343 resultados para Construction equipment industry


Relevância:

40.00% 40.00%

Publicador:

Resumo:

If there is a silver lining to the adversarial, dispute-prone nature of the building and construction industry, it can be found in the concomitant rise of innovative dispute resolution mechanisms. Time, cost and relationship concerns have meant that the formal adversarial system holds little appeal for disputing parties. As these alternative forms of dispute avoidance/resolution have matured in Australia over the last 20 years, attention has turned to the key characteristics of each process and their suitability to the building and construction industry. This article considers the role of dispute review boards (DRBs) and mediation as two alternative methods for avoiding/resolving disputes in the construction industry. Criteria are established for evaluating the efficacy of these procedures and their sensitivity to the needs of construction industry disputants. The ultimate conclusion reached is that DRBs represent a powerful, yet underutilised dispute resolution tool in Australia, and possess many industry-specific advantages that more traditional forms of alternative dispute resolution (particularly mediation) do not provide.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Building Information Modelling (BIM) has been regarded as a one stop shop capable of addressing the ills of the construction industry. Yet, while some firms have accepted BIM as a new way to work and gone on to record success, others (which have not so done) have raised such questions as: ‘How is BIM defined? Is it a tool or a process? Which kinds and sizes of organisations stand to benefit from BIM?’ These questions form the basis of this research. Hence, having explored the relevant body of literature, this research investigates three organisations within the UK – described as the earliest adopters of BIM – and considers how they have fared in terms of project performance in the years since adopting BIM; focusing on project cost, delivery time and quality achievement. This investigation also probed two of the leading voices in BIM in the UK in search of the much needed answers. The findings of the research show that successful projects executed in the organisations that have used BIM is predicated on its adoption as a process, rather than as a tool of technology; a process that changes the way work in the construction industry is typically done. Moreover, the successes recorded in the firms researched give credence to project success consequent upon adopting BIM. Nevertheless, the findings of this research show that the cornerstone of this success is leadership-driven innovation.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This study analyzed the relationship between the CO2 emissions of different industries and economic growth in OECD countries from 1970 to 2005. We tested an environmental Kuznets curve (EKC) hypothesis and found that total CO2 emissions from nine industries show an N-shaped trend instead of an inverted U or monotonic increasing trend with increasing income. The EKC hypothesis for sector-level CO2 emissions was supported in the (1) paper, pulp, and printing industry; (2) wood and wood products industry; and (3) construction industry. We also found that emissions from coal and oil increase with economic growth in the steel and construction industries. In addition, the non-metallic minerals, machinery, and transport equipment industries tend to have increased emissions from oil and electricity with economic growth. Finally, the EKC turning point and the relationship between GDP per capita and sectoral CO2 emissions differ among industries according to the fuel type used. Therefore, environmental policies for CO2 reduction must consider these differences in industrial characteristics. © 2013 Elsevier Ltd.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The construction workforce in Hong Kong is experiencing a severe ageing problem and labour shortage. One initiative to enhance the supply of manpower is to assist ethnic minorities joining the industry. It is foreseeable that the percentage of ethnic minorities in the construction workforce will keep increasing. Statistics show that ethnic minorities were nearly 30% more likely to have work-related injuries than local workers in some developed countries. However, official statistics on the safety of ethnic minorities are not available in Hong Kong. A search in newspaper archive revealed that ethnic minorities in the construction industry of Hong Kong are subjected to higher fatality rate than local workers, just as is the case in many developed countries. This reflects that the safety of ethnic minorities has not received the attention it rightly deserves. Safety communication has been one of the key factors leading to accidents. Safety communication barriers of ethnic minorities impede them from receiving safety training and acquiring safety information effectively. Research towards improving the safety communication of ethnic minorities in the construction industry of Hong Kong becomes more urgent. This paper will provides an initial report on a research project which focuses on improving the safety communication of ethnic minorities in the construction industry of Hong Kong. Quantitative and qualitative research methods including Social Network Analysis (SNA) applied in conducting the research are first discussed. Preliminary statistics of construction accidents related to ethnic minorities in Hong Kong are then presented.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Hong Kong construction industry is currently facing ageing problem and labour shortage. There are opportunities for employing ethnic minority construction workers to join this hazardous industry. These ethnic minority workers are prone to accidents due to communication barriers. Safety communication is playing an important role for avoiding the accidents on construction sites. However, the ethnic minority workers are not very fluent in the local language and facing safety communication problems while working with local workers. Social network analysis (SNA), being an effective tool to identify the safety communication flow on the construction site, is used to attain the measures of safety communication like centrality, density and betweenness within the ethnic minorities and local workers, and to generate sociograms that visually represent communication pattern within the effective and ineffective safety networks. The aim of this paper is to present the application of SNA for improving the safety communication of ethnic minorities in the construction industry of Hong Kong. The paper provides the theoretical background of SNA approaches for the data collection and analysis using the software UCINET and NetDraw, to determine the predominant safety communication network structure and pattern of ethnic minorities on site.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Background Value for money (VfM) on collaborative construction projects is dependent on the learning capabilities of the organisations and people involved. Within the context of infrastructure delivery, there is little research about the impact of organisational learning capability on project value. The literature contains a multiplicity of often un-testable definitions about organisational learning abilities. This paper defines learning capability as a dynamic capability that participant organisations purposely develop to add value to collaborative projects. The paper reports on a literature review that proposes a framework that conceptualises learning capability to explore the topic. This work is the first phase of a large-scale national survey funded by the Alliancing Association of Australasia and the Australian Research Council. Methodology Desk-top review of leading journals in the areas of strategic management, strategic alliances and construction management, as well as recent government documents and industry guidelines, was undertaken to synthesise, conceptualise and operationalise the concept of learning capability. The study primarily draws on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991; Wernerfelt 1984), absorptive capacity (e.g. Cohen and Levinthal 1990; Zahra and George 2002); and dynamic capabilities (e.g. Helfat et al. 2007; Teece et al. 1997; Winter 2003). Content analysis of the literature was undertaken to identify key learning routines. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Findings and Future Research The review process resulted in a framework for the conceptualisation of learning capability that shows three phases of learning: (1) exploratory learning, (2) transformative learning and (3) exploitative learning. These phases combine both internal and external learning routines to influence project performance outcomes and thus VfM delivered under collaborative contracts. Sitting within these phases are eight categories of learning capability comprising knowledge articulation, identification, acquisition, dissemination, codification, internationalisation, transformation and application. The learning routines sitting within each category will be disaggregated in future research as the basis for measureable items in a large-scale survey study. The survey will examine the extent to which various learning routines influence project outcomes, as well as the relationships between them. This will involve identifying the routines that exist within organisations in the construction industry, their resourcing and rate of renewal, together with the extent of use and perceived value within the organisation. The target population is currently estimated to be around 1,000 professionals with experience in relational contracting in Australia. This future research will build on the learning capability framework to provide data that will assist construction organisations seeking to maximise VfM on construction projects.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

