259 resultados para High Commitment Management
Resumo:
QUT Library and the High Performance Computing and Research Support (HPC) Team have been collaborating on developing and delivering a range of research support services, including those designed to assist researchers to manage their data. QUT’s Management of Research Data policy has been available since 2010 and is complemented by the Data Management Guidelines and Checklist. QUT has partnered with the Australian Research Data Service (ANDS) on a number of projects including Seeding the Commons, Metadata Hub (with Griffith University) and the Data Capture program. The HPC Team has also been developing the QUT Research Data Repository based on the Architecta Mediaflux system and have run several pilots with faculties. Library and HPC staff have been trained in the principles of research data management and are providing a range of research data management seminars and workshops for researchers and HDR students.
Resumo:
Leg ulcers affect 55000-90000 people, predominantly aged over 65, in the UK at any one time. Traditional care, delivered in people’s homes by district nurses or in GP clinics, is costly and often not effective, with slow healing rates and a high incidence of recurrence. A social model of leg ulcer clinics developed by the author has been shown to improve healing and reduce recurrence within a highly cost-effective framework that delivers genuine patient empowerment, public health education and social outreach. This paper outlines the rationale for the Leg Club, its clinical and social impact, and the infrastructure behind it. It also considers the challenges to establishing and running a Leg Club.
Resumo:
The OECD suggests that countries now have a choice. They can focus on development based on either: competition via investment in technology and innovation - which is important in high knowledge industries and high innovation economies, or competition via exchange rates and wages - which is important in industries producing standardised, lower-tech goods and services. The first route will maximise higher-skilled, higher-paid employment growth and living standards. Given the lack of control over the exchange rate, the second route requires competition based on wages. It is essential to understand that markets themselves won’t shift a country from one path to the other. These conclusions arise from the OECD’s recognition that technical progress - the creation of new products or the adoption of more efficient methods of production - is the main source of economic growth and enhanced quality of life. Technological change is, the OECD suggests, ...also the engine for job creation as higher wages and profits resulting from technology-induced productivity gains and lower prices lead to increased demand for new products from existing as well as new industries (1997: 4).Further, Competitiveness in high-technology industries is mainly driven by technology factors and much less by wage and exchange rate movements, while the reverse is true in low-technology industries (OECD 1996e: 12). The OECD has shown that sound macroeconomic conditions, such as the low inflation and reduced public sector debt visible in almost all member countries in the 1990s, are not enough to deal with high levels of unemployment and the need to increase levels of income: If economic performance is to improve, additional structural reform, which can increase innovation and the diffusion of technologies within and among national economies, seems necessary (OECD 1997: 4 Emphasis added).
Resumo:
This document is a summary of the findings of the inaugural study commissioned by the Australian Business Foundation Limited. It was conducted by Professor Jane Marceau, Pro-Vice Chancellor (Research) at the University of Western Sydney Macarthur, Dr Karen Manley, Visiting Research Fellow at the University of Western Sydney Macarthur and Mr Derek Sicklen, Managing Director of Australian Economic Analysis Pty Limited. The full report is available from the Australian Business Foundation. The Australian Business Foundation Limited is a recently formed independent economic and industry policy think-tank. It has been established and sponsored by Australian Business Limited, a pre-eminent and long-standing industry association and business services network. The report is in three parts. The first reviews the key findings of contemporary international economic and innovation-oriented analyses of the characteristics of high growth economies. The second assesses the shape, structure and dynamics of Australian industry as these compare with the characteristics for successful economic development suggested in the literature. Finally, the report indicates the nature of urgently required policy directions.
Resumo:
Road safety is a major concern worldwide. Road safety will improve as road conditions and their effects on crashes are continually investigated. This paper proposes to use the capability of data mining to include the greater set of road variables for all available crashes with skid resistance values across the Queensland state main road network in order to understand the relationships among crash, traffic and road variables. This paper presents a data mining based methodology for the road asset management data to find out the various road properties that contribute unduly to crashes. The models demonstrate high levels of accuracy in predicting crashes in roads when various road properties are included. This paper presents the findings of these models to show the relationships among skid resistance, crashes, crash characteristics and other road characteristics such as seal type, seal age, road type, texture depth, lane count, pavement width, rutting, speed limit, traffic rates intersections, traffic signage and road design and so on.
