282 resultados para Contract and incentives


Relevância:

30.00% 30.00%

Publicador:

Resumo:

an initial public offering, the choices made by issuers, such as the offer price, might not appear to be wealth maximizing. In this article, we argue that the choices are strategic. Based on the model developed by Barry (1989), we show that the average change in the issuer's wealth (4.52 per cent) is lower than the average loss implied by underpricing (12.09 per cent). Our results support the notion that the choices issuers make at the offering generate a compensatory benefit in the aftermarket. That the issuer may well not suffer a net wealth loss from the offering is in accordance with continued initial public offering activity.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Section 35 of the Insurance Contracts Act 1984 requires insurers offering insurance policies in six prescribed areas "to clearly inform" prospective insureds of any departure their policies may constitute from the standard covers established by the Act and its accompanying Regulations. This prescribed insurance contracts regime was designed to remedy comprehension problems generated by the length and complexity of insurance documents and to alleviate misunderstanding over the terms and conditions of individual policies. This article examines the rationale underpinning s 35 and the prescribed insurance contracts regime and looks at the operation of the legislation with particular reference to home contents insurance in Australia. It is argued that the means whereby disclosure of derogation from standard cover may be effected largely negates the thrust of the prescribed insurance contract reform. Recommendations to address these operational deficiencies are made.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This book provides an in-depth examination of the theoretical,legal, social and economic foundations to disclosure and concealment of information in relation to the formation of consumer insurance contracts. A comparative treatment of this issue is undertaken with particular attention given to the judicial and legislative approaches adopted in the United Kingdom, the United States of America, Australia and New Zealand.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Aligning the motivation of contractors and consultants to perform better than ‘business-as-usual’ (BAU) on a construction project is a complex undertaking and the costs of failure are high as misalignment can compromise project outcomes. Despite the potential benefits of effective alignment, there is still little information about optimally designing procurement approaches that promote motivation towards ‘above BAU’ goals. The paper contributes to this knowledge gap by examining the negative drivers of motivation in a major construction project that, despite a wide range of performance enhancing incentives, failed to exceed BAU performance. The paper provides a case study of an iconic infrastructure project undertaken in Australia between 2002 and 2004. It is shown that incentives provided to contractors and consultants to achieve above BAU performance can be compromised by a range of negative motivation drivers including: • inequitable contractual risk allocation; • late involvement of key stakeholders; • inconsistency between contract intentions and relationship intentions; • inadequate price negotiation; • inconsistency between the project performance goals and incentive goals; •unfair and inflexible incentive performance measurement processes. Future quantitative research is planned to determine the generalisability of these results.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Client-side project managers face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation under a successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest that motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisations throughout a project to continuously encourage motivation under changing project conditions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Reviews the background to China's enactment of the Anti-Monopoly Law in 2007 and compares the debate surrounding the proposed introduction of similar legislation in Hong Kong. Examines the main issues arising during the Law's 13 year drafting stage, its key provisions and the remaining areas of uncertainty concerning its enforcement. Discusses ongoing efforts to introduce competition law regulations in Hong Kong, the main features of the draft General Competition Law and the shortcomings of its approach to penalties and exemptions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Telecommunications is a key component in any country's economic infrastructure, requiring a vast amount of capital injection and ongoing technical support and innovation. Many developing countries experience handicaps in accessing capital and sustaining the required technical capability in their industralisation process. Therefore, attracting both capital investments and expertise by attuning the developing country's economic policies and legal environment to meet investors' expectations is a priority. Privatisation has been seen as a triumph by international institutions such as the World Bank, and a major requirement for developing economies to industrialise. However from a regulatory perspective, this process is far from straightforward. Implementing economic policies requires a number of regulations and regulatory instruments to be in place. Apart from the need for an independent regulator, regulatory outcomes are often dependent on the willingness of various stakeholders to comply with the course of actions undertaken by authorities. This article examines the factors steering the processes and changes in the telecommunication reforms of Indonesia and China.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study aims to stimulate thought, debate and action for change on this question of more vigorous philanthropic funding of Australian health and medical research (HMR). It sharpens the argument with some facts and ideas about HMR funding from overseas sources. It also reports informed opinions from those working, giving and innovating in this area. It pinpoints the range of attitudes to HMR giving, both positive and negative. The study includes some aspects of Government funding as part of the equation, viewing Government as major HMR givers, with particular ability to partner, leverage and create incentives. Stimulating new philanthropy takes active outreach. The opportunity to build more dialogue between the HMR industry and the wider community is timely given the ‘licence to practice’ issues and questioned trust that applies currently somewhat both to science and to the charitable sector. This interest in improving HMR philanthropy also coincides with the launch last year by the Federal Government of Nonprofit Australia Limited (NAL), a group currently assessing infrastructure improvements to the charitable sector. History suggests no one will create this change if Research Australia does not. However, interest in change exists in various quarters. For Research Australia to successfully change the culture of Australian HMR giving, the process will drive the outcomes. Obviously stakeholder buy-in and partners will be needed and the ultimate blueprint for greater philanthropic HMR funding here will not be this document. Instead it will be the one that wears the handprint and ‘mindprint’ of the many architects and implementers interested in promoting HMR philanthropy, from philanthropists to nonprofit peaks to government policy arms. As the African proverb says, ‘If you want to go fast, go alone; but if you want to go far, go with others’.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Botnets are large networks of compromised machines under the control of a bot master. These botnets constantly evolve their defences to allow the continuation of their malicious activities. The constant development of new botnet mitigation strategies and their subsequent defensive countermeasures has lead to a technological arms race, one which the bot masters have significant incentives to win. This dissertation analyzes the current and future states of the botnet arms race by introducing a taxonomy of botnet defences and a simulation framework for evaluating botnet techniques. The taxonomy covers current botnet techniques and highlights possible future techniques for further analysis under the simulation framework. This framework allows the evaluation of the effect techniques such as reputation systems and proof of work schemes have on the resources required to disable a peer-to-peer botnet. Given the increase in the resources required, our results suggest that the prospects of eliminating the botnet threat are limited.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The experimental literature and studies using survey data have established that people care a great deal about their relative economic position and not solely, as standard economic theory assumes, about their absolute economic position. Individuals are concerned about social comparisons. However, behavioral evidence in the field is rare. This paper provides an empirical analysis, testing the model of inequality aversion using two unique panel data sets for basketball and soccer players. We find support that the concept of inequality aversion helps to understand how the relative income situation affects performance in a real competitive environment with real tasks and real incentives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

