470 resultados para 290804 Construction Engineering


Relevância:

80.00% 80.00%

Publicador:

Resumo:

The design-build (DB) delivery method has been widely used in the United States due to its reputed superior cost and time performance. However, rigorous studies have produced inconclusive support and only in terms of overall results, with few attempts being made to relate project characteristics with performance levels. This paper provides a larger and more finely grained analysis of a set of 418 DB projects from the online project database of the Design-Build Institute of America (DBIA), in terms of the time-overrun rate (TOR), early start rate (ESR), early completion rate (ECR) and cost overrun rate (COR) associated with project type (e.g., commercial/institutional buildings and civil infrastructure projects), owners (e.g., Department of Defense and private corporations), procurement methods (e.g., ‘best value with discussion’ and qualifications-based selection), contract methods (e.g., lump sum and GMP) and LEED levels (e.g., gold and silver). The results show ‘best value with discussion’ to be the dominant procurement method and lump sum the most frequently used contract method. The DB method provides relatively good time performance, with more than 75% of DB projects completed on time or before schedule. However, with more than 50% of DB projects cost overrunning, the DB advantage of cost saving remains uncertain. ANOVA tests indicate that DB projects within different procurement methods have significantly different time performance and that different owner types and contract methods significantly affect cost performance. In addition to contributing to empirical knowledge concerning the cost and time performance of DB projects with new solid evidence from a large sample size, the findings and practical implications of this study are beneficial to owners in understanding the likely schedule and budget implications involved for their particular project characteristics.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

With an increasing level of collaboration amongst researchers, software developers and industry practitioners in the past three decades, building information modelling (BIM) is now recognized as an emerging technological and procedural shift within the architect, engineering and construction (AEC) industry. BIM is not only considered as a way to make a profound impact on the professions of AEC, but is also regarded as an approach to assist the industry to develop new ways of thinking and practice. Despite the widespread development and recognition of BIM, a succinct and systematic review of the existing BIM research and achievement is scarce. It is also necessary to take stock on existing applications and have a fresh look at where BIM should be heading and how it can benefit from the advances being made. This paper first presents a review of BIM research and achievement in AEC industry. A number of suggestions are then made for future research in BIM. This paper maintains that the value of BIM during design and construction phases is well documented over the last decade, and new research needs to expand the level of development and analysis from design/build stage to postconstruction and facility asset management. New research in BIM could also move beyond the traditional building type to managing the broader range of facilities and built assets and providing preventative maintenance schedules for sustainable and intelligent buildings

Relevância:

40.00% 40.00%

Publicador:

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Automation technology can provide construction firms with a number of competitive advantages. Technology strategy guides a firm's approach to all technology, including automation. Engineering management educators, researchers, and construction industry professionals need improved understanding of how technology affects results, and how to better target investments to improve competitive performance. A more formal approach to the concept of technology strategy can benefit the construction manager in his efforts to remain competitive in increasingly hostile markets. This paper recommends consideration of five specific dimensions of technology strategy within the overall parameters of market conditions, firm capabilities and goals, and stage of technology evolution. Examples of the application of this framework in the formulation of technology strategy are provided for CAD applications, co-ordinated positioning technology and advanced falsework and formwork mechanisation to support construction field operations. Results from this continuing line of research can assist managers in making complex and difficult decisions regarding reengineering construction processes in using new construction technology and benefit future researchers by providing new tools for analysis. Through managing technology to best suit the existing capabilities of their firm, and addressing the market forces, engineering managers can better face the increasingly competitive environment in which they operate.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Many studies into construction procurement methods reveal evidence of a need to change the culture and attitude in the construction industry, transition from traditional adversarial relationships to cooperative and collaborative relationships. At the same time there is also increasing concern and discussion on alternative procurement methods, involving a movement away from traditional procurement systems. Relational contracting approaches, such as partnering and relationship management, are business strategies that align the objectives of clients, commercial participants and stakeholders. It provides a collaborative environment and a framework for all participants to adapt their behaviour to project objectives and allows for engagement of those subcontractors and suppliers down the supply chain. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a history of slow implementation of relational contracting down the supply chain. Furthermore, there exists little research on relationship management conducted in the supply chain context. This research aims to explore the association between relational contracting structures and processes and supply chain sustainability in the civil engineering construction industry. It endeavours to shed light on the practices and prerequisites for relationship management implementation success and for supply sustainability to develop. The research methodology is a triangulated approach based on Cheung.s (2006) earlier research where questionnaire survey, interviews and case studies were conducted. This new research includes a face-to-face questionnaire survey that was carried out with 100 professionals from 27 contracting organisations in Queensland from June 2008 to January 2009. A follow-up survey sub-questionnaire, further examining project participants. perspectives was sent to another group of professionals (as identified in the main questionnaire survey). Statistical analysis including multiple regression, correlation, principal component factor analysis and analysis of variance were used to identify the underlying dimensions and test the relationships among variables. Interviews and case studies were conducted to assist in providing a deeper understanding as well as explaining findings of the quantitative study. The qualitative approaches also gave the opportunity to critique and validate the research findings. This research presents the implementation of relationship management from the contractor.s perspective. Findings show that the adaption of relational contracting approach in the supply chain is found to be limited; contractors still prefer to keep the suppliers and subcontractors at arm.s length. This research shows that the degree of match and mismatch between organisational structuring and organisational process has an impact on staff.s commitment level and performance effectiveness. Key issues affecting performance effectiveness and relationship effectiveness include total influence between parties, access to information, personal acquaintance, communication process, risk identification, timely problem solving and commercial framework. Findings also indicate that alliance and Early Contractor Involvement (ECI) projects achieve higher performance effectiveness at both short-term and long-term levels compared to projects with either no or partial relationship management adopted.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Building Information Modeling (BIM) is a modern approach to the design, documentation, delivery, and life cycle management of buildings through the use of project information databases coupled with object-based parametric modeling. BIM has the potential to revolutionize the Architecture, Engineering and Construction (AEC) industry in terms of the positive impact it may have on information flows, working relationships between project participants from different disciplines and the resulting benefits it may achieve through improvements to conventional methods. This chapter reviews the development of BIM, the extent to which BIM has been implemented in Australia, and the factors which have affected the up-take of BIM. More specifically, the objectives of this chapter are to investigate the adoption of BIM in the Australian AEC industry and factors that contribute towards the uptake (or non uptake) of BIM. These objectives are met by a review of the related literature in the first instance, followed by the presentation of the results of a 2007 postal questionnaire survey and telephone interviews of a random sample of professionals in the Australian AEC industry. The responses suggest that less than 25 percent of the sample had been involved in BIM – rather less than might be expected from reading the literature. Also, of those who have been involved with BIM, there has been very little interdisciplinary collaboration. The main barriers impeding the implementation of BIM widely across the Australian AEC industry are also identified. These were found to be primarily a lack of BIM expertise, lack of awareness and resistance to change. The benefits experienced as a result of using BIM are also discussed. These include improved design consistency, better coordination, cost savings, higher quality work, greater productivity and increased speed of delivery. In terms of conclusion, some suggestions are made concerning the underlying practical reasons for the slow up-take of BIM and the successes for those early adopters. Prospects for future improvement are discussed and proposals are also made for a large scale worldwide comparative study covering industry-wide participants

