242 resultados para musculoskeletal risks


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Regulating Workplace Risks is a study of regulatory inspection of occupational health and safety (OHS) and its management in five countries – Australia, Canada (Québec), France, Sweden and the UK – during a time of major change. It examines the implications of the shift from specification to process based regulation, in which attention has been increasingly directed to the means of managing OHS more systematically at a time in which a major restructuring of work has occurred in response to the globalised economy. These changes provide both the context and material for a wider discussion of the nature of regulation and regulatory inspection and their role in protecting the health, safety and well-being of workers in advanced market economies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Our research examined how projects can draw together the fields of human resource management (HRM) and risk management (RM) to consider workforce-related risks on projects; particularly those with a large contingent workforce. It is argued that RM frameworks could be enhanced by a more comprehensive understanding of the specific potential non-technical “people risks” in projects. The study focussed on the Oil and Gas industry and undertook interviews with experts in the field. The findings are considered within the framework of key HRM areas; Management Practices, General Employment Practices, Staffing, HR Development, and Compensation and Benefits, along with Project Completion. Drawing together RM and HRM in a project environment, our research provides a unique opportunity to identify critical workforce-related risks. Such identification is the first step towards a more comprehensive approach to risk assessment and planning for mitigation of such risks in projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research aims to explore and identify political risks on a large infrastructure project in an exaggerated environment to ascertain whether sufficient objective information can be gathered by project managers to utilise risk modelling techniques. During the study, the author proposes a new definition of political risk; performs a detailed project study of the Neelum Jhelum Hydroelectric Project in Pakistan; implements a probabilistic model using the principle of decomposition and Bayes probabilistic theorem and answers the question: was it possible for project managers to obtain all the relevant objective data to implement a probabilistic model?

Relevância:

20.00% 20.00%

Publicador:

Resumo:

New public management (NPFM), with its hands-on, private sector-style performance measurement, output control, parsimonious use of resources, disaggreation of public sector units and greater competition in the public sector, has significantly affected charitable and nonprofit organisations delivering community services (Hood, 1991; Dunleavy, 1994; George & Wilding, 2002). The literature indicates that nonprofit organisations under NPM believe they are doing more for less: while administration is increasing, core costs are not being met; their dependence on government funding comes at the expense of other funding strategies; and there are concerns about proportionality and power asymmetries in the relationship (Kerr & Savelsberg, 2001; Powell & Dalton, 2011; Smith, 2002, p. 175; Morris, 1999, 2000a). Government agencies are under increased pressure to do more with less, demonstrate value for money, measure social outcomes, not merely outputs and minimise political risk (Grant, 2008; McGreogor-Lowndes, 2008). Government-community service organisation relationships are often viewed as 'uneasy alliances' characterised by the pressures that come with the parties' differing roles and expectations and the pressures that come with the parties' differing roles and expectations and the pressurs of funding and security (Productivity Commission, 2010, p. 308; McGregor-Lowndes, 2008, p. 45; Morris, 200a). Significant community services are now delivered to citizens through such relationships, often to the most disadvantaged in the community, and it is important for this to be achieved with equity, efficiently and effectively. On one level, the welfare state was seen as a 'risk management system' for the poor, with the state mitigating the risks of sickness, job loss and old age (Giddens, 1999) with the subsequent neoliberalist outlook shifting this risk back to households (Hacker, 2006). At the core of this risk shift are written contracts. Vincent-Jones (1999,2006) has mapped how NPM is characterised by the use of written contracts for all manner of relations; e.g., relgulation of dealings between government agencies, between individual citizens and the state, and the creation of quais-markets of service providers and infrastructure partners. We take this lens of contracts to examine where risk falls in relation to the outsourcing of community services. First we examine the concept of risk. We consider how risk might be managed and apportioned between governments and community serivce organisations (CSOs) in grant agreements, which are quasiy-market transactions at best. This is informed by insights from the law and economics literature. Then, standard grant agreements covering several years in two jurisdictions - Australia and the United Kingdom - are analysed, to establish the risk allocation between government and CSOs. This is placed in the context of the reform agenda in both jurisdictions. In Australia this context is th enonprofit reforms built around the creation of a national charities regulator, and red tape reduction. In the United Kingdom, the backdrop is the THird Way agenda with its compacts, succeed by Big Society in a climate of austerity. These 'case studies' inform a discussion about who is best placed to bear and manage the risks of community service provision on behalf of government. We conclude by identifying the lessons to be learned from our analysis and possible pathways for further scholarship.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose Musculoskeletal conditions can impair people’s ability to undertake physical activity as they age. The purpose of this qualitative study was to investigate perceived barriers and facilitators to undertaking physical activity reported by patients accessing ambulatory hospital clinics for musculoskeletal disorders. Patients and methods A questionnaire with open-ended items was administered to patients (n=217, 73.3% of 296 eligible) from three clinics providing ambulatory services for nonsurgical treatment of musculoskeletal disorders. The survey included questions to capture the clinical and demographic characteristics of the sample. It also comprised two open-ended questions requiring qualitative responses. The first asked the participant to describe factors that made physical activity more difficult, and the second asked which factors made it easier for them to be physically active. Participants’ responses to the two open-ended questions were read, coded, and thematically analyzed independently by two researchers, with a third researcher available to arbitrate any unresolved disagreement. Results The mean (standard deviation) age of participants was 53 (15) years; n=113 (52.1%) were male. A total of 112 (51.6%) participants reported having three or more health conditions; n=140 (64.5%) were classified as overweight or obese. Five overarching themes describing perceived barriers for undertaking physical activity were "health conditions", "time restrictions", "poor physical condition", "emotional, social, and psychological barriers", and "access to exercise opportunities". Perceived physical activity facilitators were also aligned under five themes, namely "improved health state", "social, emotional, and behavioral supports", "access to exercise environment", "opportunities for physical activities", and "time availability". Conclusion It was clear from the breadth of the data that meaningful supports and interventions must be multidimensional. They should have the capacity to address a variety of physical, functional, social, psychological, motivational, environmental, lifestyle, and other perceived barriers. It would appear that for such interventions to be effective, they should be flexible enough to address a variety of specific concerns.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper proposes a recommendation system that supports process participants in taking risk-informed decisions, with the goal of reducing risks that may arise during process execution. Risk reduction involves decreasing the likelihood and severity of a process fault from occurring. Given a business process exposed to risks, e.g. a financial process exposed to a risk of reputation loss, we enact this process and whenever a process participant needs to provide input to the process, e.g. by selecting the next task to execute or by filling out a form, we suggest to the participant the action to perform which minimizes the predicted process risk. Risks are predicted by traversing decision trees generated from the logs of past process executions, which consider process data, involved resources, task durations and other information elements like task frequencies. When applied in the context of multiple process instances running concurrently, a second technique is employed that uses integer linear programming to compute the optimal assignment of resources to tasks to be performed, in order to deal with the interplay between risks relative to different instances. The recommendation system has been implemented as a set of components on top of the YAWL BPM system and its effectiveness has been evaluated using a real-life scenario, in collaboration with risk analysts of a large insurance company. The results, based on a simulation of the real-life scenario and its comparison with the event data provided by the company, show that the process instances executed concurrently complete with significantly fewer faults and with lower fault severities, when the recommendations provided by our recommendation system are taken into account.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of camera traps in wildlife management is an increasingly common practice. A phenomenon which is also becoming more common is for such camera traps to unintentionally film individuals engaged in a variety of activities, ranging from the innocent to the nefarious and including lewd or potentially embarrassing behaviour. It is therefore possible for the use of camera traps to accidentally encroach upon the privacy rights of persons who venture into the area of surveillance. In this chapter we describe the legal framework of privacy in Australia and discuss the potential risk of this sleeping tiger for users of camera traps. We also present the results of a survey of camera trap users to assess the frequency of such unintended captures and the nature of activity being filmed before discussing the practical implications of these laws for camera traps users in this country and make recommendations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Also physical exercise in general is accepted to be protective, acute and strenuous exercise has been shown to induce oxidative stress. Enhanced formation of free radicals leads to oxidation of macromolecules and to DNA damage. On the other hand ultra-endurance events which require strenuous exercise are very popular and the number of participants is continuously increasing worldwide. Since only few data exists on Ironman triathletes, who are prototypes of ultra-endurance athletes, this study was aimed at assessing the risk of oxidative stress and DNA damage after finishing a triathlon and to predict a possible health risk. Blood samples of 42 male athletes were taken 2 days before, within 20 min after the race, 1, 5 and 19 days post-race. Oxidative stress marker increased only moderately after the race and returned to baseline after 5 days. Marker of DNA damage measured by the SCGE assay with and without restriction enzymes as well as by the sister chromatid exchange assay did either show no change or deceased within the first day after the race. Due to intake during the race and the release by the cells plasma concentrations of vitamin C and α-tocopherol increased after the event and returned to baseline 1 day after. This study indicates that despite a temporary increase in some oxidative stress markers, there is no persistent oxidative stress and no DNA damage in response to an Ironman triathlon in trained athletes, mainly due to an appropriate antioxidant intake and general protective alterations in the antioxidant defence system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: To establish whether there was a difference in health-related quality of life (HRQoL) in people with chronic musculoskeletal disorders (PwCMSKD) after participating in a multimodal physiotherapy program (MPP) either two or three sessions a week. Methods: Total of 114 PwCMSKD participated in this prospective randomised controlled trial. An individualised MPP, consisting of exercises for mobility, motor-control, muscle strengthening, cardiovascular training, and health education, was implemented either twice a week (G2: n = 58) or three times a week) (G3: n = 56) for 1 year. Outcomes: HRQoL physical and mental health state (PHS/MHS), Roland Morris disability Questionnaire (RMQ), Neck-Disability-Index (NDI) and Western Ontario and McMaster Universities’ Arthritis Index (WOMAC) were used to measure outcomes of MPP for people with chronic low back pain, chronic neck pain and osteoarthritis, respectively. Measures were taken at baseline, 8 weeks (8 w), 6 months (6 m), and 1 year (1 y) after starting the programme. Results: No statistically significant differences were found between the two groups (G2 and G3), except in NDI at 8 w (−3.34, (CI 95%: −6.94/0.84, p = 0.025 (scale 0–50)). All variables showed improvement reaching the following values (from baseline to 1 y) G2: PHS: 57.72 (baseline: 41.17; (improvement: 16.55%), MHS: 74.51 (baseline: 47.46, 27.05%), HRQoL 0.90 (baseline: 0.72, 18%)), HRQoL-VAS 84.29 (baseline: 58.04, 26.25%), RMQ 4.15 (baseline: 7.85, 15.42%), NDI 3.96 (baseline: 21.87, 35.82%), WOMAC 7.17 (baseline: 25.51, 19.10%). G3: PHS: 58.64 (baseline: 39.75, 18.89%), MHS: 75.50 (baseline: 45.45, (30.05%), HRQoL 0.67 (baseline: 0.88, 21%), HRQoL-VAS 86.91 (baseline: 52.64, 34.27%), RMQ 4.83 (baseline: 8.93, 17.08%), NDI 4.91 (baseline: 23.82, 37.82%), WOMAC 6.35 (baseline: 15.30, 9.32%). Conclusions: No significant differences between the two groups were found in the outcomes of a MPP except in the NDI at 8 weeks, but both groups improved in all variables during the course of 1 year under study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research contributes novel techniques for identifying and evaluating business process risks and analysing human resource behaviour. The developed techniques use predefined indicators to identify process risks in individual process instances, evaluate overall process risk, predict process outcomes and analyse human resource behaviour based on the analysis of information about process executions recorded in event logs by information systems. The results of this research can help managers to more accurately evaluate the risk exposure of their business processes, to more objectively evaluate the performance of their employees, and to identify opportunities for improvement of resource and process performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

