148 resultados para Integrated management
Resumo:
Enterprise Systems (ES) can be understood as the de facto standard for holistic operational and managerial support within an organization. Most commonly ES are offered as commercial off-the-shelf packages, requiring customization in the user organization. This process is a complex and resource-intensive task, which often prevents small and midsize enterprises (SME) from undertaking configuration projects. Especially in the SME market independent software vendors provide pre-configured ES for a small customer base. The problem of ES configuration is shifted from the customer to the vendor, but remains critical. We argue that the yet unexplored link between process configuration and business document configuration must be closer examined as both types of configuration are closely tied to one another.
Resumo:
Enterprise Systems (ES) provide standardized, off-theshelf support for operations and management within organizations. With the advent of ES based on a serviceoriented architecture (SOA) and an increasing demand of IT-supported interorganizational collaboration, implementation projects face paradigmatically new challenges. The configuration of ES is costly and error-prone. Dependencies between business processes and business documents are hardly explicit and foster component proliferation instead of reuse. Configurative modeling can support the problem in two ways: First, conceptual modeling abstracts from technical details and provides more intuitive access and overview. Second, configuration allows the projection of variants from master models providing manageable variants with controlled flexibility. We aim at tackling the problem by proposing an integrated model-based framework for configuring both, processes and business documents, on an equal basis; as together, they constitute the core business components of an ES.
Resumo:
Supply chain management and customer relationship management are concepts for optimizing the provision of goods to customers. Information sharing and information estimation are key tools used to implement these two concepts. The reduction of delivery times and stock levels can be seen as the main managerial objectives of an integrative supply chain and customer relationship management. To achieve this objective, business processes need to be integrated along the entire supply chain including the end consumer. Information systems form the backbone of any business process integration. The relevant information system architectures are generally well-understood, but the conceptual specification of information systems for business process integration from a management perspective, remains an open methodological problem. To address this problem, we will show how customer relationship management and supply chain management information can be integrated at the conceptual level in order to provide supply chain managers with relevant information. We will further outline how the conceptual management perspective of business process integration can be supported by deriving specifications for enabling information system from business objectives.
Resumo:
The concept of market-driven rather than product-driven quality management has been given prominence through the report of a recent inquiry into the performance of the Hong Kong construction industry. The report submitted to the Government of Hong Kong in 2001 establishes a new vision of ‘an integrated industry that is capable of continuous improvement towards excellence in the market-driven environment’. Given the current economic downturn, major contractors are facing many challenges to realize this new quality oriented vision. This paper addresses the critical and timely issue of applying quality management to the project delivery process in Hong Kong. The paper attempts to capture and critically examine management perceptions of quality management aspects as applied to a local large-scale road construction project. Based on the analysis of questionnaire feedback and face-to-face interviews, the paper reveals key attributes of a successful application of quality management approaches, and identifies a mechanism for facilitating such implementation.
Resumo:
We are pleased to present the papers from the Australasian Health Informatics and Knowledge Management (HIKM) conference stream held on 20 January 2011 in Perth as a session of the Australasian Computer Science Week (ASCW) 2011. Formerly HIKM was named Health Data and Knowledge Management, however the inclusion of the health informatics term is timely given the current health reform. The submissions to HIKM 2011 demonstrated that Australasian researchers lead with many research and development innovations coming to fruition. Some of these innovations can be seen here, and we believe further recognition will accomplish by continuation to HIKM in the future. The HIKM conference is a review of health informatics related research, development and education opportunities. The conference papers were written to communicate with other researchers and share research findings, capturing each and every aspect of the health informatics field. They are namely: conceptual models and architectures, privacy and quality of health data, health workflow management patient journey analysis, health information retrieval, analysis and visualisation, data integration/linking, systems for integrated or coordinated care, electronic health records (EHRs) and personally controlled electronic health records (PCEHRs), health data ontologies, and standardisation in health data and clinical applications.
