744 resultados para residential construction costs


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Over the past 20 years there has been a considerable push at all three tiers of Government and private industry in Australia to improve the energy efficiency and sustainability levels of residential housing. A number of these initiatives have been voluntary, such as solar power and solar heating rebates, with other mandatory measures being incorporated into building standards and codes. Although the importance of energy efficiency and sustainable materials have been widely conveyed both at the academic and public level, it does not always reflect in the residential house purchase decision by typical house buyers, including residential property investors. This paper will analyse a range of housing markets in Brisbane to determine the investment performance of those markets over the past 3 years to determine any significant differences between new residential suburbs and older residential suburbs where houses have not been constructed to the current energy efficiency and sustainability guidelines. The range of suburbs to be analysed will focus on middle to lower high value suburbs, with a particular focus on residential housing in Master Planned Communities to determine if socio-economic factors and development size and scope have an impact of the purchase and investment performance of sustainable houses in comparison to older housing stock. The paper confirms that the residential property market shows a higher capital return for residential property built under stricter sustainability guidelines than similar located and type of property built prior to the BCA 2004 and older style project type homes erected prior to 2000.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this scoping paper is to offer an overview of the literature to determine the development to date in the area of residential real estate agency academic and career education in respect to Foreign Direct Investment (FDI) transactions and implications in Australia. This paper will review studies on the issue of foreign real estate ownership and FDI in Australian real estate markets to develop an understanding of the current state of knowledge on residential real estate agency practice, career education and real estate licensing requirements in Australia. The distinction between the real estate profession education, compared to other professions such as accounting, legal and finance is based on the intensity of the professional career training prior or post formal academic training. Real estate education could be carried out with relatively higher standards in terms of licensing requirement, career and academic education. As FDI in the Australian real estate market is a complex globalisation and economic phenomenon, a simple content of residential real estate training and education may not promote proper management or capacity in dealing with relevant foreign residential property market transaction. The preliminary summarising from the literature of residential real estate agency education, with its current relevant or emerging licensing requirement are focused on its role and effectiveness and impact in residential real estate market. Particular focus will be directed to the FDI relevant residential real estate agency transactions and practices, which have been strongly influenced by the current residential real estate market and agency practices. Taken together, there are many opportunities for future research to extend our understanding and improving the residential real estate agency education and training of Foreign Direct Investment in the Australian residential real estate sector.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The article discusses the issues of resistance; that is resistance by prisoners to the various manifestations of power operating in high security prisons, as well as that of attempted shifts in the regime from physical to psychological control. Other topics highlighted include legitimacy and 'official discourse', mourning and the construction of 'ungrievable lives' and the importance of finding a way out of the cycle of violence, which high security regimes perpetuate.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry has long been burdened with inherent adversarial relationships among the parties and the resulting disputes. Dispute review boards (DRBs) have emerged as alternatives to settle construction-related disputes outside courts. Although DRBs have found support in some quarters of the construction industry, the quantitative assessment of the impact of DRBs has not been adequately addressed. This paper presents the results of a research project undertaken to assess the impact of DRBs on the construction program of a large-scale highway agency. Three dimensions of DRB impact were assessed: (1) influence on project cost and schedule performance, (2) effectiveness of DRBs in preventing and resolving construction disputes, and (3) costs of DRB implementation. The analyses encompass data from approximately 3,000 projects extending over a 10-year period (2000–2009). Quantitative measures of performance were developed and analyzed for each category. Projects that used DRBs faced reduced costs and schedule growth (6.88 and 12.92%, respectively) when compared to non-DRB projects (11.53 and 28.96%). DRBs were also found to be effective in avoiding and settling disputes; the number of arbitration cases reduced consistently after DRB implementation, and DRBs have a success rate of 97% in settling disputes for which DRBs were used. Moreover, costs of DRBs were found to comprise a relatively small fraction (i.e., approximately 0.3%) of total project budgets. It was concluded that DRBs were effective dispute prevention and resolution alternatives with no significant adverse effects on project performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Temporary Traffic Control Plans (TCP’s), which provide construction phasing to maintain traffic during