677 resultados para policy production


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this article I outline and demonstrate a synthesis of the methods developed by Lemke (1998) and Martin (2000) for analyzing evaluations in English. I demonstrate the synthesis using examples from a 1.3-million-word technology policy corpus drawn from institutions at the local, state, national, and supranational levels. Lemke's (1998) critical model is organized around the broad 'evaluative dimensions' that are deployed to evaluate propositions and proposals in English. Martin's (2000) model is organized with a more overtly systemic-functional orientation around the concept of 'encoded feeling'. In applying both these models at different times, whilst recognizing their individual usefulness and complementarity, I found specific limitations that led me to work towards a synthesis of the two approaches. I also argue for the need to consider genre, media, and institutional aspects more explicitly when claiming intertextual and heteroglossic relations as the basis for inferred evaluations. A basic assertion made in this article is that the perceived Desirability of a process, person, circumstance, or thing is identical to its 'value'. But the Desirability of anything is a socially and thus historically conditioned attribution that requires significant amounts of institutional inculcation of other 'types' of value-appropriateness, importance, beauty, power, and so on. I therefore propose a method informed by critical discourse analysis (CDA) that sees evaluation as happening on at least four interdependent levels of abstraction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In recent decades a number of Australian artists and teacher/artists have given serious attention to the creation of performance forms and performance engagement models that respect children’s intelligence, engage with themes of relevance, avoid the cliche´s of children’s theatre whilst connecting both sincerely and playfully with current understandings of the way in which young children develop and engage with the world. Historically a majority of performing arts companies touring Australian schools or companies seeking schools to view a performance in a dedicated performance venue engage with their audiences in what can be called a ‘drop-in drop-out’ model. A six-month practice-led research project (The Tashi Project) which challenged the tenets of the ‘drop-in drop-out’ model has been recently undertaken by Sandra Gattenhof and Mark Radvan in conjunction with early childhood students from three Brisbane primary school classrooms who were positioned as co-researchers and co-artists. The children, researchers and performers worked in a complimentary relationship in both the artistic process and the development of product.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document outlines a framework that could be used by government agencies in assessing policy interventions aimed at achieving social outcomes from government construction contracts. The framework represents a rational interpretation of the information gathered during the multi-outcomes construction policies project. The multi-outcomes project focused on the costs and benefits of using public construction contracts to promote the achievement of training and employment and public art objectives. The origin of the policy framework in a cost-benefit appraisal of current policy interventions is evidenced by its emphasis on sensitivity to policy commitment and project circumstances (especially project size and scope).The quantitative and qualitative analysis conducted in the multi-outcomes project highlighted, first, that in the absence of strong industry commitment to policy objectives, policy interventions typically result in high levels of avoidance activity, substantial administrative costs and very few benefits. Thus, for policy action on, for example, training or local employment to be successful compliance issues must be adequately addressed. Currently it appears that pre-qualification schemes (similar to the Priority Access Scheme) and schemes that rely on measuring, for example, the training investments of contractors within particular projects do not achieve high levels of compliance and involve significant administrative costs. Thus, an alternative is suggested in the policy framework developed here: a levy on each public construction project – set as a proportion of the total project costs. Although a full evaluation of this policy alternative was beyond the scope of the multi-outcomes construction policies project, it appears to offer the potential to minimize the transaction costs on contractors whilst enabling the creation of a training agency dedicated to improving the supply of skilled construction labour. A recommendation is thus made that this policy alternative be fully researched and evaluated. As noted above, the outcomes of the multi-outcomes research project also highlighted the need for sensitivity to project circumstances in the development and implementation of polices for public construction projects. Ideally a policy framework would have the flexibility to respond to circumstances where contractors share a commitment to the policy objectives and are able to identify measurable social outcomes from the particular government projects they are involved in. This would involve a project-by-project negotiation of goals and performance measures. It is likely to only be practical for large, longer term projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report undertakes an exploratory analysis of Construction Innovation research projects in order to answer the question “What are the public policy implications of Construction Innovation research?”