China has been the focus of much academic and business scrutiny of late. Its economic climate is changing and its huge new market opportunities seem quite tantalizing to the would-be 'technology entrepreneur'. But China's market is a relatively immature one; it is still in the process of being opened up to real competition. The corollary of this is that, at this stage of the transitional process, there is still significant State control of market function. This article discusses Chinese competition law, the technology transfer system, how the laws are being reformed and how the technology entrepreneur fares under them. The bottom line is that while opportunities beckon, the wise entrepreneur will nevertheless continue to exercise caution.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In an age where financial transactions are conducted worldwide and mobility of citizens throughout the world is common, lawyers seeking to serve Bankruptcy Notices and Creditor’s Petitions encounter many problems. To assist lawyers in overcoming some of the service problems that are arising as a result of this changing world, a number of recent cases are considered that highlight a number of issues, including American Express Australia Limited v Michaels [2010] FMCA 103, Deputy Commissioner of Taxation v Barnes (2008) 70 ATR 776; [2008] FMCA 7, Battenberg v Restom & Ors (2005) 223 ALR 692; upheld by the Full Federal Court in Battenberg v Restrom and Ors (2006) 149 FCR 128 at 133; [2006] FCAFC 20 and Envee Energy Pty Ltd (In Liquidation) v Stockford [2007] FMCA 1426. While the fact situation of every bankruptcy case will differ, recent decisions may assist lawyers in dealing effectively with bankruptcy matters in these times of transition. Lawyers can facilitate completion of the litigious process within the relevant legislative framework in order to satisfy their responsibility to clients and to the Court by considering this case law.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents the results of a structural equation model (SEM) for describing and quantifying the fundamental factors that affect contract disputes between owners and contractors in the construction industry. Through this example, the potential impact of SEM analysis in construction engineering and management research is illustrated. The purpose of the specific model developed in this research is to explain how and why contract related construction problems occur. This study builds upon earlier work, which developed a disputes potential index, and the likelihood of construction disputes was modeled using logistic regression. In this earlier study, questionnaires were completed on 159 construction projects, which measured both qualitative and quantitative aspects of contract disputes, management ability, financial planning, risk allocation, and project scope definition for both owners and contractors. The SEM approach offers several advantages over the previously employed logistic regression methodology. The final set of structural equations provides insight into the interaction of the variables that was not apparent in the original logistic regression modeling methodology.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.