construction operations, are integral component of highway construction project design. Using the initial design, designers develop estimated quantities for the required TCP devices that become the basis for bids submitted by highway contractors. However, actual as-built quantities are often significantly different from the engineer’s original estimate. The total cost of TCP phasing on highway construction projects amounts to 6–10% of the total construction cost. Variations between engineer estimated quantities and final quantities contribute to reduced cost control, increased chances of cost related litigations, and bid rankings and selection. Statistical analyses of over 2000 highway construction projects were performed to determine the sources of variation, which later were used as the basis of development for an automated-hybrid prediction model that uses multiple regressions and heuristic rules to provide accurate TCP quantities and costs. The predictive accuracy of the model developed was demonstrated through several case studies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The contemporary default materials for multi-storey buildings – namely concrete and steel – are all significant generators of carbon and the use of timber products provides a technically, economically and environmentally viable alternative. In particular, timber’s sustainability can drive increased use and subsequent evolution of the Blue economy as a new economic model. National research to date, however, indicates a resistance to the uptake of timber technologies in Australia. To investigate this further, a preliminary study involving a convenience sample of 15 experts was conducted to identify the main barriers involved in the use of timber frames in multi-storey buildings. A closed-ended questionnaire survey involving 74 experienced construction industry participants was then undertaken to rate the relative importance of the barriers. The survey confirmed the most significant barriers to be a perceived increase in maintenance costs and fire risk, together with a limited awareness of the emerging timber technologies available. It is expected that the results will benefit government and the timber industry, contributing to environmental improvement by developing strategies to increase the use of timber technologies in multi-storey buildings by countering perceived barriers in the Australian context.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents the results of a full-scale research project undertaken to assess scour losses/gains for modular tray green roof specimens placed on a mock-up building, and identify important factors to consider for wind design criteria. Visual assessment of the experimental results showed that usage of vegetation, parapet height, wind direction, and test duration were the predominant factors affecting scour resistance of the growth media in tested specimens. Statistical analysis results indicated that the differences in soil losses measured among Phase 2’s test trials were more significant than those in Phase 1. This was attributed to the lack of parapet, cornering wind conditions, and longer test duration found in Phase 2. Findings presented in this paper constitute a benchmark for future research to improve the knowledge gap that exists in green roof wind design.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents the results of a research project undertaken to assess the impact of DRBs on the construction program of a large scale highway agency. Three dimensions of DRB impact were assessed: (1)influence on project cost and schedule performance, (2) effectiveness of DRBs in preventing and resolving construction disputes, and (3) costs of DRB implementation. The analyses encompass data from approximately 3,000 projects extending over a 10 year period (2000-2009).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Overview The incidence of skin tears, pressure injuries and chronic wounds increases with age [1-4] and therefore is a serious issue for staff and residents in Residential Aged Care Facilities (RACFs). A pilot project funded in Round 2 of the Encouraging Best Practice in Residential Aged Care (EBPRAC) program by the then Australian Government Department of Health and Ageing found that a substantial proportion of residents in aged care facilities experienced pressure injuries, skin tears or chronic wounds. It also found the implementation of the evidence based Champions for Skin Integrity (CSI) model of wound care was successful in significantly decreasing the prevalence and severity of wounds in residents, improving staff skills and knowledge of evidence based wound management, increasing staff confidence with wound management, increasing implementation of evidence based wound management and prevention strategies, and increasing staff awareness of their roles in evidence based wound care at all levels [5]. Importantly, during the project, the project team developed a resource kit on evidence based wound management. Two critical recommendations resulting from the project were that: - The CSI model or a similar strategic approach should be implemented in RACFs to facilitate the uptake of evidence based wound management and prevention - The resource kit on evidence based wound management should be made available to all Residential Aged Care Facilities and interested parties A proposal to disseminate or rollout the CSI model of wound care to all RACFs across Australia was submitted to the department in 2012. The department approved funding from the Aged Care Services Improvement Healthy Ageing Grant (ACSIHAG) at the same time as the Round 3 of the Encouraging Better Practice in Aged Care (EBPAC) program. The dissemination involved two crucial elements: 1. The updating, refining and distribution of a Champions for Skin Integrity Resource Kit, more commonly known as a CSI Resource Kit and 2. The presentation of intensive one day Promoting Healthy Skin “Train the Trainer” workshops in all capital cities and major regional