Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.
Resumo:
This document provides an overview of the differences and similarities in the objectives and implementation frameworks of the training and employment policies applying to public construction projects in Western Australia and Queensland. The material in the document clearly demonstrates the extent to which approaches to the pursuit of training objectives in particular have been informed by the experiences of other jurisdictions. The two State governments now have very similar approaches to the promotion of training with the WA government basing a good part of its policy approach on the “Queensland model”. As the two States share many similar economic and other characteristics, and have very similar social and economic goals, this similarity is to be expected. The capacity to benefit from the experiences of other jurisdictions is to be welcomed. The similarity in policy approach also suggests a potential for ongoing collaborations between the State governments on research aimed at further improving training and employment outcomes via public construction projects.
Resumo:
This document outlines a framework that could be used by government agencies in assessing policy interventions aimed at achieving social outcomes from government construction contracts. The framework represents a rational interpretation of the information gathered during the multi-outcomes construction policies project. The multi-outcomes project focused on the costs and benefits of using public construction contracts to promote the achievement of training and employment and public art objectives. The origin of the policy framework in a cost-benefit appraisal of current policy interventions is evidenced by its emphasis on sensitivity to policy commitment and project circumstances (especially project size and scope).The quantitative and qualitative analysis conducted in the multi-outcomes project highlighted, first, that in the absence of strong industry commitment to policy objectives, policy interventions typically result in high levels of avoidance activity, substantial administrative costs and very few benefits. Thus, for policy action on, for example, training or local employment to be successful compliance issues must be adequately addressed. Currently it appears that pre-qualification schemes (similar to the Priority Access Scheme) and schemes that rely on measuring, for example, the training investments of contractors within particular projects do not achieve high levels of compliance and involve significant administrative costs. Thus, an alternative is suggested in the policy framework developed here: a levy on each public construction project – set as a proportion of the total project costs. Although a full evaluation of this policy alternative was beyond the scope of the multi-outcomes construction policies project, it appears to offer the potential to minimize the transaction costs on contractors whilst enabling the creation of a training agency dedicated to improving the supply of skilled construction labour. A recommendation is thus made that this policy alternative be fully researched and evaluated. As noted above, the outcomes of the multi-outcomes research project also highlighted the need for sensitivity to project circumstances in the development and implementation of polices for public construction projects. Ideally a policy framework would have the flexibility to respond to circumstances where contractors share a commitment to the policy objectives and are able to identify measurable social outcomes from the particular government projects they are involved in. This would involve a project-by-project negotiation of goals and performance measures. It is likely to only be practical for large, longer term projects.
Resumo:
The Cooperative Research Centre (CRC) for Construction Innovation research project 2001-008-C: ‘Project Team Integration: Communication, Coordination and Decision Support’, is supported by a number of Australian industry, government and university based project partners including: Queensland University of Technology (QUT); Commonwealth Scientific Industrial Research Organisation (CSIRO), University of Newcastle; Queensland Department of Public Works (QDPW); and the Queensland Department of Main Roads (QDMR). Supporting the various research aims and objectives of the 2001-008-C (Part B) QUT / Industry Partner agreements, and as a major deliverable for the project, this report is not intended as a comprehensive statement of Architectural, Engineering and Contractor (AEC) industry best practice recommendations. Rather it should read as a set of research and industry recommended guidelines, based on extensive literature reviews and two years worth of investigative activities examining both public and private industry uptake of innovative information and communication technology (ICT) solutions, whilst highlighting the overall need for culture change.
