384 resultados para Project performance Infrastructure


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Since 2007 Kite Arts Education Program (KITE), based at Queensland Performing Arts Centre (QPAC), has been engaged in delivering a series of theatre-based experiences for children in low socio-economic primary schools in Queensland. The artist in residence (AIR) project titled Yonder includes performances developed by the children with the support and leadership of teacher artists from KITE for their community and parents/carers,supported by a peak community cultural institution. In 2009,Queensland Performing Arts Centre partnered with Queensland University of Technology (QUT) Creative Industries Faculty (Drama) to conduct a three-year evaluation of the Yonder project to understand the operational dynamics, artistic outputs and the educational benefits of the project. This paper outlines the research findings for children engaged in the Yonder project in the interrelated areas of literacy development and social competencies. Findings are drawn from six iterations of the project in suburban locations on the edge of Brisbane city and in regional Queensland.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Value Management (VM) is a proven methodology that provides a structured framework using supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It offers an exceptionally robust approach to exploring the need and function of projects to be aligned with client’s objectives. The functional analysis and creativity phases of VM are crucial as it focused on utilising innovative thinking to understand the objectives of clients’ projects and provide value-adding solutions at the early discovery stages of projects. There is however a perception of VM as just being another cost-cutting tool, which has overshadowed the fundamental benefits of the method, therefore negating both influence and wider use in the construction industry. This paper describes findings from a series of case studies conducted at project and corporate levels of a current public funded infrastructure projects in Malaysia. The study aims to investigate VM processes practised by the project client organisation and evaluate the effects of project team involvement in VM workshops during the design-stage of these projects. The focus of the study is on how issues related to ‘upstream’ infrastructure design aimed at improving ‘downstream’ construction process on-site, are being resolved through multi-disciplinary team consideration and decision-making. Findings from the case studies indicate that the mix of disciplines of project team members at a design-stage of a VM workshop has minimal influence on improving construction processes. However, the degree of interaction, institutionalized thinking, cultural dimensions and visualization aids adopted, have a significant impact in maximizing creativity amongst project team members during VM workshop. The case studies conducted for this research have focused on infrastructure projects that utilise traditional VM workshop as client’s chosen VM methodology to review and develop designs. Documents review and semi-structured interview with project teams are used as data collection techniques for the case study. The significant outcomes of this research are expected to offer alternative perspectives for construction professionals and clients to minimise the constraints and strengthen strategies for implementing VM on future projects.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In the modern built environment, building construction and demolition consume a large amount of energy and emits greenhouse gasses due to widely used conventional construction materials such as reinforced and composite concrete. These materials consume high amount of natural resources and possess high embodied energy. More energy is required to recycle or reuse such materials at the cessation of use. Therefore, it is very important to use recyclable or reusable new materials in building construction in order to conserve natural resources and reduce the energy and emissions associated with conventional materials. Advancements in materials technology have resulted in the introduction of new composite and hybrid materials in infrastructure construction as alternatives to the conventional materials. This research project has developed a lightweight and prefabricatable Hybrid Composite Floor Plate System (HCFPS) as an alternative to conventional floor system, with desirable properties, easy to construct, economical, demountable, recyclable and reusable. Component materials of HCFPS include a central Polyurethane (PU) core, outer layers of Glass-fiber Reinforced Cement (GRC) and steel laminates at tensile regions. This research work explored the structural adequacy and performance characteristics of hybridised GRC, PU and steel laminate for the development of HCFPS. Performance characteristics of HCFPS were investigated using Finite Element (FE) method simulations supported by experimental testing. Parametric studies were conducted to develop the HCFPS to satisfy static performance using sectional configurations, spans, loading and material properties as the parameters. Dynamic response of HCFPS floors was investigated by conducting parametric studies using material properties, walking frequency and damping as the parameters. Research findings show that HCFPS can be used in office and residential buildings to provide acceptable static and dynamic performance. Design guidelines were developed for this new floor system. HCFPS is easy to construct and economical compared to conventional floor systems as it is lightweight and prefabricatable floor system. This floor system can also be demounted and reused or recycled at the cessation of use due to its component materials.