towns across Australia Due to demand, the department agreed to fund a second round of workshops focussing on regional centres and the completion date was extended to accommodate the workshops. Later, the department also decided to host a departmental website for a number of clinical domains, including wound management, so that staff from the residential aged care sector had easy access to a central repository of helpful clinical resource material that could be used for improving the health and wellbeing of their older adults, consumers and carers. CSI Resource Kit Upgrade and Distribution: At the start of the project, a full evidence review was carried out on the material produced during the EBPRAC-CSI Stage 1 project and the relevant evidence based changes were made to the documentation. At the same time participants in the EBPRAC-CSI Stage 1 project were interviewed for advice on how to improve the resource material. Following this the documentation, included in the kit, was sent to independent experts for peer review. When this process was finalised, a learning designer and QUT’s Visual Communications Services were engaged to completely refine and update the design of the resources, and combined resource kit with the goal of keeping the overall size of the kit suitable for bookshelf mounting and the cost at reasonable levels. Both goals were achieved in that the kit is about the same size as a 25 mm A4 binder and costs between $19.00 and $28.00 per kit depending on the size of the print run. The dissemination of the updated CSI resource kit was an outstanding success. Demand for the kits was so great that a second print run of 2,000 kits was arranged on top of the initial print run of 4,000 kits. All RACFs across Australia were issued with a kit, some 2,740 in total. Since the initial distribution another 1,100 requests for kits has been fulfilled as well as 1,619 kits being distributed to participants at the Promoting Healthy Skin workshops. As the project was winding up a final request email was sent to all workshop participants asking if they required additional kits or resources to distribute the remaining kits and resources. This has resulted in requests for 200 additional kits and resources. Feedback from the residential aged care sector and other clinical providers who have interest in wound care has been very positive regarding the utility of the kit, (see Appendix 4). Promoting Healthy Skin Workshops The workshops also exceeded the project team’s initial objective. Our goal of providing workshop training for staff from one in four facilities and 450 participants was exceeded, with overwhelming demand for workshop places resulting in the need to provide a second round of workshops across Australia. At the completion of the second round, 37 workshops had been given, with 1286 participants, representing 835 facilities. A number of strategies were used to promote the workshops ranging from invitations included in the kit, to postcard mail-outs, broadcast emailing to all facilities and aged care networks and to articles and paid advertising in aged care journals. The most effective method, by far, was directly phoning the facilities. This enabled the caller to contact the relevant staff member and enlist their support for the workshop. As this is a labour intensive exercise, it was only used where numbers needed bolstering, with one venue rising from 3 registrants before the calls to 53 registrants after. The workshops were aimed at staff who had the interest and the capability of implementing evidence-based wound management within their facility or organisation. This targeting was successful in that a large proportion (68%) of participants were Registered Nurses, Nurse Managers, Educators or Consultants. Twenty percent were Endorsed Enrolled Nurses with the remaining 12% being made up of Personal Care Workers or Allied Health Professionals. To facilitate long term sustainability, the workshop employed train-the-trainer strategies. Feedback from the EBPRAC-CSI Stage 1 interviews was used in the development of workshop content. In addition, feedback from the workshop conducted at the end of the EBPRAC-CSI Stage 1 project suggested that change management and leadership training should be included in the workshops. The program was trialled in the first workshop conducted in Brisbane and then rolled out across Australia. Participants were asked to complete pre and post workshop surveys at the beginning and end of the workshop to determine how knowledge and confidence improved over the day. Results from the pre and post surveys showed significant improvements in the level of confidence in attendees’ ability to implement evidence based wound management. The results also indicated a significant increase in the level of confidence in ability to implement change within their facility or organisation. This is an important indication that the inclusion of change management/leadership training with clinical instruction can increase staff capacity and confidence in translating evidence into practice. To encourage the transfer of the evidence based content of the workshop into practice, participants were asked to prepare an Action Plan to be followed by a simple one page progress report three months after the workshop. These reports ranged from simple (e.g. skin moisturising to prevent skin tears), to complex implementation plans for introducing the CSI model across the whole organisation. Outcomes described in the project reports included decreased prevalence of skin tears, pressure injuries and chronic wounds, along with increased staff and resident knowledge and resident comfort. As stated above, some organisations prepared large, complex plans to roll out the CSI model across their organisation. These plans included a review of the organisation’s wound care system, policies and procedures, the creation of new processes, the education of staff and clients, uploading education and resource material onto internal electronic platforms and setting up formal