Resumo:
The low stream salinity naturally in the Nebine-Mungallala Catchment, extent of vegetation retention, relatively low rainfall and high evaporation indicates that there is a relatively low risk of rising shallow groundwater tables in the catchment. Scalding caused by wind and water erosion exposing highly saline sub-soils is a more important regional issue, such as in the Homeboin area. Local salinisation associated with evaporation of bore water from free flowing bore drains and bores is also an important land degradation issue particularly in the lower Nebine, Wallam and Mungallala Creeks. The replacement of free flowing artesian bores and bore drains with capped bores and piped water systems under the Great Artesian Basin bore rehabilitation program is addressing local salinisation and scalding in the vicinity of bore drains and preventing the discharge of saline bore water to streams. Three principles for the prevention and control of salinity in the Nebine Mungallala catchment have been identified in this review: • Avoid salinity through avoiding scalds – i.e. not exposing the near-surface salt in landscape through land degradation; • Riparian zone management: Scalding often occurs within 200m or so of watering lines. Natural drainage lines are most likely to be overstocked, and thus have potential for scalding. Scalding begins when vegetation is removed, and without that binding cover, wind and water erosion exposes the subsoil; and • Monitoring of exposed or grazed soil areas. Based on the findings of the study, we make the following recommendations: 1. Undertake a geotechnical study of existing maps and other data to help identify and target areas most at risk of rising water tables causing salinity. Selected monitoring should then be established using piezometers as an early warning system. 2. SW NRM should financially support scald reclamation activity through its various funding programs. However, for this to have any validity in the overall management of salinity risk, it is critical that such funding require the landholder to undertake a salinity hazard/risk assessment of his/her holding. 3. A staged approach to funding may be appropriate. In the first instance, it would be reasonable to commence funding some pilot scald reclamation work with a view to further developing and piloting the farm hazard/risk assessment tools, and exploring how subsequent grazing management strategies could be incorporated within other extension and management activities. Once the details of the necessary farm level activities have been more clearly defined, and following the outcomes of the geotechnical review recommended above, a more comprehensive funding package could be rolled out to priority areas. 4. We recommend that best-practice grazing management training currently on offer should be enhanced with information about salinity risk in scald-prone areas, and ways of minimising the likelihood of scald formation. 5. We recommend that course material be developed for local students in Years 6 and 7, and that arrangements be made with local schools to present this information. Given the constraints of existing syllabi, we envisage that negotiations may have to be undertaken with the Department of Education in order for this material to be permitted to be used. We have contact with key people who could help in this if required. 6. We recommend that SW NRM continue to support existing extension activities such as Grazing Land Management and the Monitoring Made Easy tools. These aids should be able to be easily expanding to incorporate techniques for monitoring, addressing and preventing salinity and scalding. At the time of writing staff of SW NRM were actively involved in this process. It is important that these activities are adequately resourced to facilitate the uptake by landholders of the perception that salinity is an issue that needs to be addressed as part of everyday management. 7. We recommend that SW NRM consider investing in the development and deployment of a scenario-modelling learning support tool as part of the awareness raising and education activities. Secondary salinity is a dynamic process that results from ongoing human activity which mobilises and/or exposes salt occurring naturally in the landscape. Time scales can be short to very long, and the benefits of management actions can similarly have immediate or very long time frames. One way to help explain the dynamics of these processes is through scenario modelling.
Resumo:
As organizations reach higher levels of Business Process Management maturity, they tend to accumulate large collections of process models. These repositories may contain thousands of activities and be managed by different stakeholders with varying skills and responsibilities. However, while being of great value, these repositories induce high management costs. Thus, it becomes essential to keep track of the various model versions as they may mutually overlap, supersede one another and evolve over time. We propose an innovative versioning model, and associated storage structure, specifically designed to maximize sharing across process models and process model versions, reduce conflicts in concurrent edits and automatically handle controlled change propagation. The focal point of this technique is to version single process model fragments, rather than entire process models. Indeed empirical evidence shows that real-life process model repositories have numerous duplicate fragments. Experiments on two industrial datasets confirm the usefulness of our technique.