Resumo:
The construction industry is categorised as being an information-intensive industry and described as one of the most important industries in any developed country, facing a period of rapid and unparalleled change (Industry Science Resources 1999) (Love P.E.D., Tucker S.N. et al. 1996). Project communications are becoming increasingly complex, with a growing need and fundamental drive to collaborate electronically at project level and beyond (Olesen K. and Myers M.D. 1999; Thorpe T. and Mead S. 2001; CITE 2003). Yet, the industry is also identified as having a considerable lack of knowledge and awareness about innovative information and communication technology (ICT) and web-based communication processes, systems and solutions which may prove beneficial in the procurement, delivery and life cycle of projects (NSW Government 1998; Kajewski S. and Weippert A. 2000). The Internet has debatably revolutionised the way in which information is stored, exchanged and viewed, opening new avenues for business, which only a decade ago were deemed almost inconceivable (DCITA 1998; IIB 2002). In an attempt to put these ‘new avenues of business’ into perspective, this report provides an overall ‘snapshot’ of current public and private construction industry sector opportunities and practices in the implementation and application of web-based ICT tools, systems and processes (e-Uptake). Research found that even with a reserved uptake, the construction industry and its participating organisations are making concerted efforts (fortunately with positive results) in taking up innovative forms of doing business via the internet, including e-Tendering (making it possible to manage the entire tender letting process electronically and online) (Anumba C.J. and Ruikar K. 2002; ITCBP 2003). Furthermore, Government (often a key client within the construction industry),and with its increased tendency to transact its business electronically, undoubtedly has an effect on how various private industry consultants, contractors, suppliers, etc. do business (Murray M. 2003) – by offering a wide range of (current and anticipated) e-facilities / services, including e-Tendering (Ecommerce 2002). Overall, doing business electronically is found to have a profound impact on the way today’s construction businesses operate - streamlining existing processes, with the growth in innovative tools, such as e-Tender, offering the construction industry new responsibilities and opportunities for all parties involved (ITCBP 2003). It is therefore important that these opportunities should be accessible to as many construction industry businesses as possible (The Construction Confederation 2001). Historically, there is a considerable exchange of information between various parties during a tendering process, where accuracy and efficiency of documentation is critical. Traditionally this process is either paper-based (involving large volumes of supporting tender documentation), or via a number of stand-alone, non-compatible computer systems, usually costly to both the client and contractor. As such, having a standard electronic exchange format that allows all parties involved in an electronic tender process to access one system only via the Internet, saves both time and money, eliminates transcription errors and increases speed of bid analysis (The Construction Confederation 2001). Supporting this research project’s aims and objectives, researchers set to determine today’s construction industry ‘current state-of-play’ in relation to e-Tendering opportunities. The report also provides brief introductions to several Australian and International e-Tender systems identified during this investigation. e-Tendering, in its simplest form, is described as the electronic publishing, communicating, accessing, receiving and submitting of all tender related information and documentation via the internet, thereby replacing the traditional paper-based tender processes, and achieving a more efficient and effective business process for all parties involved (NT Governement 2000; NT Government 2000; NSW Department of Commerce 2003; NSW Government 2003). Although most of the e-Tender websites investigated at the time, maintain their tendering processes and capabilities are ‘electronic’, research shows these ‘eTendering’ systems vary from being reasonably advanced to more ‘basic’ electronic tender notification and archiving services for various industry sectors. Research also indicates an e-Tender system should have a number of basic features and capabilities, including: • All tender documentation to be distributed via a secure web-based tender system – thereby avoiding the need for collating paperwork and couriers. • The client/purchaser should be able to upload a notice and/or invitation to tender onto the system. • Notification is sent out electronically (usually via email) for suppliers to download the information and return their responses electronically (online). • During the tender period, updates and queries are exchanged through the same e-Tender system. • The client/purchaser should only be able to access the tenders after the deadline has passed. • All tender related information is held in a central database, which should be easily searchable and fully audited, with all activities recorded. • It is essential that tender documents are not read or submitted by unauthorised parties. • Users of the e-Tender system are to be properly identified and registered via controlled access. In simple terms, security has to be as good as if not better than a manual tender process. Data is to be encrypted and users authenticated by means such as digital signatures, electronic certificates or smartcards. • All parties must be assured that no 'undetected' alterations can be made to any tender. • The tenderer should be able to amend the bid right up to the deadline – whilst the client/purchaser cannot obtain access until the submission deadline has passed. • The e-Tender system may also include features such as a database of service providers with spreadsheet-based pricing schedules, which can make it easier for a potential tenderer to electronically prepare and analyse a tender. Research indicates the efficiency of an e-Tender process is well supported internationally, with a significant number, yet similar, e-Tender benefits identified during this investigation. Both construction industry and Government participants generally agree that the implementation of an automated e-Tendering process or system enhances the overall quality, timeliness and cost-effectiveness of a tender process, and provides a more streamlined method of receiving, managing, and submitting tender documents than the traditional paper-based process. On the other hand, whilst there are undoubtedly many more barriers challenging the successful implementation and adoption of an e-Tendering system or process, researchers have also identified a range of challenges and perceptions that seem to hinder the uptake of this innovative approach to tendering electronically. A central concern seems to be that of security - when industry organisations have to use the Internet for electronic information transfer. As a result, when it comes to e-Tendering, industry participants insist these innovative tendering systems are developed to ensure the utmost security and integrity. Finally, if Australian organisations continue to explore the competitive ‘dynamics’ of the construction industry, without realising the current and future, trends and benefits of adopting innovative processes, such as e-Tendering, it will limit their globalising opportunities to expand into overseas markets and allow the continuation of international firms successfully entering local markets. As such, researchers believe increased knowledge, awareness and successful implementation of innovative systems and processes raises great expectations regarding their contribution towards ‘stimulating’ the globalisation of electronic procurement activities, and improving overall business and project performances throughout the construction industry sectors and overall marketplace (NSW Government 2002; Harty C. 2003; Murray M. 2003; Pietroforte R. 2003). Achieving the successful integration of an innovative e-Tender solution with an existing / traditional process can be a complex, and if not done correctly, could lead to failure (Bourn J. 2002).
