of risks, some are best managed by the project owner. It is very important that all parties involved to be open to the new rules of contract and to convince themselves about the potential increased benefits of the use of PBC. The most recent states of challenging issues were explored and described.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Much debate has taken place recently over the potential for entertainment genres and unorthodox forms of news to provide legitimate – indeed democratized – in-roads into the public sphere. Amidst these discussions, however, little thought has been paid to the audiences for programs of this sort, and (even when viewers are considered) the research can too easily treat audiences in homogenous terms and therefore replicate the very dichotomies these television shows directly challenge. This paper is a critical reflection on an audience study into the Australian morning “newstainment” program Sunrise. After examining the show and exploring how it is ‘used’ as a news source, this paper will promote the use of ethnographic study to better conceptualize how citizens integrate and connect the increasingly fragmented and multifarious forms of postmodern political communication available in their everyday lives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper discusses some parallels and contrasts between the legal roads to war and suggest that the case is stronger than ever for adjudication of the matter before an independent tribunal where the competing views can be tested.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this project is to develop a systematic investment decision-making framework for infrastructure asset management by incorporation economic justification, social and environmental consideration in the decision-making process. This project assesses the factors that are expected to provide significant impacts on the variability of expenditures. A procedure for assessing risk and reliability for project investment appraisals will be developed. The project investigates public perception, social and environmental impacts on road infrastructure investment. This research will contribute to the debate about how important social and environmental issues should be incorporated into the investment decision-making process for infrastructure asset management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Queensland Department of Public Works (QDPW) and the Queensland Department of Main Roads (QDMR) have identified a need for industry e-contracting guidelines in the short to medium term. Each of these organisations conducts tenders and contracts for over $600 million annually. This report considers the security and legal issues relating to the shift from a paper-based tendering system to an electronic tendering system. The research objectives derived from the industry partners include: • a review of current standards and e-tendering systems; • a summary of legal requirements impacting upon e-tendering; • an analysis of the threats and requirements for any e-tendering system; • the identification of outstanding issues; • an evaluation of possible e-tendering architectures; • recommendations for e-tendering systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the previous research CRC CI 2001-010-C “Investment Decision Framework for Infrastructure Asset Management”, a method for assessing variation in cost estimates for road maintenance and rehabilitation was developed. The variability of pavement strength collected from a 92km national highway was used in the analysis to demonstrate the concept. Further analysis was conducted to identify critical input parameters that significantly affect the prediction of road deterioration. In addition to pavement strength, rut depth, annual traffic loading and initial roughness were found to be critical input parameters for road deterioration. This report presents a method developed to incorporate other critical parameters in the analysis, such as unit costs, which are suspected to contribute to a certain degree to cost estimate variation. Thus, the variability of unit costs will be incorporated in this analysis. Bruce Highway located in the tropical east coast of Queensland has been identified to be the network for the analysis. This report presents a step by step methodology for assessing variation in road maintenance and rehabilitation cost estimates.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An estimation of costs for maintenance and rehabilitation is subject to variation due to the uncertainties of input parameters. This paper presents the results of an analysis to identify input parameters that affect the prediction of variation in road deterioration. Road data obtained from 1688 km of a national highway located in the tropical northeast of Queensland in Australia were used in the analysis. Data were analysed using a probability-based method, the Monte Carlo simulation technique and HDM-4’s roughness prediction model. The results of the analysis indicated that among the input parameters the variability of pavement strength, rut depth, annual equivalent axle load and initial roughness affected the variability of the predicted roughness. The second part of the paper presents an analysis to assess the variation in cost estimates due to the variability of the overall identified critical input parameters.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We love the automobile and the independence that it gives us. We are more mobile than we have ever been before in recorded history. In Australia 80% of journeys are by private motor vehicle. But it is becoming increasingly obvious that this era has a very limited lifespan. Fuel prices have skyrocketed recently with no end in sight. In spite of massive amounts of road construction, our cities are becoming increasingly congested. We desperately need to address climate change and the automobile is a major contributor. Carbon trading schemes will put even more upward pressure on fuel prices. At some point in the near future, most of us will need to reconsider our automobile usage whether we like it or not. The time to plan for the future is now. But what will happen to our mobility when access to cheap and available petroleum becomes a thing of the past? Will we start driving electric/hydrogen/ethanol vehicles? Or will we flock to public transport? Will our public transport systems cope with a massive increase in demand? Will thousands of people take to alternatives such as bicycles? If so, where do we put them? How do we change our roads to cope? How do we change our buildings to suit? Will we need recharging stations in our car park for example? Some countries are less reliant on the car than others e.g. Holland and Germany. How can the rest of the world learn from them? This paper discusses many of the likely outcomes of the inevitable shift away from society’s reliance on petroleum and examines the expected impact on the built environment. It also looks at ways in which the built environment can be planned to help ease the transition to a fossil free world. 1.