Wireless Multi-media Sensor Networks (WMSNs) have become increasingly popular in recent years, driven in part by the increasing commoditization of small, low-cost CMOS sensors. As such, the challenge of automatically calibrating these types of cameras nodes has become an important research problem, especially for the case when a large quantity of these type of devices are deployed. This paper presents a method for automatically calibrating a wireless camera node with the ability to rotate around one axis. The method involves capturing images as the camera is rotated and computing the homographies between the images. The camera parameters, including focal length, principal point and the angle and axis of rotation can then recovered from two or more homographies. The homography computation algorithm is designed to deal with the limited resources of the wireless sensor and to minimize energy con- sumption. In this paper, a modified RANdom SAmple Consensus (RANSAC) algorithm is proposed to effectively increase the efficiency and reliability of the calibration procedure.
Resumo:
The need to better understand and deal with workplace stress has major implications for the construction industry, especially on a project level, because of its potential to directly impact on site productivity and safety, and ultimately, the achievement of project objectives. While there has been some understanding of the effect of workplace stress within the construction industry, the majority of these studies have explored individual determinants of workplace stress among construction professionals such as architects, engineers, quantity surveyors etc. To date, very little research has focused on workplace stress as encountered by construction site operatives. This is an important research deficiency as construction site operatives typically make up a significant percentage of on-site workforce and contribute most directly to project success. To address this imbalance in research, this paper proposes a theoretical framework to better understand site operatives’ experience of stress from a cultural perspective on three levels: individual, project and organizational which has been largely neglected in previous studies.
Resumo:
As the problems involving infrastructure delivery have become more complex and contentious, there has been an acknowledgement that these problems cannot be resolved by any one body working alone. This understanding has driven multi-sectoral collaboration and has led to an expansion of the set of actors, including stakeholders, who are now involved in delivery of infrastructure projects and services. However, more needs to be understood about how to include stakeholders in these processes and ways of developing the requisite combination of stakeholders to achieve effective outcomes. This thesis draws on stakeholder theory and governance network theory to obtain insights into how three multi-level networks within the Roads Alliance in Queensland engage with stakeholders in the delivery of complex and sensitive infrastructure services and projects. New knowledge about stakeholders will be obtained by testing a model of Stakeholder Salience and Engagement which combines and extends the stakeholder identification and salience theory, ladder of stakeholder management and engagement and the model of stakeholder engagement and moral treatment of stakeholders. By applying this model, the broad research question: “Who or what decides how stakeholders are engaged by governance networks delivering public outcomes?” will be addressed. The case studies will test a theoretical model of stakeholder salience and engagement which links strategic decisions about stakeholder salience with the quality and quantity of engagement strategies for engaging different types of stakeholders. A multiple embedded case study design has been selected as the overall approach to explore, describe, explain and evaluate how stakeholder engagement occurs in three governance networks delivering road infrastructure in Queensland. The research design also incorporates a four stage approach to data collection: observations, stakeholder analysis, telephone survey questionnaire and semi-structured interviews. The outcomes of this research will contribute to and extend stakeholder theory by showing how stakeholder salience impacts on decisions about the types of engagement processes implemented. Governance network theory will be extended by showing how governance networks interact with stakeholders through the concepts of stakeholder salience and engagement. From a practical perspective this research will provide governance networks with an indication of how to optimise engagement with different types of stakeholders. 2
Resumo:
Universities promote partnerships as an investment of social capital that may benefit communities. Mentoring of university students in schools has become key to induction of education workplace practices. One such arrangement is the mentoring of students from TAFE who endeavour to become teacher aides. However, there is no theoretical model for mentoring teacher aides and, similar to mentoring preservice teachers, such practices vary in quality and quantity. What are mentors’ perceptions of mentoring potential teacher aides within school settings? This mixed-method research involves a survey with extended responses. The aim is to determine practices and strategies for mentoring potential teacher aides (PTAs). Results indicated that PTAs require induction about the school culture and infrastructure, which includes ethics, values, operational plans, awareness of facilities and a range of other inductions that would aid the PTA’s work practices. Findings also revealed that many of the mentoring practices employed for preservice teachers may be used for mentoring PTAs in school settings. Indeed, mentors require personal attributes to facilitate the mentoring process. They also indicated outlining the education system requirements as fundamental to workplace operations. In addition, as most PTAs work with students in the classroom, the mentor’s pedagogical knowledge can further assist PTAs to develop an understanding of effective pedagogical practices, particularly for small groups or one-on-one sessions. Finally, a mentor’s modelling of practices and providing constructive feedback about the PTA’s practices can assist the development of workplace operations. In conclusion, the survey employed in this study may assist organisations to develop protocols of practice for workplace mentors. PTAs require mentors who are versed in effective mentoring practices that can more readily guide them towards success.