Resumo:
Web-based social networking applications have become increasingly important in recent years. The current applications in the healthcare sphere can support the health management, but to date there is no patient-controlled integrator. This paper proposes a platform called Multiple Profile Manager (MPM) that enables a user to create and manage an integrated profile that can be shared across numerous social network sites. Moreover, it is able to facilitate the collection of personal healthcare data, which makes a contribution to the development of public health informatics. Here we want to illustrate how patients and physicians can be benefited from enabling the platform for online social network sites. The MPM simplifies the management of patients' profiles and allows health professionals to obtain a more complete picture of the patients' background so that they can provide better health care. To do so, we demonstrate a prototype of the platform and describe its protocol specification, which is an XMPP (Extensible Messaging and Presence Protocol) [1] extension, for sharing and synchronising profile data (vCard²) between different social networks.
Resumo:
The decentralisation reform in Indonesia has mandated the Central Government to transfer some functions and responsibilities to local governments including the transfer of human resources, assets and budgets. Local governments became giant asset holders almost overnight and most were ill prepared to handle these transformations. Assets were transferred without analysing local government need, ability or capability to manage the assets and no local government was provided with an asset management framework. Therefore, the aim of this research is to develop a Public Asset Management Framework for provincial governments in Indonesia, especially for infrastructure and real property assets. This framework will enable provincial governments to develop integrated asset management procedures throughout asset‘s lifecycle. Achieving the research aim means answering the following three research questions; 1) How do provincial governments in Indonesia currently manage their public assets? 2) What factors influence the provincial governments in managing these public assets? 3) How is a Public Asset Management Framework developed that is specific for the Indonesian provincial governments‘ situation? This research applied case studies approach after a literature review; document retrieval, interviews and observations were collated. Data was collected in June 2009 (preliminary data collection) and January to July 2010 in the major eastern Indonesian provinces. Once the public asset management framework was developed, a focus group was used to verify the framework. Results are threefold and indicate that Indonesian provincial governments need to improve the effectiveness and efficiency of current practice of public asset management in order to improve public service quality. The second result shows that the 5 major concerns that influence the local government public asset management processes are asset identification and inventory systems, public asset holding, asset guidance and legal arrangements, asset management efficiency and effectiveness, and, human resources and their organisational arrangements. The framework was then applied to assets already transferred to local governments and so included a system of asset identification and a needs analysis to classify the importance of these assets to local governments, their functions and responsibilities in delivering public services. Assets that support local government functions and responsibilities will then be managed using suitable asset lifecycle processes. Those categorised as surplus assets should be disposed. Additionally functions and responsibilities that do not need an asset solution should be performed directly by local governments. These processes must be measured using performance measurement indicators. All these stages should be guided and regulated with sufficient laws and regulations. Constant improvements to the quality and quantity of human resources hold an important role in successful public asset management processes. This research focuses on developing countries, and contributes toward the knowledge of a Public Asset Management Framework at local government level, particularly Indonesia. The framework provides local governments a foundation to improve their effectiveness and efficiency in managing public assets, which could lead to improved public service quality. This framework will ensure that the best decisions are made throughout asset decision ownership and provide a better asset life cycle process, leading to selection of the most appropriate asset, improve its acquisition and delivery process, optimise asset performance, and provide an appropriate disposal program.
Resumo:
Climate change is expected to increase earth’s temperatures and consequently result in more frequent extreme weather events such as cyclones, storms, droughts and floods and rising global sea levels. This phenomenon will affect all assets. This paper discusses the impact of climate change and its consequences on public buildings. Public building management encompasses the building life cycle from planning, procurement, operation, repair and maintenance and building disposal. This paper recommends climate change adaptation strategies to be integrated into public building management. The roles and responsibilities of asset managers and users are discussed within the framework of planning and implementation of public building management and the integration of climate change adaptation strategies. A key point is that climate change can induce premature obsolescence of public buildings and services, which will increase the maintenance and refurbishment costs. This in turn will affect the life cycle cost of the building. Furthermore, a business continuity plan is essential for public building management in the context of disasters. The paper also highlights the significant role that the occupants of public buildings can play in the development and implementation of climate change adaptation strategies.
