854 resultados para Risk maintenance


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report presents the demonstration of software agents prototype system for improving maintenance management [AIMM] including: • Developing and implementing a user focused approach for mining the maintenance data of buildings. This report presents the demonstration of software agents prototype system for improving maintenance management [AIMM] including: • Developing and implementing a user focused approach for mining the maintenance data of buildings. • Refining the development of a multi agent system for data mining in virtual environments (Active Worlds) by developing and implementing a filtering agent on the results obtained from applying data mining techniques on the maintenance data. • Integrating the filtering agent within the multi agents system in an interactive networked multi-user 3D virtual environment. • Populating maintenance data and discovering new rules of knowledge.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Australia’s civil infrastructure assets of roads, bridges, railways, buildings and other structures are worth billions of dollars. Road assets alone are valued at around A$ 140 billion. As the condition of assets deteriorate over time, close to A$10 billion is spent annually in asset maintenance on Australia's roads, or the equivalent of A$27 million per day. To effectively manage road infrastructures, firstly, road agencies need to optimise the expenditure for asset data collection, but at the same time, not jeopardise the reliability in using the optimised data to predict maintenance and rehabilitation costs. Secondly, road agencies need to accurately predict the deterioration rates of infrastructures to reflect local conditions so that the budget estimates could be accurately estimated. And finally, the prediction of budgets for maintenance and rehabilitation must provide a certain degree of reliability. A procedure for assessing investment decision for road asset management has been developed. The procedure includes: • A methodology for optimising asset data collection; • A methodology for calibrating deterioration prediction models; • A methodology for assessing risk-adjusted estimates for life-cycle cost estimates. • A decision framework in the form of risk map

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The report presents a methodology for whole of life cycle cost analysis of alternative treatment options for bridge structures, which require rehabilitation. The methodology has been developed after a review of current methods and establishing that a life cycle analysis based on a probabilistic risk approach has many advantages including the essential ability to consider variability of input parameters. The input parameters for the analysis are identified as initial cost, maintenance, monitoring and repair cost, user cost and failure cost. The methodology utilizes the advanced simulation technique of Monte Carlo simulation to combine a number of probability distributions to establish the distribution of whole of life cycle cost. In performing the simulation, the need for a powerful software package, which would work with spreadsheet program, has been identified. After exploring several products on the market, @RISK software has been selected for the simulation. In conclusion, the report presents a typical decision making scenario considering two alternative treatment options.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the previous phase of this project, 2002-059-B Case-Based Reasoning in Construction and Infrastructure Projects, demonstration software was developed using a case-base reasoning engine to access a number of sources of information on lifetime of metallic building components. One source of information was data from the Queensland Department of Public Housing relating to maintenance operations over a number of years. Maintenance information is seen as being a particularly useful source of data about service life of building components as it relates to actual performance of materials in the working environment. If a building is constructed in 1984 and the maintenance records indicate that the guttering was replaced in 2006, then the service life of the gutters was 22 years in that environment. This phase of the project aims to look more deeply at the Department of Housing data, as an example of maintenance records, and formulate methods for using this data to inform the knowledge of service lifetimes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the previous research CRC CI 2001-010-C “Investment Decision Framework for Infrastructure Asset Management”, a method for assessing variation in cost estimates for road maintenance and rehabilitation was developed. The variability of pavement strength collected from a 92km national highway was used in the analysis to demonstrate the concept. Further analysis was conducted to identify critical input parameters that significantly affect the prediction of road deterioration. In addition to pavement strength, rut depth, annual traffic loading and initial roughness were found to be critical input parameters for road deterioration. This report presents a method developed to incorporate other critical parameters in the analysis, such as unit costs, which are suspected to contribute to a certain degree to cost estimate variation. Thus, the variability of unit costs will be incorporated in this analysis. Bruce Highway located in the tropical east coast of Queensland has been identified to be the network for the analysis. This report presents a step by step methodology for assessing variation in road maintenance and rehabilitation cost estimates.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Reliable budget/cost estimates for road maintenance and rehabilitation are subjected to uncertainties and variability in road asset condition and characteristics of road users. The CRC CI research project 2003-029-C ‘Maintenance Cost Prediction for Road’ developed a method for assessing variation and reliability in budget/cost estimates for road maintenance and rehabilitation. The method is based on probability-based reliable theory and statistical method. The next stage of the current project is to apply the developed method to predict maintenance/rehabilitation budgets/costs of large networks for strategic investment. The first task is to assess the variability of road data. This report presents initial results of the analysis in assessing the variability of road data. A case study of the analysis for dry non reactive soil is presented to demonstrate the concept in analysing the variability of road data for large road networks. In assessing the variability of road data, large road networks were categorised into categories with common characteristics according to soil and climatic conditions, pavement