3D printing (3Dp) has long been used in the manufacturing sector as a way to automate, accelerate production and reduce waste materials. It is able to build a wide variety of objects if the necessary specifications are provided to the printer and no problems are presented by the limited range of materials available. With 3Dp becoming cheaper, more reliable and, as a result, more prevalent in the world at large, it may soon make inroads into the construction industry. Little is known however, of 3Dp in current use the construction industry and its potential for the future and this paper seeks to rectify this situation by providing a review of the relevant literature. In doing this, the three main 3Dp methods of contour crafting, concrete printing and D-shape 3Dp are described which, as opposed to the traditional construction method of cutting materials down to size, deliver only what is needed for completion, vastly reducing waste. Also identified is 3Dp’s potential to enable buildings to be constructed many times faster and with significantly reduced labour costs. In addition, it is clear that construction 3Dp can allow the further inclusion of Building Information Modelling into the construction process - streamlining and improving the scheduling requirements of a project. However, current 3Dp processes are known to be costly, unsuited to large-scale products and conventional design approaches, and have a very limited range of materials that can be used. Moreover, the only successful examples of construction in action to date have occurred in controlled laboratory environments and, as real world trials have yet to be completed, it is yet to be seen whether it can be it equally proficient in practical situations. Key Words: 3D Printing; Contour Crafting; Concrete Printing; D-shape; Building Automation.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The ability to estimate the expected Remaining Useful Life (RUL) is critical to reduce maintenance costs, operational downtime and safety hazards. In most industries, reliability analysis is based on the Reliability Centred Maintenance (RCM) and lifetime distribution models. In these models, the lifetime of an asset is estimated using failure time data; however, statistically sufficient failure time data are often difficult to attain in practice due to the fixed time-based replacement and the small population of identical assets. When condition indicator data are available in addition to failure time data, one of the alternate approaches to the traditional reliability models is the Condition-Based Maintenance (CBM). The covariate-based hazard modelling is one of CBM approaches. There are a number of covariate-based hazard models; however, little study has been conducted to evaluate the performance of these models in asset life prediction using various condition indicators and data availability. This paper reviews two covariate-based hazard models, Proportional Hazard Model (PHM) and Proportional Covariate Model (PCM). To assess these models’ performance, the expected RUL is compared to the actual RUL. Outcomes demonstrate that both models achieve convincingly good results in RUL prediction; however, PCM has smaller absolute prediction error. In addition, PHM shows over-smoothing tendency compared to PCM in sudden changes of condition data. Moreover, the case studies show PCM is not being biased in the case of small sample size.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose Traditional construction planning relies upon the critical path method (CPM) and bar charts. Both of these methods suffer from visualization and timing issues that could be addressed by 4D technology specifically geared to meet the needs of the construction industry. This paper proposed a new construction planning approach based on simulation by using a game engine. Design/methodology/approach A 4D automatic simulation tool was developed and a case study was carried out. The proposed tool was used to simulate and optimize the plans for the installation of a temporary platform for piling in a civil construction project in Hong Kong. The tool simulated the result of the construction process with three variables: 1) equipment, 2) site layout and 3) schedule. Through this, the construction team was able to repeatedly simulate a range of options. Findings The results indicate that the proposed approach can provide a user-friendly 4D simulation platform for the construction industry. The simulation can also identify the solution being sought by the construction team. The paper also identifies directions for further development of the 4D technology as an aid in construction planning and decision-making. Research limitations/implications The tests on the tool are limited to a single case study and further research is needed to test the use of game engines for construction planning in different construction projects to verify its effectiveness. Future research could also explore the use of alternative game engines and compare their performance and results. Originality/value The authors proposed the use of game engine to simulate the construction process based on resources, working space and construction schedule. The developed tool can be used by end-users without simulation experience.