Australia is just one of many developed countries facing the challenge of delivering value for money in the provision of a substantial infrastructure pipeline amidst severe construction and private finance constraints. To help address this challenge, this chapter focuses on developing an understanding of the determinants of value at key procurement decision points that range from the make-or-buy decision, to buying in the context of market structures, including the exchange relationship and contractual arrangement decision. This understanding is based on theoretical pluralism and illustrated by research in the field of construction and maintenance, and in public-private partnerships.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The significant challenge faced by government in demonstrating value for money in the delivery of major infrastructure resolves around estimating costs and benefits of alternative modes of procurement. Faced with this challenge, one approach is to focus on a dominant performance outcome visible on the opening day of the asset, as the means to select the procurement approach. In this case, value for money becomes a largely nominal concept and determined by selected procurement mode delivering, or not delivering, the selected performance outcome, and notwithstanding possible under delivery on other desirable performance outcomes, as well as possibly incurring excessive transaction costs. This paper proposes a mind-set change in this particular practice, to an approach in which the analysis commences with the conditions pertaining to the project and proceeds to deploy transaction cost and production cost theory to indicate a procurement approach that can claim superior value for money relative to other competing procurement modes. This approach to delivering value for money in relative terms is developed in a first-order procurement decision making model outlined in this paper. The model developed could be complementary to the Public Sector Comparator (PSC) in terms of cross validation and the model more readily lends itself to public dissemination. As a possible alternative to the PSC, the model could save time and money in preparation of project details to lesser extent than that required in the reference project and may send a stronger signal to the market that may encourage more innovation and competition.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Project Procurement is a ‘great’ environment for ethical issues with its low-price state of mind and competition. It has many opportunities that could contribute to illegal activities or unethical behavior especially in the construction industry. In 2006 alone, 17.3% of 417 Malaysian government contract projects were considered sick due to the poor performance by the contractors. Therefore it is important to govern the project procurement, especially the plan procurement stage to ensure the accountability and transparency of the decision made in awarding the right contract to the best contractor. This is where project governance framework (PGF) is really needed in project procurement planning. Project governance is a subset of corporate governance focusing on the areas of corporate governance related to project activities, including: portfolio direction, project sponsorship, project and program management and efficiency and disclosure and reporting. This paper highlights the importance of implementing project governance framework (PGF) to ensure that the decision makers are answerable and accountable to the stakeholders, and the decision making is transparent to avoid any ethical issues arises. A comprehensive preliminary literature is carried out to discover the importance of executing PGF in project procurement in Malaysian public sector. By understanding the important of PGF, it is hoped that this will bring a signal to other developing countries to implement the similar method in ensuring the transparency of the decision making in project procurement planning in their countries.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There is a lack of research which identifies the role of the public-sector client in relation to ethical practice in plan procurement. This paper discusses a conceptual framework for ethical decision making in project procurement, focusing on public sector clients within the Malaysian construction industry. A framework is proposed to ensure that effective ethical decision making strategies are deployed to ensure that plan procurement is carried out with a transparent process so that the public sector clients are able to adopt. The conceptual framework adopts various factors that contribute to ethical decision making at the early stage of procurement and consists of the procurement system, individual factors, project characteristics, and organizational culture as the internal factors and professional code of conduct and government policies as the external factors. This framework rationalizes the relationships between systems, psychology and organizational theory to form an innovative understanding of making ethical decisions in plan procurement. It is expected that this proposed framework will be useful as a foundation for identifying the factors that contribute to ethical decision making focusing on the planning stage of procurement process.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Real‐time kinematic (RTK) GPS techniques have been extensively developed for applications including surveying, structural monitoring, and machine automation. Limitations of the existing RTK techniques that hinder their applications for geodynamics purposes are twofold: (1) the achievable RTK accuracy is on the level of a few centimeters and the uncertainty of vertical component is 1.5–2 times worse than those of horizontal components and (2) the RTK position uncertainty grows in proportional to the base‐torover distances. The key limiting factor behind the problems is the significant effect of residual tropospheric errors on the positioning solutions, especially on the highly correlated height component. This paper develops the geometry‐specified troposphere decorrelation strategy to achieve the subcentimeter kinematic positioning accuracy in all three components. The key is to set up a relative zenith tropospheric delay (RZTD) parameter to absorb the residual tropospheric effects and to solve the established model as an ill‐posed problem using the regularization method. In order to compute a reasonable regularization parameter to obtain an optimal regularized solution, the covariance matrix of positional parameters estimated without the RZTD parameter, which is characterized by observation geometry, is used to replace the quadratic matrix of their “true” values. As a result, the regularization parameter is adaptively computed with variation of observation geometry. The experiment results show that new method can efficiently alleviate the model’s ill condition and stabilize the solution from a single data epoch. Compared to the results from the conventional least squares method, the new method can improve the longrange RTK solution precision from several centimeters to the subcentimeter in all components. More significantly, the precision of the height component is even higher. Several geosciences applications that require subcentimeter real‐time solutions can largely benefit from the proposed approach, such as monitoring of earthquakes and large dams in real‐time, high‐precision GPS leveling and refinement of the vertical datum. In addition, the high‐resolution RZTD solutions can contribute to effective recovery of tropospheric slant path delays in order to establish a 4‐D troposphere tomography.