Resumo:
Australian governments face the twin challenges of dealing with extreme weather-related disasters (such as floods and bushfires) and adapting to the impacts of climate change. These challenges are connected, so any response would benefit from a more integrated approach across and between the different levels of government.This report summarises the findings of an NCCARF-funded project that addresses this problem. The project undertook a three-way comparative case study of the 2009 Victorian bushfires, the 2011 Perth Hills bushfires, and the 2011 Brisbane floods. It collected data from the official inquiry reports into each of these events, and conducted new interviews and workshops with key stakeholders. The findings of this project included recommendations that range from the conceptual to the practical. First, it was argued that a reconceptualization of terms such as ‘community’ and ‘resilience’ was necessary to allow for more tailored responses to varying circumstances. Second, it was suggested that the high level of uncertainty inherent in disaster risk management and climate change adaptation requires a more iterative approach to policymaking and planning. Third, some specific institutional reforms were proposed that included: 1) a new funding mechanism that would encourage collaboration between and across different levels of government, as well as promoting partnerships with business and the community; 2) improving community engagement through new resilience grants run by local councils; 3) embedding climate change researchers within disaster risk management agencies to promote institutional learning, and; 4) creating an inter-agency network that encourages collaboration between organisations.
Resumo:
Emergency management and climate change adaptation will increasingly challenge all levels of government because of three main factors. First, Australia is extremely vulnerable to the impacts of climate change, particularly through the increasing frequency, duration and/or intensity of disasters such as floods and bushfires. Second, the system of government that divides powers by function and level can often act as a barrier to a well-integrated response. Third, policymaking processes struggle to cope with such complex inter-jurisdictional issues. This paper discusses these factors and explores the nature of the challenge for Australian governments. Investigations into the 2009 Victorian bushfires, the 2011 Perth Hills bushfires, and the 2011 Brisbane floods offer an indication of the challenges ahead and it is argued that there is a need to: improve community engagement and communication; refocus attention on resilience; improve interagency communication and collaboration; and, develop institutional arrangements that support continual improvement and policy learning. These findings offer an opportunity for improving responses as well as a starting point for integrating disaster risk management and climate change adaptation policies. The paper is based on the preliminary findings of an NCCARF funded research project: The Right Tool for the Job: Achieving climate change adaptation outcomes through improved disaster management policies, planning and risk management strategies involving Griffith University and RMIT. It should be noted from the outset that the purpose of this research project is not to criticise the actions of emergency service workers and volunteers who do an incredible job under extreme circumstances, often risking their own lives in the process. The aim is simply to offer emergency management agencies the opportunity to step back and rethink their overall approach to the challenge they face in the light of the impacts of climate change.
Resumo:
Public policymakers are caught in a dilemma : there is a growing list of urgent issues to address, at the same time that public expenditure is being cut. Adding to this dilemma is a system of government designed in the 19th century and competing theories of policymaking dating back to the 1950s. The interlinked problems of disaster risk management and climate change adaptation are cases in point. As the climate changes, there will be more frequent, intense and/or prolonged disasters such as floods and bushfires. Clearly a well integrated whole of government response is needed, but how might this be achieved? Further, how could academic research contribute to resolving this dilemma in a way that would produce something of theoretical interest as well as practical outcomes for policymakers? These are the questions addressed by our research via a comparative analysis of the 2009 Victorian bushfires, the 2011 Perth Hills bushfires, and the 2011 Brisbane floods. Our findings suggest that there is a need to: improve community engagement and communication; refocus attention on resilience; improve interagency communication and collaboration; and, develop institutional arrangements that support continual improvement and policy learning. These findings have implications for all areas of public policy theory and practice.
