122 resultados para wind farms


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Wind speed measurement systems are sparse in the tropical regions of Australia. Tropical cyclone wind speeds impacting communities are often ‘guestimated’ from analyzing damaged structures. A re-locatable anemometer system is required to enable measurements of wind speeds. This paper discusses design criteria of the tripods and tie down system, proposed deployment of the anemometers, instrumentation, and data logging. Preliminary assessment of the anemometer response indicates a reliable system for 1 second response, however, it is noted that the Australian building code and wind loading standard uses a moving average time of approximately 0.2 seconds for its wind speed design criteria.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Wind speed measurement systems are sparse in the tropical regions of Australia. Given this, tropical cyclone wind speeds impacting communities are seldom measured and often only ‘guestimated’ by analysing the extent of damage to structures. In an attempt to overcome this dearth of data, a re-locatable network of anemometers to be deployed prior to tropical cyclone landfall is currently being developed. This paper discusses design criteria of the network’s tripods and tie down system, proposed deployment of the anemometers, instrumentation and data logging. Preliminary assessment of the anemometer response indicates a reliable system for measuring the spectral component of wind with frequencies of approximately 1 Hz. This system limitation highlights an important difference between the capabilities of modern instrumentation and that of the Dines anemometer (around 0.2 seconds) that was used to develop much of the design criteria within the Australian building code and wind loading standard.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Thunderstorm downbursts are important for wind engineers as they have been shown to produce the design wind speeds for mid to high return periods in many regions of Australia [1]. In structural design codes (e.g. AS/NZS1170.02-02) an atmospheric boundary layer (ABL) is assumed, and a vertical profile is interpolated from recorded 10 m wind speeds. The ABL assumption is however inaccurate when considering the complex structure of a thunderstorm outflow, and its effects on engineered structures. Several researchers have shown that the downburst, close to its point of divergence is better represented by an impinging wall jet profile than the traditional ABL. Physical modelling is the generally accepted approach to estimate wind loads on structures and it is therefore important to physically model the thunderstorm downburst so that its effects on engineered structures may be studied. An advancement on the simple impinging jet theory, addressed here is the addition of a pulsing mechanism to the jet which allows not only the divergent characteristics of a downburst to be produced, but also it allows the associated leading ring vortex to be developed. The ring vortex modelling is considered very important for structural design as it is within the horizontal vortex that the largest velocities occur [2]. This paper discusses the flow field produced by a pulsed wall jet, and also discusses the induced pressures that this type of flow has on a scaled tall building.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Historical wind data for Kuwait and Dubai have been analysed to determine the design wind speed for the region. Kuwait and Dubai are located near the northern and southern end of the Persian Gulf respectively. The winds in this region just north of the Tropic of Capricorn are dominated by the Shamal, literally 'north' in Arabic. The winds have traditional Bedouin names such as Al-Haffar (the driller), and Barih Thorayya (morning star). The Al-Dabaran is generally the strongest Shamal in late summer, and can last up to 40 days bringing sand and duststorms.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The drive towards high efficiency wind energy conversion systems has resulted in almost all the modern wind turbines to operate in the variable speed mode which inevitably requires back-to-back power electronic converters to decouple generator dynamics from the grid. The aim of this paper is to present an analysis on suitable topologies for the generator-side converter (rectifier) of the back-to-back converter arrangement. Performance of the two most popular rectifier systems, namely, the passive diode bridge rectifier and the active six-switch two-level rectifier are taken as two extremes to evaluate other topologies presented in this paper. The other rectifier systems considered in this study include combinations of a diode bridge rectifier and electronic reactance(s), a combination of a rectifier and a dc-dc converter and a half controlled rectifier. Diode-clamped and capacitor-clamped three-level active rectifier topologies and their possible switch reductions are also discussed in relation to the requirements of modern high power wind energy conversion systems (WECSs). Simulation results are presented to support conclusion derived from this analysis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Three-Phase Nine-Switch Converter (NSC) topology for Doubly Fed Induction Generator in wind energy generation is proposed in this paper. This converter topology was used in various applications such as Hybrid Electric Vehicles and Uninterruptable Power Supplies. In this paper, Nine-Switch Converter is introduced in Doubly Fed Induction Generator in renewable energy application for the first time. It replaces the conventional Back-to-Back Pulse Width Modulated voltage source converter (VSC) which composed of twelve switches in many DFIG applications. Reduction in number of switches is the most beneficial in terms of cost and power switching losses. The operation principle of Nine-Switch Converter using SPWM method is discussed. The resulting NSC performance of rotor side current control, active power and reactive control are compared with Back-to Back voltage source converter performance. DC link voltage regulation using front end converter is also presented. Finally the simulation results of DFIG performances using NSC and Back-to-Back VSC are analyzed and compared.