review and evaluation processes. The CSI Resources have been enthusiastically sought and incorporated into multiple health care settings, including aged care, acute care, Medicare Local intranets (e.g. Map of Medicine e-pathways), primary health care, community and home care organisations, education providers and New Zealand aged and community health providers. Recommendations: Recommendations for RACFs, aged care and health service providers and government  Skin integrity and the evidence-practice gap in this area should be recognised as a major health issue for health service providers for older adults, with wounds experienced by up to 50% of residents in aged care settings (Edwards et al. 2010). Implementation of evidence based wound care through the Champions for Skin Integrity model in this and the pilot project has demonstrated the prevalence of wounds, wound healing times and wound infections can be halved.  A national program and Centre for Evidence Based Wound Management should be established to: - expand the reach of the model to other aged care facilities and health service providers for older adults - sustain the uptake of models such as the Champions for Skin Integrity (CSI) model - ensure current resources, expertise and training are available for consumers and health care professionals to promote skin integrity for all older adults  Evidence based resources for the CSI program and similar projects should be reviewed and updated every 3 – 4 years as per NH&MRC recommendations  Leadership and change management training is fundamental to increasing staff capacity, at all levels, to promote within-organisation dissemination of skills and knowledge gained from projects providing evidence based training Recommendations for future national dissemination projects  A formal program of opportunities for small groups of like projects to share information and resources, coordinate activities and synergise education programs interactively would benefit future national dissemination projects - Future workshop programs could explore an incentive program to optimise attendance and reduce ‘no shows’ - Future projects should build in the capacity and funding for increased follow-up with workshop attendees, to explore the reasons behind those who are unable to translate workshop learnings into the workplace and identify factors to address these barriers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

3D printing (3Dp) has long been used in the manufacturing sector as a way to automate, accelerate production and reduce waste materials. It is able to build a wide variety of objects if the necessary specifications are provided to the printer and no problems are presented by the limited range of materials available. With 3Dp becoming cheaper, more reliable and, as a result, more prevalent in the world at large, it may soon make inroads into the construction industry. Little is known however, of 3Dp in current use the construction industry and its potential for the future and this paper seeks to rectify this situation by providing a review of the relevant literature. In doing this, the three main 3Dp methods of contour crafting, concrete printing and D-shape 3Dp are described which, as opposed to the traditional construction method of cutting materials down to size, deliver only what is needed for completion, vastly reducing waste. Also identified is 3Dp’s potential to enable buildings to be constructed many times faster and with significantly reduced labour costs. In addition, it is clear that construction 3Dp can allow the further inclusion of Building Information Modelling into the construction process - streamlining and improving the scheduling requirements of a project. However, current 3Dp processes are known to be costly, unsuited to large-scale products and conventional design approaches, and have a very limited range of materials that can be used. Moreover, the only successful examples of construction in action to date have occurred in controlled laboratory environments and, as real world trials have yet to be completed, it is yet to be seen whether it can be it equally proficient in practical situations. Key Words: 3D Printing; Contour Crafting; Concrete Printing; D-shape; Building Automation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose of this paper One way in which the tendering process can be further improved is by reviewing and clarifying the high costs that participants face during the course of the tendering phase. The study aims to provide project teams working in construction tender preparation a clear picture of what to expect when tendering for infrastructure projects. Design/methodology/approach Firstly, a review of current literature on tendering in infrastructure projects is conducted to identify the associated costs affecting traditional and PPP procurements as well as the potential measures contributing to tendering cost-reduction. A theoretical framework and its corresponding research hypotheses, which are based on the literature reviewed, are then proposed. An industry-wide questionnaire survey is currently under design to solicit industry practitioners’ views on tendering costs and the associated tendering cost-reduction measures. The data collected in the survey will subject to statistical analysis to test the proposed research hypotheses, which will be reported in a forthcoming paper. Findings and value The direct and indirect costs in public-private procurement have been identified and have been categorised into internal and external costs arising from working on tender submissions. A theoretical framework, mainly composed of five mechanisms of cost reduction, has been proposed and will be tested in a forthcoming industry-wide questionnaire survey. Originality/value of paper The findings are expected to lead to a transparent tendering process in infrastructure procurement, in which there is increased engagement from the private sector as well as an increase in competitive tendering.