conditions, pavement types, surface types and annual average daily traffic. The probability distributions, statistical means, and standard deviation values of asset conditions and annual average daily traffic for each type were quantified. The probability distributions and the statistical information obtained in this analysis will be used to asset the variation and reliability in budget/cost estimates in later stage. Generally, we usually used mean values of asset data of each category as input values for investment analysis. The variability of asset data in each category is not taken into account. This analysis method demonstrated that it can be used for practical application taking into account the variability of road data in analysing large road networks for maintenance/rehabilitation investment analysis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With an increase in growing number of aging public building infrastructure globally, there is an opportunity for an efficient life care management rather then mere demolition and rebuild. By carefully implementing appropriate structural engineering practices with facility management, the whole of life cycle costs for public building assets can be optimised and public money can be saved and better utilised elsewhere. A need of decision support tool/methodology which can assist asset manager make better decision among demolish, refurbish, do nothing or rebuilt option for any typical building under consideration is growing in order to optimise maintenance funds. The paper is part of research project focusing on development of such methodology known as residual service life prediction. The paper is mainly focusing on following three major aspects of public building infrastructure; first, issues and challenges in optimisation of maintenance funds, second, residual service life prediction methodology and issues and challenges in the development of such methodology. The paper concludes with the authors’ observations and further research potentials

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In my work with secondary school students who have disengaged from mainstream classrooms, I have often been surprised at the ways they enthusiastically engage with the projects on offer. They have demonstrated that, in apparent contradiction of their classroom behaviour, they still maintain hope in achieving a positive outcome from education. In a long-running schools-university project employing a “students-as-researchers” approach to investigating educational disadvantage, “at-risk” students have produced high quality results. Naturally, I wanted to know what it was about this sort of pedagogy that seemed to work for them. In this chapter, then, I outline the project and discuss some reasons for disengagement. I then address the features of the project that the participants themselves have identified as being instrumental in their re-engagement with formal education. Finally, I consider how these features may be transposed to maintaining the educational engagement of at-risk students in mainstream classrooms.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A study has been conducted to investigate current practices on decision-making under risk and uncertainty for infrastructure project investments. It was found that many European countries such as the UK, France, Germany including Australia use scenarios for the investigation of the effects of risk and uncertainty of project investments. Different alternative scenarios are mostly considered during the engineering economic cost-benefit analysis stage. For instance, the World Bank requires an analysis of risks in all project appraisals. Risk in economic evaluation needs to be addressed by calculating sensitivity of the rate of return for a number of events. Risks and uncertainties of project developments arise from various sources of errors including data, model and forecasting errors. It was found that the most influential factors affecting risk and uncertainty resulted from forecasting errors. Data errors and model errors have trivial effects. It was argued by many analysts that scenarios do not forecast what will happen but scenarios indicate only what can happen from given alternatives. It was suggested that the probability distributions of end-products of the project appraisal, such as cost-benefit ratios that take forecasting errors into account, are feasible decision tools for economic evaluation. Political, social, environmental as well as economic and other related risk issues have been addressed and included in decision-making frameworks, such as in a multi-criteria decisionmaking framework. But no suggestion has been made on how to incorporate risk into the investment decision-making process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: Injury is the leading cause of mortality for young people in Australia (AIHW, 2008). Adolescent injury mortality is consistently associated with risk taking behaviour, including transport and interpersonal violence (AIHW, 2003), which often occurs in the context of alcohol and other substance use. A rapid increase in risk taking and injury through early to late adolescence highlights the need for effective school based interventions. Aim: The aim of the current research was to examine the relationship between school connectedness and adolescent risk and injury, in order to inform effective prevention approaches. School connectedness, or students’ feelings of belongingness to school, has been shown to be a critical protective factor in adolescence which can be targeted effectively through teacher interventions. Despite evidence linking low school connectedness with increased health risk behaviour, including substance use and violence, research has not yet addressed possible links between connectedness and a broader range of risk taking behaviours (e.g. transport risks) or injury. Method: This study involved background data collection to inform the development of an intervention. A total of 595 Year 9 students (aged 13-14 years) from 5 Southeast Queensland high schools completed questionnaires that included measures of school connectedness, risk taking behaviour, alcohol and other substance use, and injuries. Results: Increased school connectedness was found to be associated with fewer transport risk behaviours and with decreased alcohol and other substance use for both males and females. Similarly, increased school connectedness was associated with fewer passenger and motorcycle injuries for male participants. Both males and females with increased school connectedness reported fewer alcohol related injuries. Implications: These results indicate that school connectedness appears to have protective effects for early adolescence. These findings may also hold for older adolescents and indicate that it may be an important factor to target in school based risk and injury prevention programs. A school connectedness intervention is currently being designed, focusing on teacher professional development. The intervention will be implemented in conjunction with a curriculum based injury prevention program for Year 9 students and will be evaluated through a large scale cluster randomised trial involving 26 schools.