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The natural disasters incident that frequently hit Indonesia are floods, severe droughts, tsunamis, earth-quakes, volcano, eruptions, landslides, windstorm and forest fires. The impact of those natural disasters are significantly severe and affecting the quality of life of the community due to the breakdown of the public as-sets as one source to deliver public services. This paper is aimed to emphasis the importance of natural disaster risk-informed in relation to public asset management in Indonesian Central Government, particularly in asset planning stage where asset decision is made as the gate into the whole public asset management processes. A Case study in the Ministry of Finance Indonesia as the central government public asset manager and in 5 (five) line ministries/governmental agencies as public asset users was used as the approach to achieved the research objective. The case study devoured three data collection techniques i.e. interviews, observations and document archival which will be analysed by a content analysis approach. The result of the study indicates that Indonesian geographical position exposing many of public infra-structure assets as a high vulnerability to natural disasters. Information on natural-disaster trends and predictions to identify and measure the risks are available, however, such information are not utilise and integrated to the process of public infrastructure asset planning as the gate to the whole public asset management processes. Therefore, in order to accommodate and incorporate this natural disaster risk-information into public asset management processes, particularly in public asset planning, a public asset performance measurements framework should be adopted and applied in the process as one sources in making decision for infrastructure asset planning. Findings from this study provide useful input for the Ministry of Finance as public asset manager, scholars and private asset management practitioners in Indonesia to establish natural disaster risks awareness in public infrastructure asset management processes.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The thesis provides a framework for potential implementation of the design-build (DB) project delivery system in road infrastructure projects in Indonesia. This framework proposed a structure of the hierarchy of factors promoting the potential implementation of the DB project delivery system and introduced ways to implement the DB project delivery system through level of hierarchical factors. These findings not only give benefit to the academic knowledge but also to the public officials in guiding them with regard to the priority of promoting factors in the process to implement the DB system.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The thesis develops an Organisational Culture (OC) based framework for potentially improving the current practice of the infrastructure project selection process (PSP) in Indonesia, particularly for regional road projects. This framework is developed to address the suggestion emanating from the research that there is a need for strengthening the relevant organisational culture dimensions and making changes to current organisational culture profiles to support the effectiveness of the decision-making process of the current PSP. The findings not only benefit existing knowledge but also provide practical contributions for those decision-makers within the Indonesian regional government that are involved in PSP, i.e. by raising the awareness of the influence and the role of organisational culture.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Nowadays, most of the infrastructure development projects undertaken are complex in nature. Practically, public clients who do not have a good understanding of the design and management may suffer severe losses, especially for infrastructure projects. There is a need for luring the right consultant to secure client's investment in infrastructure developments. Throughout the project life cycle, consultants play vital role from the inception to completion stage of a project. A few studies in Malaysia show that infrastructure projects involving irrigation and drainage have experience problems such as poor workmanship, delay and cost overrun due to the consultant's inability or the client incompetence of recruiting consultants in time. This highlights the need of aided decision making and an efficient system to select the best consultant by using Decision Support System (DSS). On the other hand, recent trends reveal that most DSS in construction only concentrate on decision model development. These models are impractical and unused as they are complicated or difficult for laymen such as project managers to utilize. Thus, this research attempts to develop an efficient DSS for consultant selection namely consultDeSS. Driven by the motivation and research aims, this study deployed Design Science Research Methodology (DSRM) dominant with a combination of case studies at the Malaysian Department of Irrigation and Drainage (DID). Two real projects involving irrigation and drainage infrastructure were used to design, implement and evaluate the artefact. The 3-tier consultDeSS was revised after the evaluation and the design was significantly improved based on user feedback. By developing desirable tools that fit client's needs will enhance the productivity and minimize conflict within groups and organisations. The tool is more usable and efficient compared to previous studies in construction. Thus, this research has demonstrated a purposeful artefact with a practical and valid structured development approach that is applicable in a variety of problems in construction discipline.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The US National Institute of Standards and Technology (NIST) showed that, in 2004, owners and operations managers bore two thirds of the total industry cost burden from inadequate interoperability in construction projects from inception to operation, amounting to USD10.6 billion. Building Information Modelling (BIM) and similar tools were identified by Engineers Australia in 2005 as potential instruments to significantly reduce this sum, which in Australia could amount to total industry-wide cost burden of AUD12 billion. Public sector road authorities in Australia have a key responsibility in driving initiatives to reduce greenhouse gas emissions from the construction and operations of transport infrastructure. However, as previous research has shown the Environmental Impact Assessment process, typically used for project approvals and permitting based on project designs available at the consent stage, lacks Key Performance Indicators (KPIs) that include long-term impact factors and transfer of information throughout the project life cycle. In the building construction industry, BIM is widely used to model sustainability KPIs such as energy consumption, and integrated with facility management systems. This paper proposes that a similar use of BIM in early design phases of transport infrastructure could provide: (i) productivity gains through improved interoperability and documentation; (ii) the opportunity to carry out detailed cost-benefit analyses leading to significant operational cost savings; (iii) coordinated planning of street and highway lighting with other energy and environmental considerations; iv) measurable KPIs that include long-term impact factors which are transferable throughout the project life cycle; and (v) the opportunity for integrating design documentation with sustainability whole-of-life targets.