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Speculative property developers, criticised for building dog boxes and the slums of tomorrow, are generally hated by urban planners and the public alike. But the doors of state governments are seemingly always open to developers and their lobbyists. Politicians find it hard to say no to the demands of the development industry for concessions because of the contribution housing construction makes to the economic bottom line and because there is a need for well located housing. New supply is also seen as a solution to declining housing affordability. Classical economic theory however is too simplistic for housing supply. Instead, an offshoot of Game Theory - Market Design – not only offers greater insight into apartment supply but also can simultaneously address price, design and quality issues. New research reveals the most significant risk in residential development is settlement risk – when buyers fail to proceed with their purchase despite there being a pre-sale contract. At the point of settlement, the developer has expended all the project funds only to see forecast revenue evaporate. While new buyers may be found, this process is likely to strip the profitability out of the project. As the global financial crisis exposed, buyers are inclined to walk if property values slide. This settlement problem reflects a poor legal mechanism (the pre-sale contract), and a lack of incentive for truthfulness. A second problem is the search costs of finding buyers. At around 10% of project costs, pre-sales are more expensive to developers than finance. This is where Market Design comes in.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Provision of network infrastructure to meet rising network peak demand is increasing the cost of electricity. Addressing this demand is a major imperative for Australian electricity agencies. The network peak demand model reported in this paper provides a quantified decision support tool and a means of understanding the key influences and impacts on network peak demand. An investigation of the system factors impacting residential consumers’ peak demand for electricity was undertaken in Queensland, Australia. Technical factors, such as the customers’ location, housing construction and appliances, were combined with social factors, such as household demographics, culture, trust and knowledge, and Change Management Options (CMOs) such as tariffs, price,managed supply, etc., in a conceptual ‘map’ of the system. A Bayesian network was used to quantify the model and provide insights into the major influential factors and their interactions. The model was also used to examine the reduction in network peak demand with different market-based and government interventions in various customer locations of interest and investigate the relative importance of instituting programs that build trust and knowledge through well designed customer-industry engagement activities. The Bayesian network was implemented via a spreadsheet with a tick box interface. The model combined available data from industry-specific and public sources with relevant expert opinion. The results revealed that the most effective intervention strategies involve combining particular CMOs with associated education and engagement activities. The model demonstrated the importance of designing interventions that take into account the interactions of the various elements of the socio-technical system. The options that provided the greatest impact on peak demand were Off-Peak Tariffs and Managed Supply and increases in the price of electricity. The impact in peak demand reduction differed for each of the locations and highlighted that household numbers, demographics as well as the different climates were significant factors. It presented possible network peak demand reductions which would delay any upgrade of networks, resulting in savings for Queensland utilities and ultimately for households. The use of this systems approach using Bayesian networks to assist the management of peak demand in different modelled locations in Queensland provided insights about the most important elements in the system and the intervention strategies that could be tailored to the targeted customer segments.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Life cycle energy analysis (LCEA) of eight residential buildings in and around Brisbane, Queensland, Australia, is undertaken in this study. Energy used in all three phases of construction, operation and demolition are considered. It is found that the main contribution to the operational energy in residential buildings is from use of general appliance. The choice of building materials is shown to have significant effects on the embodied energy for the production, construction, maintenance and demolition phases. From this study, it is shown that the embodied energy may vary from 10% to 30%, while the operational energy may vary from 65% to 90%. The demolition energy generally accounts for less than 4% of life cycle energy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper examines the question of whether the imposition of developer infrastructure charges on housing developers affects the price of residential land. Developer paid fees or charges are a commonly used mechanism for local governments to fund new infrastructure as a “user pays” method of funding new urban infrastructure. Some argue these costs are passed back to the original land owner by way of lower land prices. However, property developers claim these charges are added on to new land prices, with flow on negative impact to housing affordability. This paper presents the findings of a hedonic land price model that provides the first empirical evidence that infrastructure charges do increase residential land prices in Brisbane, Australia. This research is consistent with international findings and supports the proposition that developer paid infrastructure charges are over-passed to home buyers and are a significant contributor to reduced housing affordability.