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aims: Changing behaviour to reduce stroke risk is a difficult prospect made particularly complex because of psychological factors. This study examined predictors of intentions and behaviours to reduce stroke risk in a sample of at-risk individuals, seeking to find how knowledge and health beliefs influenced both intention and actual behaviour to reduce stroke risk. Methods: A repeated measures design was used to assess behavioural intentions at time 1 (T1) and subsequent behaviour (T2). One hundred and twenty six respondents completed an online survey at T1, and behavioural follow-up data were collected from approximately 70 participants 1 month later. Predictors were stroke knowledge, demographic variables, and beliefs about stroke that were derived from an expanded health belief model. Dependent measures were: exercise and weight loss, and intention to engage in these behaviours to reduce stroke risk. Findings: Multiple hierarchical regression analyses showed that, for exercise and weight loss respectively, different health beliefs predicted intention to control stroke risk. The most important exercise-related health beliefs were benefits, susceptibility, and self-efficacy; for weight loss, the most important beliefs were barriers, and to a lesser degree, susceptibility and subjective norm. Conclusions: Health beliefs may play an important role in stroke prevention, particularly beliefs about susceptibility because these emerged for both behaviours. Stroke education and prevention programmes that selectively target the health beliefs relevant to specific behaviours may prove most efficacious.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Introduction: Work engagement is a recent application of positive psychology and refers to a positive, fulfilling, work-related state of mind characterized by vigor, dedication and absorption. Despite theoretical assumptions, there is little published research on work engagement, due primarily to its recent emergence as a psychological construct. Furthermore, examining work engagement among high-stress occupations, such as police, is useful because police officers are generally characterized as having a high level of work engagement. Previous research has identified job resources (e.g. social support) as antecedents of work engagement. However detailed evaluation of job demands as an antecedent of work engagement within high-stress occupations has been scarce. Thus our second aim was to test job demands (i.e. monitoring demands and problem-solving demands) and job resources (i.e. time control, method control, supervisory support, colleague support, and friend and family support) as antecedents of work engagement among police officers. Method: Data were collected via a self-report online survey from one Australian state police service (n = 1,419). Due to the high number of hypothesized antecedent variables, hierarchical multiple regression analysis was employed rather than structural equation modelling. Results: Work engagement reported by police officers was high. Female officers had significantly higher levels of work engagement than male officers, while officers at mid-level ranks (sergeant) reported the lowest levels of work engagement. Job resources (method control, supervisor support and colleague support) were significant antecedents of three dimensions of work engagement. Only monitoring demands were significant antecedent of the absorption. Conclusion: Having healthy and engaged police officers is important for community security and economic growth. This study identified some common factors which influence work engagement experienced by police officers. However, we also note that excessive work engagement can yield negative outcomes such as psychological distress.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background Primary prevention of childhood overweight is an international priority. In Australia 20-25% of 2-8 year olds are already overweight. These children are at substantially increased the risk of becoming overweight adults, with attendant increased risk of morbidity and mortality. Early feeding practices determine infant exposure to food (type, amount, frequency) and include responses (eg coercion) to infant feeding behaviour (eg. food refusal). There is correlational evidence linking parenting style and early feeding practices to child eating behaviour and weight status. A focus on early feeding is consistent with the national focus on early childhood as the foundation for life-long health and well being. The NOURISH trial aims to implement and evaluate a community-based intervention to promote early feeding practices that will foster healthy food preferences and intake and preserve the innate capacity to self-regulate food intake in young children. Methods/Design This randomised controlled trial (RCT) aims to recruit 820 first-time mothers and their healthy term infants. A consecutive sample of eligible mothers will be approached postnatally at major maternity hospitals in Brisbane and Adelaide. Initial consent will be for re-contact for full enrolment when the infants are 4-7 months old. Individual mother- infant dyads will be randomised to usual care or the intervention. The intervention will provide anticipatory guidance via two modules of six fortnightly parent education and peer support group sessions, each followed by six months of regular maintenance contact. The modules will commence when the infants are aged 4-7 and 13-16 months to coincide with establishment of solid feeding, and autonomy and independence, respectively. Outcome measures will be assessed at baseline, with follow up at nine and 18 months. These will include infant intake (type and amount of foods), food preferences, feeding behaviour and growth and self-reported maternal feeding practices and parenting practices and efficacy. Covariates will include sociodemographics, infant feeding mode and temperament, maternal weight status and weight concern and child care exposure. Discussion Despite the strong rationale to focus on parents’ early feeding practices as a key determinant of child food preferences, intake and self-regulatory capacity, prospective longitudinal and intervention studies are rare. This trial will be amongst to provide Level II evidence regarding the impact of an intervention (commencing prior to age 12 months) on children’s eating patterns and behaviours. Trial Registration: ACTRN12608000056392