Resumo:
This document provides a review of international and national practices in investment decision support tools in road asset management. Efforts were concentrated on identifying analytic frameworks, evaluation methodologies and criteria adopted by current tools. Emphasis was also given to how current approaches support Triple Bottom Line decision-making. Benefit Cost Analysis and Multiple Criteria Analysis are principle methodologies in supporting decision-making in Road Asset Management. The complexity of the applications shows significant differences in international practices. There is continuing discussion amongst practitioners and researchers regarding to which one is more appropriate in supporting decision-making. It is suggested that the two approaches should be regarded as complementary instead of competitive means. Multiple Criteria Analysis may be particularly helpful in early stages of project development, say strategic planning. Benefit Cost Analysis is used most widely for project prioritisation and selecting the final project from amongst a set of alternatives. Benefit Cost Analysis approach is useful tool for investment decision-making from an economic perspective. An extension of the approach, which includes social and environmental externalities, is currently used in supporting Triple Bottom Line decision-making in the road sector. However, efforts should be given to several issues in the applications. First of all, there is a need to reach a degree of commonality on considering social and environmental externalities, which may be achieved by aggregating the best practices. At different decision-making level, the detail of consideration of the externalities should be different. It is intended to develop a generic framework to coordinate the range of existing practices. The standard framework will also be helpful in reducing double counting, which appears in some current practices. Cautions should also be given to the methods of determining the value of social and environmental externalities. A number of methods, such as market price, resource costs and Willingness to Pay, are found in the review. The use of unreasonable monetisation methods in some cases has discredited Benefit Cost Analysis in the eyes of decision makers and the public. Some social externalities, such as employment and regional economic impacts, are generally omitted in current practices. This is due to the lack of information and credible models. It may be appropriate to consider these externalities in qualitative forms in a Multiple Criteria Analysis. Consensus has been reached in considering noise and air pollution in international practices. However, Australia practices generally omitted these externalities. Equity is an important consideration in Road Asset Management. The considerations are either between regions, or social groups, such as income, age, gender, disable, etc. In current practice, there is not a well developed quantitative measure for equity issues. More research is needed to target this issue. Although Multiple Criteria Analysis has been used for decades, there is not a generally accepted framework in the choice of modelling methods and various externalities. The result is that different analysts are unlikely to reach consistent conclusions about a policy measure. In current practices, some favour using methods which are able to prioritise alternatives, such as Goal Programming, Goal Achievement Matrix, Analytic Hierarchy Process. The others just present various impacts to decision-makers to characterise the projects. Weighting and scoring system are critical in most Multiple Criteria Analysis. However, the processes of assessing weights and scores were criticised as highly arbitrary and subjective. It is essential that the process should be as transparent as possible. Obtaining weights and scores by consulting local communities is a common practice, but is likely to result in bias towards local interests. Interactive approach has the advantage in helping decision-makers elaborating their preferences. However, computation burden may result in lose of interests of decision-makers during the solution process of a large-scale problem, say a large state road network. Current practices tend to use cardinal or ordinal scales in measure in non-monetised externalities. Distorted valuations can occur where variables measured in physical units, are converted to scales. For example, decibels of noise converts to a scale of -4 to +4 with a linear transformation, the difference between 3 and 4 represents a far greater increase in discomfort to people than the increase from 0 to 1. It is suggested to assign different weights to individual score. Due to overlapped goals, the problem of double counting also appears in some of Multiple Criteria Analysis. The situation can be improved by carefully selecting and defining investment goals and criteria. Other issues, such as the treatment of time effect, incorporating risk and uncertainty, have been given scant attention in current practices. This report suggested establishing a common analytic framework to deal with these issues.