Resumo:
The issue of ensuring that construction projects achieve high quality outcomes continues to be an important consideration for key project stakeholders. Although a lot of quality practices have been done within the industry, establishment and achievement of reasonable levels of quality in construction projects continues to be a problem. While some studies into the introduction and development of quality practices and stakeholder management in the construction industry have been undertaken separately, no major studies have so far been completed that examine in depth how quality management practices that specifically address stakeholders’ perspectives of quality can be utilised to contribute to the ultimate constructed quality of projects. This paper encompasses and summarizes a review of the literature related to previous research undertaken on quality within the industry, focuses on the benefits and shortcomings, together with examining the concept of integrating stakeholder perspectives of project quality for improvement of outcomes throughout the project lifecycle. Findings discussed in this paper reveal a pressing need for investigation, development and testing of a framework to facilitate better implementation of quality management practices and thus achievement of better quality outcomes within the construction industry. The framework will incorporate and integrate the views of stakeholders on what constitutes final project quality to be utilised in developing better quality management planning and systems aimed ultimately at achieving better project quality delivery.
Resumo:
The individual-opportunity nexus emphasizes that both the characteristics of individuals and venture ideas have roles in the entrepreneurial process (Shane & Venkataraman, 2000). Following upon this assertion the present study examined whether the venture idea novelty and investment of resources can make an important part in the venture creation process. Data analysed for a sample of nascent entrepreneurs in Australia suggests that the novelty of venture ideas restricts the performance of nascent ventures. However, the more investment of time and money do not show a significant impact to the venture performance.
Resumo:
Many studies carried out in relation to construction procurement methods reveal evidence of a need to change of culture and attitude in the construction industry. This culture change would transition from traditional adversarial relationships to cooperative and collaborative relationships. Relational contracting approaches, such as partnering and relationship management, are business strategies whereby client, commercial participants’ and stakeholders’ objectives are aligned for mutual benefit. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a slow implementation of relational contracting down the value chain. This paper reports the findings of an empirical study which examined the practices and prerequisites for relationship management implementation success and for supply chain engagement to develop. Questionnaire survey, interviews and case studies were conducted with Australian contracting organisations in this study. The study reveals that the adaption of relational contracting approach in the supply chain is found to be limited and contractors still prefer to keep suppliers and subcontractors at arm’s length. Findings also show that the degree of match and mismatch between organizational structuring and organizational process is found to have an impact on staff’s commitment level and performance effectiveness.
Resumo:
Background/aim In response to the high burden of disease associated with chronic heart failure (CHF), in particular the high rates of hospital admissions, dedicated CHF management programs (CHF-MP) have been developed. Over the past five years there has been a rapid growth of CHF-MPs in Australia. Given the apparent mismatch between the demand for, and availability of CHF-MPs, this paper has been designed to discuss the accessibility to and quality of current CHF-MPs in Australia. Methods The data presented in this report has been combined from the research of the co-authors, in particular a review of the inequities in access to chronic heart failure which utilised geographical information systems (GIS) and the survey of heterogeneity in quality and service provision in Australian. Results Of the 62 CHF-MPs surveyed in this study 93% (58) centres had been located areas that are rated as Highly Accessible. This result indicated that most of the CHF-MPs have been located in capital cities or large regional cities. Six percent (4 CHF-MPs) had been located in Accessible areas which were country towns or cities. No CHF-MPs had been established outside of cities to service the estimated 72,000 individuals with CHF living in rural and remote areas. 16% of programs recruited NYHA Class I patients and of these 20% lacked confirmation (echocardiogram) of their diagnosis. Conclusion Overall, these data highlight the urgent need to provide equitable access to CHF-MP's. When establishing CHF-MPs consideration of current evidence based models to ensure quality in practice.