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this document is to introduce non-specialists to the discipline and practice of public policy, particularly in relation to the construction sector in Australia. In order to do this, a brief overview of Australia’s government structure, and some of the main approaches to public policy analysis are outlined. Reference to construction related examples are provided to ensure issues discussed are relevant and understandable to construction professionals. Government is a significant player in the construction industry, and has multiple roles: adjudicator, regulator, constructor, purchaser and client of construction projects. Moreover there are many spheres of government that are typically engaged in construction projects at multiple stages. The machinery of government can be difficult to understand, even for long term public servants. Demystifying the processes within government can help to improve communication and therefore performance in the industry. A better understanding of how policy-making and government policies affect the construction industry will enhance communication and assist construction professionals and academics to understand and work with government. Additionally the document will provide an opportunity to demonstrate the relevance of policy analysis to inquiries of construction policies and regulation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Principal Topic The study of the origin and characteristics of venture ideas - or ''opportunities'' as they are often called - and their contextual fit are key research goals in entrepreneurship (Davidsson, 2004). We define venture idea as ''the core ideas of an entrepreneur about what to sell, how to sell, whom to sell and how an entrepreneur acquire or produce the product or service which he/she sells'' for the purpose of this study. When realized the venture idea becomes a ''business model''. Even though venture ideas are central to entrepreneurship yet its characteristics and their effect to the entrepreneurial process is mysterious. According to Schumpeter (1934) entrepreneurs could creatively destruct the existing market condition by introducing new product/service, new production methods, new markets, and new sources of supply and reorganization of industries. The introduction, development and use of new ideas are generally called as ''innovation'' (Damanpour & Wischnevsky, 2006) and ''newness'' is a property of innovation and is a relative term which means that the degree of unfamiliarity of venture idea either to a firm or to a market. However Schumpeter's (1934) discusses five different types of newness, indicating that type of newness is an important issue. More recently, Shane and Venkataraman (2000) called for research taking into consideration not only the variation of characteristics of individuals but also heterogeneity of venture ideas, Empirically, Samuelson (2001, 2004) investigated process differences between innovative venture ideas and imitative venture ideas. However, he used only a crude dichotomy regarding the venture idea newness. According to Davidsson, (2004) as entrepreneurs could introduce new economic activities ranging from pure imitation to being new to the entire world market, highlighting that newness is a matter of degree. Dahlqvist (2007) examined the venture idea newness and made and attempt at more refined assessment of the degree and type of newness of venture idea. Building on these predecessors our study refines the assessment of venture idea newness by measuring the degree of venture idea newness (new to the world, new to the market, substantially improved while not entirely new, and imitation) for four different types of newness (product/service, method of production, method of promotion, and customer/target market). We then related type and degree of newness to the pace of progress in nascent venturing process. We hypothesize that newness will slow down the business creation process. Shane & Venkataraman (2000) introduced entrepreneurship as the nexus of opportunities and individuals. In line with this some scholars has investigated the relationship between individuals and opportunities. For example Shane (2000) investigates the relatedness between individuals' prior knowledge and identification of opportunities. Shepherd & DeTinne (2005) identified that there is a positive relationship between potential financial reward and the identification of innovative venture ideas. Sarasvathy's 'Effectuation Theory'' assumes high degree of relatedness with founders' skills, knowledge and resources in the selection of venture ideas. However entrepreneurship literature is scant with analyses of how this relatedness affects to the progress of venturing process. Therefore, we assess the venture ideas' degree of relatedness to prior knowledge and resources, and relate these, too, to the pace of progress in nascent venturing process. We hypothesize that relatedness will increase the speed of business creation. Methodology For this study we will compare early findings from data collected through the Comprehensive Australian Study of Entrepreneurial Emergence (CAUSEE). CAUSEE is a longitudinal study whose primary objective is to uncover the factors that initiate, hinder and facilitate the process of emergence and development of new firms. Data were collected from a representative sample of some 30,000 households in Australia using random digit dialing (RDD) telephone survey interviews. Through the first round of data collection identified 600 entrepreneurs who are currently involved in the business start-up process. The unit of the analysis is the emerging venture, with the respondent acting as its spokesperson. The study methodology allows researchers to identify ventures in early stages of creation and to longitudinally follow their progression through data collection periods over time. Our measures of newness build on previous work by Dahlqvist (2007). Our adapted version was developed over two pre-tests with about 80 participants in each. The measures of relatedness were developed through the two rounds of pre-testing. The pace of progress in the venture creation process is assessed with the help of time-stamped gestation activities; a technique developed in the Panel Study of Entrepreneurial Dynamics (PSED). Results and Implications We hypothesized that venture idea newness slows down the venturing process whereas relatedness facilitates the venturing process. Results of 600 nascent entrepreneurs in Australia indicated that there is marginal support for the hypothesis that relatedness assists the gestation progress. Newness is significant but is the opposite sign to the hypothesized. The results give number of implications for researchers, business founders, consultants and policy makers in terms of better knowledge of the venture creation process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Wynne and Schaffer (2003) have highlighted both the strong growth of gambling activity in recent years, and the revenue streams this has generated for governments and communities. Gambling activities and the revenues derived from them have, unsurprisingly, therefore also been seen as a way in which to increase economic development in deprived areas (Jinkner-Lloyd, 1996). Consequently, according to Brown et al (2003), gambling is now a large taxation revenue earner for many western governments, at both federal and state levels, worldwide (for example UK, USA, Australia). In size and importance, the Australian gambling industry in particular has grown significantly over the last three decades, experiencing a fourfold increase in real gambling turnover. There are, however, also concerns expressed about gambling and Electronic Gaming in particular, as illustrated in economic, social and ethical terms in Oddo (1997). There are also spatial aspects to understanding these issues. Marshall’s (1998) study, for example, highlights that benefits from gambling are more likely to accrue at the macro as opposed to the local level, because of centralised tax gathering and spending of tax revenues, whilst localities may suffer from displacement of activities with higher multipliers than the institutions with EGMs that replace them. This also highlights a regional context of costs, where benefits accrue to the centre, but the costs accrue to the regions and localities, as simultaneously resources leave those communities through both the gambling activities themselves (in the form of revenue for the EGM owners), and the government (through taxes).