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Incorporating engineering concepts into middle school curriculum is seen as an effective way to improve students’ problem-solving skills. A selection of findings is reported from a science, technology, engineering and mathematics (STEM)-based unit in which students in the second year (grade 8) of a three-year longitudinal study explored engineering concepts and principles pertaining to the functioning of simple machines. The culminating activity, the focus of this paper, required the students to design, construct, test, and evaluate a trebuchet catapult. We consider findings from one of the schools, a co-educational school, where we traced the design process developments of four student groups from two classes. The students’ descriptions and explanations of the simple machines used in their catapult design are examined, together with how they rated various aspects of their engineering designs. Included in the findings are students’ understanding of how their simple machines were simulated by the resources supplied and how the machines interacted in forming a complex machine. An ability to link physical materials with abstract concepts and an awareness of design constraints on their constructions were apparent, although a desire to create a ‘‘perfect’’ catapult despite limitations in the physical materials rather than a prototype for testing concepts was evident. Feedback from teacher interviews added further insights into the students’ developments as well as the teachers’ professional learning. An evolving framework for introducing engineering education in the pre-secondary years is proposed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This study examines the process by which newly recruited nuclear engineering and technical staff came to understand, define, think, feel and behave within a distinct group that has a direct contribution to the organization's overall emphasis on a culture of reliability and system safety. In the field of organizational behavior the interactive model of social identity formation has been recently proposed to explain the process by which the internalization of shared norms and values occurs, an element critical in identity formation. Using this rich model of organizational behavior we analyzed multiple sources of data from nine new hires over a period of three years. This was done from the time they were employed to investigate the construction of social identity by new entrants entering into a complex organizational setting reflected in the context of a nuclear facility. Informed by our data analyses, we found support for the interactive model of social identity development and report the unexpected finding that a newly appointed member's age and level of experience appears to influence the manner in which they adapt, and assimilate into their surroundings. This study represents an important contribution to the safety and reliability literature as it provides a rich insight into the way newly recruited employees enact the process by which their identities are formed and hence act, particularly under conditions of duress or significant organizational disruption in complex organizational settings.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Community-based protests against major construction and engineering projects are becoming increasingly common as concerns over issues such as corporate social accountability, climate change and corruption become more prominent in the public's mind. Public perceptions of risk associated with these projects can have a contagious effect, which mismanaged can escalate into long-term and sometimes acrimonious protest stand-offs that have negative implications for the community, firms involved and the construction industry as a whole. This paper investigates the role of core group members in sustaining community-based protest against construction and engineering projects. Using a thematic story telling approach which draws on ethnographic method and social contagion theories, it presents an in-depth analysis of a single case study - one of Australia's longest standing community protests against a construction project. It concludes that core group members play a critical role, within anarchic structures which provide a high degree of spontaneity and improvisation, in sustaining movement continuity by building collective identity, mobilising resources and a moving interface which developers find hard to communicate with.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trialed. Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.