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Construction industry contributes significantly to environmental degradation, and governments in many countries which are endeavouring to address the situation. Malaysia is no exception. This paper examines the path towards green construction project delivery in Malaysia, focusing on current green policies and initiatives by governments. The historical waves in Malaysian approaches to tackling environmental issues are described, starting from the early 20th century, through the 1990s to the present, and the influence of these approaches on construction practices is analysed. Based on the findings of policy review, essential green construction practices aimed at mitigating the adverse effects of construction activities on the environment in Malaysia were identified. This paper paves the way for future studies in construction and sustainability in Malaysia, especially for the Southeast Asian region where sustainability practices are urgently needed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Construction projects have a negative impact on the environment. As Malaysia is planning more construction projects to cater for its current and future development needs, practitioners are urged to undertake greener approaches to construction. One of the efforts is the introduction of green procurement, which is promoted under the Malaysian Government’s MyHijau initiative. Construction procurement is recognised as a tool to shift the construction business into a greener industry. However, the implementation of green procurement in Malaysia is still in its infancy and faces a number of challenges, such as the lack of knowledge. A significant gap has been found between policy formulation and actual project delivery as there are no practical guidelines for stakeholders to procure environmental-friendly construction projects. To address this problem, the present research (as part of an ongoing PhD project) aims to develop a green procurement framework that guides stakeholders in procuring green projects in Malaysia. This article highlights the concept of green procurement in Malaysia, the work carried out to date to achieve the research objectives and the preliminary framework that has been established. It is hoped that this research will help academics and practitioners to further explore the potential of green procurement to improve sustainability in the current construction industry practices.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Older adults report a desire to remain within the preferred environment for as long as possible. This desire is referred to as aging-in-place. Aging-in-place integrates housing and care options. Factors affecting the ability to remain within the preferred environment include current home designs, access to housing choices, social support networks, and community services, to name a few. Research supports physical and psychosocial benefits of aging-in-place for the individual. Home modifications have the potential to influence the quality of life in a number of positive directions that range from personal mobility to community engagement. Modifications range from minor to significant. Financial resources, contractor interest and expertise, consumer awareness and consumer opportunity affect the degree of change. Increasingly, construction professionals express an interest in learning more about aging-in place. Queries ranged from obtaining a greater understanding of the meaning of the concept, impact of demographic change on housing stock, and increased awareness of universal design features. This paper presents findings from a survey administered to current members of the Canadian Home Builders’ Association – Calgary Regional Office. Within this presentation, we report findings on members understanding of demographic change and the effect of this change on the current and future housing stock. We discuss perceived barriers and benefits of the development of business models to support aging-in-place. Finally, we conclude with discussion of educational support to enhance the understanding of aging-in-place.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose: Knowledge management (KM) is important to the knowledge-intensive construction industry. The diversified and changing nature of works in this field warrants us to stocktake, identify changes and map out KM research framework for future exploration. Design/methodology/approach: The study involves three aspects. First, three stages of KM research in construction were distinguished in terms of the time distribution of 217 target publications. Major topics in the stages were extracted for understanding the changes of research emphasis from evolutionary perspective. Second, the past works were summed up in a three-dimensional research framework in terms of management organization, managerial methodology and approach, and managerial objective. Finally, potential research orientations in the future were predicted to expand the existing research framework. Findings: It was found that (1) KM research has significantly blossomed in the last two decades with a great potential; (2) major topics of KM were changing in terms of technology, technique, organization, attribute of knowledge and research objectives; (3) past KM studies centred around management organization, managerial methodology and approach, and managerial objective thus a three-dimensional research framework was proposed; (4) within the research framework, team-level, project-level and firm-level KM were studied to achieve project, organizational and competitive objectives by integrated methodologies of information technology, social technique and KM process tool; and (5) nine potential research orientations were predicted corresponding to the three dimensions. Finally, an expanded research framework was proposed to encourage and guide future research works in this field. Research limitations/implications: The paper only focused on the construction industry. The findings need further exploration in order to discover any possible missing important research works which were not published in English or not included in the time period. Originality/value: The paper formed a systematic framework of KM research in construction and predicted the potential research orientations. It provides much value for the researchers who want to understand the past and the future of global KM research in the construction industry.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