Resumo:
Emergency management and climate change adaptation will increasingly challenge all levels of government because of three main factors. First, Australia is extremely vulnerable to the impacts of climate change, particularly through the increasing frequency and/or intensity of disasters such as floods and bushfires. Second, the system of government that divides powers by function and level can often act as a barrier to a well-integrated response. Third, policymaking processes struggle to cope with such complex inter-jurisdictional issues. This paper discusses these factors and explores the nature of the challenge for Australian governments. Investigations into the 2009 Victorian bushfires, the 2011 Perth Hills bushfires, and the 2011 Brisbane floods offer an indication of the challenges ahead and it is argued that there is a need to: improve community engagement and communication; refocus attention on resilience; improve interagency communication and collaboration; and, develop institutional arrangements that support continual improvement and policy learning. These findings offer an opportunity for improving responses as well as a starting point for integrating disaster risk management and climate change adaptation policies. The paper is based on the preliminary findings of an NCCARF funded research project: The Right Tool for the Job – Achieving climate change adaptation outcomes through improved disaster management policies, planning and risk management strategies involving Griffith University and RMIT.
Resumo:
Because of increased competition between healthcare providers, higher customer expectations, stringent checks on insurance payments and new government regulations, it has become vital for healthcare organisations to enhance the quality of the care they provide, to increase efficiency, and to improve the cost effectiveness of their services. Consequently, a number of quality management concepts and tools are employed in the healthcare domain to achieve the most efficient ways of using time, manpower, space and other resources. Emergency departments are designed to provide a high-quality medical service with immediate availability of resources to those in need of emergency care. The challenge of maintaining a smooth flow of patients in emergency departments is a global problem. This study attempts to improve the patient flow in emergency departments by considering Lean techniques and Six Sigma methodology in a comprehensive conceptual framework. The proposed research will develop a systematic approach through integration of Lean techniques with Six Sigma methodology to improve patient flow in emergency departments. The results reported in this paper are based on a standard questionnaire survey of 350 patients in the Emergency Department of Aseer Central Hospital in Saudi Arabia. The results of the study led us to determine the most significant variables affecting patient satisfaction with patient flow, including waiting time during patient treatment in the emergency department; effectiveness of the system when dealing with the patient’s complaints; and the layout of the emergency department. The proposed model will be developed within a performance evaluation metric based on these critical variables, to be evaluated in future work within fuzzy logic for continuous quality improvement.
Resumo:
Toxic blooms of Lyngbya majuscula occur in coastal areas worldwide and have major ecological, health and economic consequences. The exact causes and combinations of factors which lead to these blooms are not clearly understood. Lyngbya experts and stakeholders are a particularly diverse group, including ecologists, scientists, state and local government representatives, community organisations, catchment industry groups and local fishermen. An integrated Bayesian Network approach was developed to better understand and model this complex environmental problem, identify knowledge gaps, prioritise future research and evaluate management options.
Resumo:
One of the fastest growing industries – aviation – faces serious and compounding challenges in maintaining healthy relationships with community stakeholders. One area in aviation creating community conflict is noise pollution. However, current understandings of the factors that affect noise annoyance of the community are poorly conceptualized. More importantly, the way community needs and expectations could be incorporated in airport governance has been inadequately framed to address the issue of aircraft noise. This paper proposes the util-ity of adopting an integrated strategic asset management (ISAM) framework [1] to explore the dynamic nature of relationships between and airport and its surrounding area. The case of the Gold Coast Airport (OOL) operator and community stakeholders is used. This paper begins with an overview of the ISAM framework in the context of airport governance and sustainable development – as a way to find a balance between economic opportunities and societal concerns through stakeholder engagement. Next, an exploratory case study is adopted as a method to explore the noise-related complaints, complainants, and possible causes. Fol-lowing this, the paper reviews three approaches to community stakeholder engagement in Australia, Japan, and UK and discusses their implications in the con-text of OOL. The paper concludes with a contention that airport governance is likely to be much more effective with the adoption of ISAM framework than without it.