Resumo:
The literature abounds with descriptions of failures in high-profile projects and a range of initiatives has been generated to enhance project management practice (e.g., Morris, 2006). Estimating from our own research, there are scores of other project failures that are unrecorded. Many of these failures can be explained using existing project management theory; poor risk management, inaccurate estimating, cultures of optimism dominating decision making, stakeholder mismanagement, inadequate timeframes, and so on. Nevertheless, in spite of extensive discussion and analysis of failures and attention to the presumed causes of failure, projects continue to fail in unexpected ways. In the 1990s, three U.S. state departments of motor vehicles (DMV) cancelled major projects due to time and cost overruns and inability to meet project goals (IT-Cortex, 2010). The California DMV failed to revitalize their drivers’ license and registration application process after spending $45 million. The Oregon DMV cancelled their five year, $50 million project to automate their manual, paper-based operation after three years when the estimates grew to $123 million; its duration stretched to eight years or more and the prototype was a complete failure. In 1997, the Washington state DMV cancelled their license application mitigation project because it would have been too big and obsolete by the time it was estimated to be finished. There are countless similar examples of projects that have been abandoned or that have not delivered the requirements.
Resumo:
Aim: This paper reports a study designed to assess the psychometric properties (validity and reliability) of a Turkish version of the Australian Parents’ Fever Management Scale (PFMS). Background: Little is known about childhood fever management among Turkish parents. No scales to measure parents’ fever management practices in Turkey are available. Design: This is a methodological study. Methods: Eighty parents, of febrile children aged six months to five years, were randomly selected from the paedaitric hospital and two community family health centers in Sakarya, Turkey. The PFMS was back translated; language equivalence and content validity were validated. PFMS and socio-demographic data were collected in 2009. Means and standard deviations were calculated for interval level data and p values greater than 0.05 were considered statistically significant. Unrotated principal component analysis was used to determine construct validity and Cronbach’s coefficient alpha determined the internal consistency reliability. Results: The PFMS was psychometrically sound in this population. Construct validity, confirmed by confirmatory factor analysis [KMO 0.812, Bartlett’s Specificity (χ² = 182.799, df=28, P < 0·001)] revealed the Turkish version to be comprised of the eight original PFMS items. Internal consistency reliability coefficient was 0.80 and the scale’s total-item correlation coefficients ranged from 0.15 to 0.66 and were significant (p<0.001). Interestingly parents reported high scores on the PFMS 34.52±4.60 (range 8-40 with 40 indicating a high burden of care for febrile children). Conclusion: The PFMS was as psychometrically robust in a Turkish population as in an Australian population and is, therefore, a useful tool for health professionals to identify parents’ practices, provide targeted education thereby in reducing the unnecessary burden of care they place on themselves when caring for a febrile child. Relevance to clinical practice. Testing in different populations, cultures and healthcare systems will further assist in reporting the PFMS usefulness in clinical practice and research.
Resumo:
Safety culture in the construction industry is a growing research area. The unique nature of construction industry works – being project-based, varying in size and focus, and relying on a highly transient subcontractor workforce – means that safety culture initiatives cannot be easily translated from other industries. This paper reports on the first study in a three year collaborative industry and university research project focusing on safety culture practices and development in one of Australia’s largest global construction organisations. The first round of a modified Delphi method is reported, and describes the insights gained from 41 safety leaders’ perceptions and understandings of safety culture within the organisation. In-depth, semi-structured interviews were conducted, and will be followed by a quantitative perception survey with the same sample. Participants included Senior Executives, Corporate Managers, Project Managers, Safety Managers and Site Supervisors. Leaders’ definitions and descriptions of safety culture were primarily action-oriented and some confusion was evident due to the sometimes implicit nature of culture in organisations. Leadership was identified as a key factor for positive safety culture in the organisation, and there was an emphasis on leaders demonstrating commitment to safety, and being visible to the project-based workforce. Barriers to safety culture improvement were also identified, with managers raising diverse issues such as the transient subcontractor workforce and the challenge of maintaining safety as a priority in the absence of safety incidents, under high production pressures. This research is unique in that it derived safety culture descriptions from key stakeholders within the organisation, as opposed to imposing traditional conceptualisations of safety culture that are not customised for the organisation or the construction industry more broadly. This study forms the foundation for integrating safety culture theory and practice in the construction industry, and will be extended upon in future studies within the research program.