From 2008-09 to 2012-13, the most prevalent worker compensation claim in the Queensland Ambulance Service (QAS) was musculoskeletal injuries at >80%. This is consistent with literature that shows Musculoskeletal Disorders (MSD) was one of the front runners for workplace injuries among many professions. In an attempt to reduce the injury rate and related claims, the QAS created a selection criterion for their workers based on the Health Related Fitness Test. This method intended to select workers based upon their fitness level, instead of selecting for their ability to perform the tasks or modify the tasks to better suit the workers. With injury rates remaining high, further research produced the Patient Handling Equipment Project Report, which provided the background for the Manual Handling Program Book. The Manual Handling Program Book however lacks in accurately addressing musculoskeletal hazards; actions which cause or avoid injury, correct posture and motion for patient movement, muscular biomechanics, static and dynamic workload including activities causing strain, and equipment use in relation to musculoskeletal hazards. The exploratory research aims to better understand the ambulance service’s perception of Manual Materials Handling (MMH), how it relates to musculoskeletal injuries and how the service has attempted to reduce its prevalence. Based on a literature review and a critical analysis of the QAS Health Related Fitness Test, QAS Patient Handling Equipment Project Report and the QAS Manual Handling Program Book, an understanding of their shortfalls in the prevention of musculoskeletal injuries was gained. This entails understanding the work tasks, workloads, strains and workflow of paramedics. This research creates a starting point for further research into musculoskeletal injuries in paramedics. This study specifically looks at hazards related to musculoskeletal disorders. It identifies work system deficiencies that contribute to the prevalence of musculoskeletal injuries, and possible interventions to avoid them in paramedics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

BACKGROUND: Coal mining is of significant economic importance to the Australian economy. Despite this fact, the related workforce is subjected to a number of psychosocial risks and musculoskeletal injury, and various psychological disorders are common among this population group. Because only limited research has been conducted in this population group, we sought to examine the relationship between physical (pain) and psychological (distress) factors, as well as the effects of various demographic, lifestyle, and fatigue indicators on this relationship. METHODS: Coal miners (N = 231) participated in a survey of musculoskeletal pain and distress on-site during their work shifts. Participants also provided demographic information (job type, age, experience in the industry, and body mass index) and responded to questions about exercise and sleep quality (on- and off-shift) as well as physical and mental tiredness after work. RESULTS: A total of 177 workers (80.5%) reported experiencing pain in at least one region of their body. The majority of the sample population (61.9%) was classified as having low-level distress, 28.4% had scores indicating mild to moderate distress, and 9.6% had scores indicating high levels of distress. Both number of pain regions and job type (being an operator) significantly predicted distress. Higher distress score was also associated with greater absenteeism in workers who reported lower back pain. In addition, perceived sleep quality during work periods partially mediated the relationship between pain and distress. CONCLUSION: The study findings support the existence of widespread musculoskeletal pain among the coal-mining workforce, and this pain is associated with increased psychological distress. Operators (truck drivers) and workers reporting poor sleep quality during work periods are most likely to report increased distress, which highlights the importance of supporting the mining workforce for sustained productivity.