Resumo:
Objective: Diarrhoea in the enterally tube fed (ETF) intensive care unit (ICU) patient is a multifactorial problem. Diarrhoeal aetiologies in this patient cohort remain debatable; however, the consequences of diarrhoea have been well established and include electrolyte imbalance, dehydration, bacterial translocation, peri anal wound contamination and sleep deprivation. This study examined the incidence of diarrhoea and explored factors contributing to the development of diarrhoea in the ETF, critically ill, adult patient. ---------- Method: After institutional ethical review and approval, a single centre medical chart audit was undertaken to examine the incidence of diarrhoea in ETF, critically ill patients. Retrospective, non-probability sequential sampling was used of all emergency admission adult ICU patients who met the inclusion/exclusion criteria. ---------- Results: Fifty patients were audited. Faecal frequency, consistency and quantity were considered important criteria in defining ETF diarrhoea. The incidence of diarrhoea was 78%. Total patient diarrhoea days (r = 0.422; p = 0.02) and total diarrhoea frequency (r = 0.313; p = 0.027) increased when the patient was ETF for longer periods of time. Increased severity of illness, peripheral oxygen saturation (Sp02), glucose control, albumin and white cell count were found to be statistically significant factors for the development of diarrhoea. ---------- Conclusion: Diarrhoea in ETF critically ill patients is multi-factorial. The early identification of diarrhoea risk factors and the development of a diarrhoea risk management algorithm is recommended.
Resumo:
Background Heavy vehicle transportation continues to grow internationally; yet crash rates are high, and the risk of injury and death extends to all road users. The work environment for the heavy vehicle driver poses many challenges; conditions such as scheduling and payment are proposed risk factors for crash, yet the precise measure of these needs quantifying. Other risk factors such as sleep disorders including obstructive sleep apnoea have been shown to increase crash risk in motor vehicle drivers however the risk of heavy vehicle crash from this and related health conditions needs detailed investigation. Methods and Design The proposed case control study will recruit 1034 long distance heavy vehicle drivers: 517 who have crashed and 517 who have not. All participants will be interviewed at length, regarding their driving and crash history, typical workloads, scheduling and payment, trip history over several days, sleep patterns, health, and substance use. All participants will have administered a nasal flow monitor for the detection of obstructive sleep apnoea. Discussion Significant attention has been paid to the enforcement of legislation aiming to deter problems such as excess loading, speeding and substance use; however, there is inconclusive evidence as to the direction and strength of associations of many other postulated risk factors for heavy vehicle crashes. The influence of factors such as remuneration and scheduling on crash risk is unclear; so too the association between sleep apnoea and the risk of heavy vehicle driver crash. Contributory factors such as sleep quality and quantity, body mass and health status will be investigated. Quantifying the measure of effect of these factors on the heavy vehicle driver will inform policy development that aims toward safer driving practices and reduction in heavy vehicle crash; protecting the lives of many on the road network.
Resumo:
Life Cycle Cost Analysis provides a form of synopsis of the initial and consequential costs of building related decisions. These cost figures may be implemented to justify higher investments, for example, in the quality or flexibility of building solutions through a long term cost reduction. The emerging discipline of asset mnagement is a promising approach to this problem, because it can do things that techniques such as balanced scorecards and total quantity cannot. Decisions must be made about operating and maintaining infrastructure assets. An injudicious sensitivity of life cycle costing is that the longer something lasts, the less it costs over time. A life cycle cost analysis will be used as an economic evaluation tool and collaborate with various numbers of analyses. LCCA quantifies incurring costs commonly overlooked (by property and asset managers and designs) as replacement and maintenance costs. The purpose of this research is to examine the Life Cycle Cost Analysis on building floor materials. By implementing the life cycle cost analysis, the true cost of each material will be computed projecting 60 years as the building service life and 5.4% as the inflation rate percentage to classify and appreciate the different among the materials. The analysis results showed the high impact in selecting the floor materials according to the potential of service life cycle cost next.