Resumo:
The aim of this project is to develop a systematic investment decision-making framework for infrastructure asset management by incorporation economic justification, social and environmental consideration in the decision-making process. This project assesses the factors that are expected to provide significant impacts on the variability of expenditures. A procedure for assessing risk and reliability for project investment appraisals will be developed. The project investigates public perception, social and environmental impacts on road infrastructure investment. This research will contribute to the debate about how important social and environmental issues should be incorporated into the investment decision-making process for infrastructure asset management.
Resumo:
Both in developed and developing economies, major public funding is invested in civil infrastructure assets. Efficiency and comfort level of expected and demanded living standards are largely dependant on the management strategies of these assets. Buildings are one of the major & vital assets, which need to be maintained primarily to ensure its functionality by effective & efficient delivery of services and to optimize economic benefits. Not withstanding, public building infrastructure is not considered in Infrastructure report card published by Australian Infrastructure Report Card Alliance Partners (2001). The reason appears to be not having enough data to rate public building infrastructure. American Infrastructure Report Card (2001) gave “School Buildings” ‘d-’ rating, which is below ‘poor’. For effective asset management of building infrastructure, a need emerged to optimise the budget for managing assets, to cope up with increased user expectations, to response effectively to possible asset failures, to deal with ageing of assets and aging populations and to treat other scenarios including technology advancement and non-asset solutions. John (Asset Management, 2001) suggests that in the area of asset management worldwide, UK, Australia and New Zealand are leading.
Resumo:
Risks and uncertainties are inevitable in engineering projects and infrastructure investments. Decisions about investment in infrastructure such as for maintenance, rehabilitation and construction works can pose risks, and may generate significant impacts on social, cultural, environmental and other related issues. This report presents the results of a literature review of current practice in identifying, quantifying and managing risks and predicting impacts as part of the planning and assessment process for infrastructure investment proposals. In assessing proposals for investment in infrastructure, it is necessary to consider social, cultural and environmental risks and impacts to the overall community, as well as financial risks to the investor. The report defines and explains the concept of risk and uncertainty, and describes the three main methodology approaches to the analysis of risk and uncertainty in investment planning for infrastructure, viz examining a range of scenarios or options, sensitivity analysis, and a statistical probability approach, listed here in order of increasing merit and complexity. Forecasts of costs, benefits and community impacts of infrastructure are recognised as central aspects of developing and assessing investment proposals. Increasingly complex modelling techniques are being used for investment evaluation. The literature review identified forecasting errors as the major cause of risk. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. For risks that cannot be readily quantified, assessment techniques commonly include classification or rating systems for likelihood and consequence. The report outlines the system used by the Australian Defence Organisation and in the Australian Standard on risk management. After each risk is identified and quantified or rated, consideration can be given to reducing the risk, and managing any remaining risk as part of the scope of the project. The literature review identified use of risk mapping techniques by a North American chemical company and by the Australian Defence Organisation. This literature review has enabled a risk assessment strategy to be developed, and will underpin an examination of the feasibility of developing a risk assessment capability using a probability approach.
Resumo:
This report fully summarises a project designed to enhance commercial real estate performance within both operational and investment contexts through the development of a model aimed at supporting improved decision-making. The model is based on a risk adjusted discounted cash flow, providing a valuable toolkit for building managers, owners, and potential investors for evaluating individual building performance in terms of financial, social and environmental criteria over the complete life-cycle of the asset. The ‘triple bottom line’ approach to the evaluation of commercial property has much significance for the administrators of public property portfolios in particular. It also has applications more generally for the wider real estate industry given that the advent of ‘green’ construction requires new methods for evaluating both new and existing building stocks. The research is unique in that it focuses on the accuracy of the input variables required for the model. These key variables were largely determined by market-based research and an extensive literature review, and have been fine-tuned with extensive testing. In essence, the project has considered probability-based risk analysis techniques that required market-based assessment. The projections listed in the partner engineers’ building audit reports of the four case study buildings were fed into the property evaluation model developed by the research team. The results are strongly consistent with previously existing, less robust evaluation techniques. And importantly, this model pioneers an approach for taking full account of the triple bottom line, establishing a benchmark for related research to follow. The project’s industry partners expressed a high degree of satisfaction with the project outcomes at a recent demonstration seminar. The project in its existing form has not been geared towards commercial applications but it is anticipated that QDPW and other industry partners will benefit greatly by using this tool for the performance evaluation of property assets. The project met the objectives of the original proposal as well as all the specified milestones. The project has been completed within budget and on time. This research project has achieved the objective by establishing research foci on the model structure, the key input variable identification, the drivers of the relevant property markets, the determinants of the key variables (Research Engine no.1), the examination of risk measurement, the incorporation of risk simulation exercises (Research Engine no.2), the importance of both environmental and social factors and, finally the impact of the triple bottom line measures on the asset (Research Engine no. 3).