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Construction product innovation can exert a positive influence on project and industry performance. However, guidance is scarce on product innovation diffusion for road infrastructure, in contrast to the large body of literature on the manufacturing industry. A conceptual framework is proposed to understand these processes. Advice is given to managers based on the framework and a large quantitative survey. The framework focuses on contextual characteristics that influence the decision to adopt new-to-industry product innovation, as part of a diffusion process. Case study data are interpreted within the revised framework to test its value and disaggregate the broad obstacles to innovation. A large quantitative survey was then conducted to rank the relative importance of the obstacles constraining the adoption of innovative products on road construction projects. The three most important obstacles were found to be: (1) overemphasis on up-front project costs during tender stage; (2) disagreement over who carries the risk of new product failure; and (3) adversarial contract relations. The results suggest refinements to the conceptual framework to make it a more powerful tool for categorizing and analysing construction innovation obstacles. Results also suggest well-resourced repeat interactions within complementary procurement and regulatory systems will enhance the project teams’ ability to recognize and address innovation obstacles. Further, improved relationships are expected to decrease the need for an overly conservative approach to product approval and prescriptive specifications.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

It is reasonable to expect that Islamic project financing may be a suitable option of infrastructure financing in Indonesia. This research explored the conditions necessary for the implementation of Islamic project financing for Indonesian infrastructure development. It is important that all infrastructure project stakeholders understand the concept comprehensively. This study identified reforms through which the government could more directly support the implementation of Islamic project financing. This research has led to the realisation that Islamic project financing can be implemented in all sectors, in both public and private sector domains, and across Muslim and non-Muslim communities.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this research Agency Theory and Stewardship Theory are used to analyse the relative performance of different forms of privitisation of water infrastructure and in doing so enriches understanding of previously underdeveloped aspects of both theories. The prior Agency Theory literature had established assumptions about the behaviour of principals and agents in contracts and these were found not to be correct in the context of contracts between modern government and private organisations. Agency theory was extended to include steward-like behaviour of an agent and Stewardship Theory was developed by the identification of factors within the contractual relationship which promote the sense of responsibility to the principal. The alliance, joint venture and Build Own Operate Transfer (BOOT) forms of privatisation were found to achieve stewardship of the infrastructure.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The objective of this research is to develop a methodology that predicts the safety performance of various elements considered in the planning, design, and operation of nonlimited- access rural multilane highways.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In today's high-pressure work environment, project managers are often forced to “do more with less.” We argue that this imperative can lead project managers to engage in either high-performance or abusive supervision behaviors. To understand this process, we develop a model and associated propositions linking a project manager's cognitive appraisal of project-related demands to high-performance work practices versus abusive supervision behaviors—both of which impact three project outcomes: stakeholder relationships, people-related project success factors, and employee well-being. We propose that the choice between high-performance work practices and abusive supervision behaviors is moderated by a project manager's personal resources (psychological capital, emotional intelligence, and dark triad personality).

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper, a novel 2×2 multiple-input multiple-output orthogonal frequency division multiplexing (MIMO-OFDM) testbed based on an Analog Devices AD9361 highly integrated radio frequency (RF) agile transceiver was specifically implemented for the purpose of estimating and analyzing MIMO-OFDM channel capacity in vehicle-to-infrastructure (V2I) environments using the 920 MHz industrial, scientific, and medical (ISM) band. We implemented two-dimensional discrete cosine transform-based filtering to reduce the channel estimation errors and show its effectiveness on our measurement results. We have also analyzed the effects of channel estimation error on the MIMO channel capacity by simulation. Three different scenarios of subcarrier spacing were investigated which correspond to IEEE 802.11p, Long-Term Evolution (LTE), and Digital Video Broadcasting Terrestrial (DVB-T)(2k) standards. An extensive MIMO-OFDM V2I channel measurement campaign was performed in a suburban environment. Analysis of the measured MIMO channel capacity results as a function of the transmitter-to-receiver (TX-RX) separation distance up to 250 m shows that the variance of the MIMO channel capacity is larger for the near-range line-of-sight (LOS) scenarios than for the long-range non-LOS cases, using a fixed receiver signal-to-noise ratio (SNR) criterion. We observed that the largest capacity values were achieved at LOS propagation despite the common assumption of a degenerated MIMO channel in LOS. We consider that this is due to the large angular spacing between MIMO subchannels which occurs when the receiver vehicle rooftop antennas pass by the fixed transmitter antennas at close range, causing MIMO subchannels to be orthogonal. In addition, analysis on the effects of different subcarrier spacings on MIMO-OFDM channel capacity showed negligible differences in mean channel capacity for the subcarrier spacing range investigated. Measured channels described in this paper are available on request.