Resumo:
Against a background of already thin markets in some sectors of major public sector infrastructure in Australia and the desire of Australian federal government to leverage private finance, concerns about ensuring sufficient levels of competition are prompting federal government to seek new sources of in-bound Foreign Direct Income. The aim of this paper is to justify and develop a means to deploying the eclectic paradigm of internationalisation that forms part of an Australian federally funded research project designed to explain the determinants of multinational contractors' willingness to bid for Australian public sector major infrastructure projects. Despite the dominance of the eclectic paradigm as a theory of internationalisation for over two decades, it has seen limited application in terms of multinational construction. It is expected that the research project will be the first empirical study to deploy the eclectic paradigm to inbound FDI to Australia whilst using the dominant economic theories advocated for use within the eclectic paradigm. Furthermore, the research project is anticipated to yield a number of practical benefits. These include estimates of the potential scope to attract more multinational contractors to bid for Australian public sector infrastructure, including the nature and extent to which this scope can be influenced by Australian governments responsible for the delivery of infrastructure. On the other hand, the research is also expected to indicate the extent to which indigenous and other multinational contractors domiciled in Australia are investing in special purpose technology and achieving productivity gains relative to foreign multinational contractors.
Resumo:
Australia is just one of many developed countries facing the challenge of delivering value for money in the provision of a substantial infrastructure pipeline amidst severe construction and private finance constraints. To help address this challenge, this chapter focuses on developing an understanding of the determinants of value at key procurement decision points that range from the make-or-buy decision, to buying in the context of market structures, including the exchange relationship and contractual arrangement decision. This understanding is based on theoretical pluralism and illustrated by research in the field of construction and maintenance, and in public-private partnerships.
Resumo:
The significant challenge faced by government in demonstrating value for money in the delivery of major infrastructure resolves around estimating costs and benefits of alternative modes of procurement. Faced with this challenge, one approach is to focus on a dominant performance outcome visible on the opening day of the asset, as the means to select the procurement approach. In this case, value for money becomes a largely nominal concept and determined by selected procurement mode delivering, or not delivering, the selected performance outcome, and notwithstanding possible under delivery on other desirable performance outcomes, as well as possibly incurring excessive transaction costs. This paper proposes a mind-set change in this particular practice, to an approach in which the analysis commences with the conditions pertaining to the project and proceeds to deploy transaction cost and production cost theory to indicate a procurement approach that can claim superior value for money relative to other competing procurement modes. This approach to delivering value for money in relative terms is developed in a first-order procurement decision making model outlined in this paper. The model developed could be complementary to the Public Sector Comparator (PSC) in terms of cross validation and the model more readily lends itself to public dissemination. As a possible alternative to the PSC, the model could save time and money in preparation of project details to lesser extent than that required in the reference project and may send a stronger signal to the market that may encourage more innovation and competition.
Resumo:
Heart failure is a complex disorder, characterized by activation of the sympathetic nervous system, leading to dysregulated Ca2+ homeostasis in cardiac myocytes and tissue remodeling. In a variety of diseases, cardiac malfunction is associated with aberrant fluxes of Ca2+ across both the surface membrane and the internal Ca2+ store, the sarcoplasmic reticulum (SR). One prominent hypothesis residues is that in heart failure, the activity of the ryanodine receptor (RyR2) Ca2+ release channel in the SR is increased due to excess phosphorylation and that this contributes to excess SR Ca2+ leak in diastole, reduced SR Ca2+ load and decreased contractility (Huke & Bers, 2008). There is controversy over which serine residues in RyR2 are hyperphosphorylated in animal models of heart failure and whether this is via the CaMKII or the PKA-linked signaling pathway. S2808, S2814 and S2030 in RyR2 have been variously claimed to be hyperphosphorylated. Our aim was to examine the degree of phosphorylation of these residues in RyR2 from failing human hearts. The use of human tissue was approved by the Human Research Ethics Committee, The Prince Charles Hospital, EC28114. Left ventricular tissue samples were obtained from an explanted heart of a patient with endstage heart failure (Emery Dreifuss Muscular Dystrophy with cardiomyopathy) and non-failing tissue was from a patient with cystic fibrosis undergoing heart-lung transplantation with no history of heart disease. SR vesicles were prepared as described by Laver et al. (1995) and examined with SDS-Page and Western Blot. Transferred proteins were probed with antibodies to detect total protein phosphorylation, phosphorylation of RyR2 serine residues S2808, S2814, S2030 and for the key proteins calsequestrin, triadin, junctin and FKBP12.6. To avoid membrane stripping artifact, each membrane was exposed to one phosphorylation-specific antibody and signal densities quantified using Bio-Rad Quantity One software. We found no distinguishable difference between failing and healthy hearts in the protein expression levels of RyR2, triadin, junctin or calsequestrin. We found an expected upregulation of total RyR2 phosphorylation in the failing heart sample, compared to a matched amount of RyR2 (quantified using densiometry) in healthy heart. Probing with antibodies detecting