Resumo:
Deficiencies in the design and operation of office buildings can give rise to high social, environmental and economic (triple bottom line) costs. As a result, there are significant pressures and incentives to develop ‘smart building’ technologies that can facilitate improved indoor environment quality (IEQ), and more energy efficient operation of office buildings. IEQ indicators include lighting, ventilation, thermal comfort, indoor air quality and noise. In response to this, the CRC for Construction Innovation commissioned a six-month scoping study (Project no. 2002-043) to examine how different technologies could be used to improve the ‘triple bottom line’ for office buildings. The study was supported by three industry partners, Bovis Lend Lease, Arup, and The Queensland Department of Public Works. The objective of the study was to look at the history, trends, drivers, new technologies and potential application areas related to the operation of healthy and efficient office buildings. The key output from the study was a recommendation for a prototype system for intelligent monitoring and control of an office environment, based on identified market, technical and user requirements and constraints.
Resumo:
A trip was undertaken to look at concerns of Public Works and Main Roads Departments of Queensland. David Paterson and Wayne Ganther from CSIRO travelled to the Sunshine Coast with Alan Carse of Queensland Department of Main Roads and Michael Ball of Queensland Department of Public Works. We were also joined for part of the visits by Ed Bowers of QBuild which is a commercial unit of Public Works responsible for maintenance of Public Works. During the trip we visited a bridge on the David Low Way at Sunrise Beach near Noosa. This bridge was in a serve marine environment with high salt content in the concrete and corrosion of the galvanised guardrails and barriers. Also the foreshore at Coolum was visited and the use of stainless steel was examined. This is discussed in this report. Most problems stemmed from incorrect specification due to lack of awareness of the severity of the environment. The companion report Visit to Schools Report 2002-059-B No 7. covers the visit to four schools north of Caloundra.
Resumo:
The Queensland Department of Public Works (QDPW) and the Queensland Department of Main Roads (QDMR) have identified a need for industry e-contracting guidelines in the short to medium term. Each of these organisations conducts tenders and contracts for over $600 million annually. This report considers the security and legal issues relating to the shift from a paper-based tendering system to an electronic tendering system. The research objectives derived from the industry partners include: • a review of current standards and e-tendering systems; • a summary of legal requirements impacting upon e-tendering; • an analysis of the threats and requirements for any e-tendering system; • the identification of outstanding issues; • an evaluation of possible e-tendering architectures; • recommendations for e-tendering systems.
Resumo:
This is an internal report of the BRITE Project’s activities for 2003. The goal of the Project is to improve the incidence and quality of innovation in the Australian building and construction industry. The primary aim of the year’s work was to complete six case studies of innovation in the Australian building and construction industry. A secondary aim was to prepare for the Project’s innovation survey to be conducted in 2004. The case study program was undertaken to demonstrate the benefits of innovation and show how businesses successfully implement their innovations. The innovation survey is intended to run every 2nd year over the life of the CRC in order to benchmark innovation performance as a tool for public sector policy development and business strategy development. Appendix A contains a list of papers produced by the BRITE Project in 2003. The remainder of this report focuses on the case study program, which was successfully completed during 2003, with six booklets being produced.
Resumo:
The BRITE Project undertook six innovation case studies of building and construction projects in 2005. The purpose of the program was to demonstrate the benefits of innovation and highlight the nature of successful implementation strategies. The cases were selected following a public call in industry magazines across Australia, which resulted in approximately 50 nominations. The six selected case studies resulted in three prominent contributions to knowledge