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a new direct integration scheme for supercapacitors that are used to mitigate short term power fluctuations in wind power systems. The idea is to replace ordinary capacitors of a 3-level flying capacitor inverter by supercapacitors and operate them under variable voltage conditions. This approach eliminates the need of interfacing dc-dc converters for supercapacitor integration and thus considerably improves the overall efficiency. However, the major problem of this unique system is the change of supercapacitor voltages. An analysis on the effects of these voltage variations are presented. A space vector modulation method, built from the scratch, is proposed to generate undistorted current even in the presence of dynamic changes in supercapacitor voltages. A supercapacitor voltage equalisation algorithm is also proposed. Furthermore, resistive behavior of supercapacitors at high frequencies and the need for a low pass filter are highlighted. Simulation results are presented to verify the efficacy of the proposed system in suppressing short term wind power fluctuations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a grid-side inverter based supercapacitor direct integration scheme for wind power systems. The inverter used in this study consists of a conventional two-level inverter and three H-bridge modules. Three supercapacitor banks are directly connected to the dc-links of H-bridge modules. This approach eliminates the need for interfacing dc-dc converters and thus considerably improves the overall efficiency. However, for the maximum utilization of super capacitors their voltages should be allowed to vary. As a result of this variable voltage space vectors of the hybrid inverter get distributed unevenly. To handle this issue, a modified PWM method and a space vector modulation method are proposed and they can generate undistorted current even in the presence of unevenly distributed space vectors. A supercapacitor voltage balancing method is also presented in this paper. Simulation results are presented to validate the efficacy of the proposed scheme, modulation methods and control techniques.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An offshore wind turbine usually has the grid step-up transformer integrated in the nacelle. This increases mechanical loading of the tower. In that context, a transformer-less, high voltage, highly-reliable and compact converter system for nacelle installation would be an attractive solution for large offshore wind turbines. This paper, therefore, presents a transformer-less grid integration topology for PMSG based large wind turbine generator systems using modular matrix converters. Each matrix converter module is fed from three generator coils of the PMSG which are phase shifted by 120°. Outputs of matrix converter modules are connected in series to increase the output voltage and thus eliminate the need of a coupling step-up transformer. Moreover, dc-link capacitors found in conventional back-to-back converter topologies are eliminated in the proposed system. Proper multilevel output voltage generation and power sharing between converter modules are achieved through an advanced switching strategy. Simulation results are presented to validate the proposed modular matrix converter system, modulation method and control techniques.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Additional converters that are used to interface energy storage devices incur power losses as well as increased system cost and complexity. The need for additional converters can be eliminated if the grid side inverter can itself be effectively used as the interface for energy storage. This paper therefore proposes a technique whereby the grid side inverter can also be used as an interface to connect a supercapacitor energy storage for wind energy conversion systems. The proposed grid side inverter is formed by cascading a 3-level inverter and a 2-level inverter through a coupling transformer. The three-level inverter is the main inverter and it is powered by the rectified output of the wind turbine coupled AC generator while the 2-level auxiliary inverter is connected to the super capacitor bank that is used to compensate short term power fluctuations. Novel modulation and control techniques are proposed to address the problems associated with non-integer and dynamically-changing dc-link voltage ratio, which is caused by the random nature of wind. Simulation results are presented to verify the efficacy of the proposed system in suppressing short term wind power fluctuations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a novel concept of Energy Storage System (ESS) interfacing with the grid side inverter in wind energy conversion systems. The inverter system used here is formed by cascading a 2-level inverter and a three level inverter through a coupling transformer. The constituent inverters are named as the “main inverter” and the “auxiliary inverter” respectively. The main inverter is connected with the rectified output of the wind generator while the auxiliary inverter is attached to a Battery Energy Storage System (BESS). The BESS ensures constant power dispatch to the grid irrespective of change in wind condition. Furthermore, this unique combination of BESS and inverter eliminates the need of additional dc-dc converters. Novel modulation and control techniques are proposed to address the problem of non-integer, dynamically-changing dc-link voltage ratio, which is due to random wind changes. Strategies used to handle auxiliary inverter dc-link voltage imbalances and controllers used to charge batteries at different rates are explained in detail. Simulation results are presented to verify the efficacy of the proposed modulation and control techniques in suppressing random wind power fluctuations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper explores the possibility of using grid side inverter as an interface to connect energy storage systems. A dual inverter system, formed by cascading two 2-level inverters through a coupling transformer, is used as the testing model. The inverters are named as “main inverter” and “auxiliary inverter”. The main inverter is powered by the rectified output of the wind generator while the auxiliary inverter is attached to a Battery Energy Storage System (BESS). If there is a surplus of wind power compared to the demand, then that would be stored in BESS while if there is a deficit in wind power then the demand will be satisfied by supplying power from the BESS. This enables constant power dispatch to the grid irrespective of wind changes. Novel modulation and control techniques are proposed to address the problem of non-integer, dynamically-varying dc-link voltage ratio, which is due to random wind changes. Furthermore, a maximum power tracking controller for this unique system is explained in detail. Simulation results verify the efficacy of proposed modulation and control techniques in suppressing random power fluctuations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Battery energy storage system (BESS) is to be incorporated in a wind farm to achieve constant power dispatch. The design of the BESS is based on the forecasted wind speed, and the technique assumes the distribution of the error between the forecasted and actual wind speeds is Gaussian. It is then shown that although the error between the predicted and actual wind powers can be evaluated, it is non-Gaussian. With the known distribution in the error of the predicted wind power, the capacity of the BESS can be determined in terms of the confident level in meeting specified constant power dispatch commitment. Furthermore, a short-term power dispatch strategy is also developed which takes into account the state of charge (SOC) of the BESS. The proposed approach is useful in the planning of the wind farm-BESS scheme and in the operational planning of the wind power generating station.