only the phosphorylated form of the specific RyR2 residues showed that the increase in total RyR2 phosphorylation in the failing heart was due to hyperphosphorylation of S2808 and S2814. We found that S2030 phosphorylation levels were unchanged in human heart failure. Interestingly, we found that S2030 has a basal level of phosphorylation in the healthy human heart, different from the absence of basal phosphorylation recently reported in rodent heart (Huke & Bers, 2008). Finally, preliminary results indicate that less FKBP 12.6 is associated with RyR2 in the failing heart, possibly as a consequence of PKA activation. In conclusion, residues S2808 and S2814 are hyperphosphorylated in human heart failure, presumably due to upregulation of the CaMKII and/or PKA signaling pathway as a result of chronic activation of the sympathetic nervous system. Such changes in RyR2 phosphorylation are believed to contribute to the leaky RyR2 phenotype associated with heart failure, which increases the incidence of arrhythmia and contributes to the severely impaired contractile performance of the failing heart. Huke S & Bers DM. (2008). Ryanodine receptor phosphorylation at serine 2030, 2808 and 2814 in rat cardiomyocytes. Biochemical and Biophysical Research Communications 376, 80-85. Laver DR, Roden LD, Ahern GP, Eager KR, Junankar PR & Dulhunty AF. (1995). Cytoplasmic Ca2+ inhibits the ryanodine receptor from cardiac muscle. Journal of Membrane Biology 147, 7-22. Proceedings
Resumo:
Project Procurement is a ‘great’ environment for ethical issues with its low-price state of mind and competition. It has many opportunities that could contribute to illegal activities or unethical behavior especially in the construction industry. In 2006 alone, 17.3% of 417 Malaysian government contract projects were considered sick due to the poor performance by the contractors. Therefore it is important to govern the project procurement, especially the plan procurement stage to ensure the accountability and transparency of the decision made in awarding the right contract to the best contractor. This is where project governance framework (PGF) is really needed in project procurement planning. Project governance is a subset of corporate governance focusing on the areas of corporate governance related to project activities, including: portfolio direction, project sponsorship, project and program management and efficiency and disclosure and reporting. This paper highlights the importance of implementing project governance framework (PGF) to ensure that the decision makers are answerable and accountable to the stakeholders, and the decision making is transparent to avoid any ethical issues arises. A comprehensive preliminary literature is carried out to discover the importance of executing PGF in project procurement in Malaysian public sector. By understanding the important of PGF, it is hoped that this will bring a signal to other developing countries to implement the similar method in ensuring the transparency of the decision making in project procurement planning in their countries.
Resumo:
There is a lack of research which identifies the role of the public-sector client in relation to ethical practice in plan procurement. This paper discusses a conceptual framework for ethical decision making in project procurement, focusing on public sector clients within the Malaysian construction industry. A framework is proposed to ensure that effective ethical decision making strategies are deployed to ensure that plan procurement is carried out with a transparent process so that the public sector clients are able to adopt. The conceptual framework adopts various factors that contribute to ethical decision making at the early stage of procurement and consists of the procurement system, individual factors, project characteristics, and organizational culture as the internal factors and professional code of conduct and government policies as the external factors. This framework rationalizes the relationships between systems, psychology and organizational theory to form an innovative understanding of making ethical decisions in plan procurement. It is expected that this proposed framework will be useful as a foundation for identifying the factors that contribute to ethical decision making focusing on the planning stage of procurement process.
Resumo:
The purpose of this investigation was to undertake pilot research to develop an understanding of the current culture of older Australian women’s (35-50 years) drinking behaviour from a uniquely female perspective. Methods Two separate focus group interviews were undertaken with women (N = 11) aged between 35 and 50 years living in South-East Queensland, Australia. Women were asked to openly discuss how and why they drink alcohol (ie., their regular drinking behaviour), how this has changed over time, and the attitudes and values that influence their behaviour. Results Participants reported that their consumption of alcohol was more regulated and controlled and although some women drank more frequently, the quantity consumed at each drinking occasion had decreased significantly. Occasional consumption of large amounts of alcohol tended to be the result of ‘incidental drinking’ as opposed to ‘determined drinking’. The reasons for alcohol consumption were found to be internal as well as social. Internal reasons included stress relief, increased relaxation and self reward. Further, alcohol was used as a social lubricant. This cohort also reported being influenced by the drinking patterns of their partners. Social group matching was however found to have a negative impact on alcohol consumption as social groups most commonly endorsed lesser levels of intoxication. Further, the women reported that they were of an age in which they felt excessive drinking to be ‘undignified’. Personal reasons such as vocational and family responsibilities further modified the levels of consumption for individual women. Finally, it was reported that perceived health risks that can result from excessive and/or repetitive drinking led to a decreased in consumption. Conclusion It is proposed that the findings of this investigation could be used to improve current knowledge regarding more mature women’s drinking culture, associated risks and risk prevention strategies.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.