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In light of the Productivity Commission's inquiry into Australia's consumer policy framework and administration, this article explores three assumptions that have underpinned our consumer protection framework to date: assumptions about the benefits of competition, self-regulation, and information. It argues that the benefits can be over-stated, and do not always reflect the reality of consumer experience. The article calls for the development of an overarching framework or principles document, with a more moderated approach to competition, self-regulation and information. While the Productivity Commission's draft report has admirably dealt with many of these issues, there is scope for the proposed objectives and recommendations in the final report to reflect more consistently the disparate impact of markets and competition on consumers, and the findings of behavioural economics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Capital works procurement and its regulatory policy environment within a country can be complex entities. For example, by virtue of Australia’s governmental division between the Commonwealth, states and local jurisdictions and the associated procurement networks and responsibilities at each level, the tendering process is often convoluted. There are four inter-related key themes identified in the literature in relation to procurement disharmony, including decentralisation, risk & risk mitigation, free trade & competition, and tendering costs. This paper defines and discusses these key areas of conflict that adversely impact upon the business environments of industry through a literature review, policy analysis and consultation with capital works procurement stakeholders. The aim of this national study is to identify policy differences between jurisdictions in Australia, and ascertain whether those differences are a barrier to productivity and innovation. This research forms an element of a broader investigation with an aim of developing efficient, effective and nationally harmonised procurement systems. Keywords: capital works, procurement policy reform Acknowledgement: The research described in this paper carried out by the Australian Cooperative Research Centre for Construction Innovation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction sector policy makers have the opportunity to create improvements and develop economic, social and environmental sustainability through supply chain economics. The idea of the supply chain concept to improve firm behaviour and industry performance is not new. However there has been limited application and little or no measurement to monitor successful implementation. Often purchasing policies have been developed with sound strategic procurement principles but even these have had limited penetration in to the processes and practices of infrastructure agencies. The research reported in this paper documents an action research study currently being undertaken in the Australian construction sector which aims to explore supply chain economic policy implementation for sectoral change by two government agencies. The theory which informs this study is the emerging area of construction supply chain economics. There are five stages to the project including; demand analysis, chain analysis, government agency organizational audit, supplier strategy and strategic alignment. The overall objective is towards the development of a Supplier Group Strategy Map for two public sector agencies. Two construction subsectors are examined in detail; construction and demolition waste and precast concrete. Both of these subsectors are critical to the economic and environmental sustainability performance of the construction sector and the community as a whole in the particular jurisdictions. The local and state government agencies who are at the core of the case studies rely individually on the performance of these sectors. The study is set within the context of a sound state purchasing policy that has however, had limited application by the two agencies. Partial results of the study are presented and early findings indicate that the standard risk versus expenditure procurement model does not capture the complexities of project, owner and government risk considerations. A new model is proposed in this paper, which incorporates the added dimension of time. The research results have numerous stakeholders; they will hold particular value for those interested in regional construction sector economics, government agencies who develop and implement policy and who have a large construction purchasing imprint and the players involved in the two subsectors. Even though this is a study in Australia it has widespread applicability as previous research indicates that procurement reform is of international significance and policy implementation is problematic.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Transit agencies across the world are increasingly shifting their fare collection mechanisms towards fully automated systems like the smart card. One of the objectives in implementing such a system is to reduce the boarding time per passenger and hence reduce the overall dwell time for the buses at the bus stops/bus rapid transit (BRT) stations. TransLink, the transit authority responsible for public transport management in South East Queensland, has introduced ‘GoCard’ technology using the Cubic platform for fare collection on its public transport system. In addition to this, three inner city BRT stations on South East Busway spine are operating as pre-paid platforms during evening peak time. This paper evaluates the effects of these multiple policy measures on operation of study busway station. The comparison between pre and post policy scenarios suggests that though boarding time per passenger has decreased, while the alighting time per passenger has increased slightly. However, there is a substantial reduction in operating efficiency was observed at the station.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The highway express freight transportation (HEFT) is a new transportation organization form separated from the common freight transportation with economic development and incessant adjustment of highway transportation structure in China. At present, the phenomenon of inadaptability still exists in the HEFT system of China, from foundation structure like highways, parking lots and stations to transportation equipments and transportation organizing. In order to develop the HEFT system more rationally and effectively, we should start with the structure of the system, conform the resources existing, and consummate the freight transport system. In due course, relevant policies and measures to supervise, lead and support are necessary and important. This paper analyzes the existing problems of HEFT system in our country, based on its characteristics, development situation and adaptability, and presents the policy and measures of promoting and leading the development of the HEFT system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Co-production and strategic partnerships may generate valuable learning opportunities for firms to access to the knowledge and expertise of their partners. Such sharing and transfer of knowledge has become an increasingly common way for organising corporate finance and resources. However, not all collaborations result in a net positive experience for both partners. It can be a zero-sum game in which the partner learning the fastest dominates the relationship. In some cases, failure to gain access to partner knowledge results in unequal benefits accruing from such alliances. By examining the Singapore film industry from a learning perspective and taking into account particular forms of alliances, the study contributes to our understanding of the potential benefit and challenges of coproduction as a strategy for development.