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In asset intensive industries such as mining, oil & gas, utilities etc. most of the capital expenditure happens on acquiring engineering assets. Process of acquiring assets is called as “Procurement” or “Acquisition”. An asset procurement decision should be taken in consideration with the installation, commissioning, operational, maintenance and disposal needs of an asset or spare. However, such cross-functional collaboration and communication does not appear to happen between engineering, maintenance, warehousing and procurement functions in many asset intensive industries. Acquisition planning and execution are two distinct parts of asset acquisition process. Acquisition planning or procurement planning is responsible for determining exactly what is required to be purchased. It is important that an asset acquisition decision is the result of cross-functional decision making process. An acquisition decision leads to a formal purchase order. Most costly asset decisions occur even before they are acquired. Therefore, acquisition decision should be an outcome of an integrated planning & decision making process. Asset intensive organizations both, Government and non Government in Australia spent AUD 102.5 Billion on asset acquisition in year 2008-09. There is widespread evidence of many assets and spare not being used or utilized and in the end are written off. This clearly shows that many organizations end up buying assets or spares which were not required or non-conforming to the needs of user functions. It is due the fact that strategic and software driven procurement process do not consider all the requirements from various functions within the organization which contribute to the operation and maintenance of the asset over its life cycle. There is a lot of research done on how to implement an effective procurement process. There are numerous software solutions available for executing a procurement process. However, not much research is done on how to arrive at a cross functional procurement planning process. It is also important to link procurement planning process to procurement execution process. This research will discuss ““Acquisition Engineering Model” (AEM) framework, which aims at assisting acquisition decision making based on various criteria to satisfy cross-functional organizational requirements. Acquisition Engineering Model (AEM) will consider inputs from corporate asset management strategy, production management, maintenance management, warehousing, finance and HSE. Therefore, it is essential that the multi-criteria driven acquisition planning process is carried out and its output is fed to the asset acquisition (procurement execution) process. An effective procurement decision making framework to perform acquisition planning which considers various functional criteria will be discussed in this paper.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Against a background of already thin markets in some sectors of major public sector infrastructure in Australia and the desire of the Australian federal government to leverage private finance, concerns about ensuring sufficient levels of competition are prompting federal government to seek new sources of in-bound foreign direct income - as part of attracting more foreign contractors and consortia to bid for Australian public sector major infrastructure. As a first step towards attracting greater overseas interest in the Australian public sector market infrastructure market, an improved understanding of the determinants of multinational contractors’ willingness to bid in this market is offered by Dunning’s eclectic paradigm and which have has been a dominant approach in international business for over 20 years and yet has been little used in the context of international contracting. This paper aims to develop Dunning’s eclectic framework and also gives a brief outline of a research plan to collect secondary data and primary data from international contractors around the globe in pursuance of testing the eclectic framework.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A significant reduction in carbon emissions is a global mission and the construction industry has an indispensable role to play as a major carbon dioxide (CO2) generator. Over the years, various building environmental assessment (BEA) models and concepts have been developed to promote environmentally responsible design and construction. However, limited attention has been placed on assessing and benchmarking the carbon emitted throughout the lifecycle of building facilities. This situation could undermine the construction industry’s potential to reduce its dependence on raw materials, recognise the negative impacts of producing new materials, and intensify the recycle and reuse process. In this paper, current BEA approaches adopted by the construction industry are first introduced. The focus of these models and concepts is then examined. Following a brief review of lifecycle analysis, the boundary in which a lifecycle carbon emission analysis should be set for a construction project is identified. The paper concludes by highlighting the potential barriers of applying lifecycle carbon emissions analysis in the construction industry. It is proposed that lifecycle carbon emission analysis can be integrated with existing BEA models to provide a more comprehensive and accurate evaluation on the cradle-to-grave environmental performance of a construction facility. In doing so, this can assist owners and clients to identify the optimum solution to maximise emissions reduction opportunities.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper outlines our literature review background, investigation and practical application utilizing a precise optical survey level and total station technology for a specialist industrial measurement application. The practical part of the project was to measure and check specific critical features of the Industrial JIG assembly table used by the Queensland University of Technology (QUT) Motorsport group. The JIG is used in constructing a new Formula SAE race-car frame each year and is used throughout the racing season to check the production frame for twists, bends and potential stresses. The industrial JIG table required two survey approaches, firstly determination of the overall flatness throughout its’ steel base surface. Secondly was the validation of verticality of the steel uprights used to support and hold the race-car frame in place during construction and checking alignment for key suspension components. In addition the investigation brings realisations that there are far more accurate, efficient and economical technologies to be harnessed in industrial metrology.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Abstract: Goals and potential impacts of QUT corporate Blueprint3 framework, university has made significant investments in physical infrastructure, and investments to improve staff profiles, particularly in relation to science, technology, engineering, and mathematics (STEM) disciplines. The most significant physical change to the Faculty’s infrastructure has seen new workshop and teaching and research spaces located in Science and Technology precinct under construction. Also includes Alumni news, input and output numbers Spatial Science discussion, Work Integrated Learning (WIL) in 2011, some key teaching administrative dates in 2011.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Multiple awards for Spatial/Surveying lecturer, raising entry quality and commencing numbers at QUT, Gardens Point rapt in promise of things to come, STEM building progress.