- Purpose The purpose of this paper is to investigate the current skills gap in both generic and skill areas within the construction industry in Queensland, Australia. - Design/methodology/approach An internet-based survey was administered to collect the opinions of construction employees about the workplace-training environment and their perceptions towards training. The survey intended to address the following research questions, specifically in relation to the construction industry. - Findings The survey results reveal that whilst overall participation in workplace training is high, the current workplace training environments do not foster balanced skill development. The study reveals that in the current absence of a formal and well-balanced training mechanism, construction workers generally resort to their own informal self-development initiatives to develop the needed role-specific theoretical knowledge. - Research limitations/implications The findings of the research are based on the data primarily collected in the construction industry in Queensland, Australia. The data are limited to a single Tier 2 construction company. - Practical implications The findings of this study can be utilised to suggest improvements in the current (or develop new) workplace training initiatives. - Social implications The research suggests that workplace training has positive relationship with career growth. The results suggest that in the construction industry, employees are generally well aware of the importance of workplace training in their career development and they largely appreciate training as being a critical factor for developing their capacity to perform their roles successfully, and to maintain their employability. - Originality/value This paper is unique as it investigates the current skills gap in both generic and skill areas within the construction industry in Queensland, Australia. So far no work has been undertaken to identify and discusses the main method of workplace learning within the Tier 2 industry in the context of Queensland Australia.