727 resultados para critical infrastructure failure
Resumo:
Public-private partnerships (PPPs) are increasingly used to procure Australian infrastructure projects. As with all construction projects, the early briefing stages are often the most crucial in determining a successful outcome. There is, however, a lack of systematic research on the type and nature of the critical factors affecting the effectiveness and efficiency of PPP during this period. A literature review is presented of PPP usage in Australia, in which four main categories of factors (procurement, stakeholder, risk, and finance) are identified, each with several subfactors. A questionnaire survey involving state government stakeholders is also described, and a mathematical model that ranks the factors involved is developed. This is followed by an examination of the potential of the factors to help improve the PPP briefing stage for both public and private sectors.
Resumo:
Unlike most normal construction projects, post-disaster housing projects are diverse in nature, have unique socio-cultural and economical requirements, and are extremely dynamic and thus necessitate a meaningful and dynamic response. Post-disaster reconstruction practices that lack a strategy compatible with the severity of disaster, community culture, socio-economic requirements, environmental condition, government legislations, and technical and technological situations, often fail to operate and respond effectively to the needs of the wider affected population. Factors that frequently pose real threats to the eventual success of reconstruction projects are rarely given appropriate consideration when designing such projects. Research into past reconstruction practices has shown that ignoring these factors altogether or failing to give them meaningful consideration can affect housing reconstruction projects. In other words, they either miss their targets altogether or undergo serious modifications after their occupancy, subsequently resulting in an overall loss of project resources. This article touches upon the common factors that negatively impact the outcome of such projects.
Resumo:
While scientists continue to explore the level of climate change impact to new weather patterns and our environment in general, there have been some devastating natural disasters worldwide in the last two decades. Indeed natural disasters are becoming a major concern in our society. Yet in many previous examples, our reconstruction efforts only focused on providing short-term necessities. How to develop resilience in the long run is now a highlight for research and industry practice. This paper introduces a research project aimed at exploring the relationship between resilience building and sustainability in order to identify key factors during reconstruction efforts. From extensive literature study, the authors considered the inherent linkage between the two issues as evidenced from past research. They found that sustainability considerations can improve the level of resilience but are not currently given due attention. Reconstruction efforts need to focus on resilience factors but as part of urban development, they must also respond to the sustainability challenge. Sustainability issues in reconstruction projects need to be amplified, identified, processed, and managed properly. On-going research through empirical study aims to establish critical factors (CFs) for stakeholders in disaster prone areas to plan for and develop new building infrastructure through holistic considerations and balanced approaches to sustainability. A questionnaire survey examined a range of potential factors and the subsequent data analysis revealed six critical factors for sustainable Post Natural Disaster Reconstruction that include: considerable building materials and construction methods, good governance, multilateral coordination, appropriate land-use planning and policies, consideration of different social needs, and balanced combination of long-term and short-term needs. Findings from this study should have an influence on policy development towards Post Natural Disaster Reconstruction and help with the achievement of sustainable objectives.
Resumo:
Post–disaster reconstruction projects are often considered ineffectual or unproductive because on many occasions in the past they have performed extremely poorly during post-contract occupation, or have failed altogether to deliver acceptable outcomes. In some cases, these projects have already failed even before their completion, leading many sponsor aid organisations to hold these projects up as examples of how not to deliver housing reconstruction. Research into some previous unsuccessful projects has revealed that often the lack of adequate knowledge regarding the context and complexity involved in the implementation of these projects is generally responsible for their failure. Post-disaster reconstruction projects are certainly very complex in nature, often very context-specific and they can vary widely in magnitude. Despite such complexity, reconstruction projects can still have a high likelihood of success if adequate consideration is given to the importance of factors which are known to positively influence reconstruction efforts. Good outcomes can be achieved when planners and practitioners ensure best practices are embedded in the design of reconstruction projects at the time reconstruction projects they are first instigated. This paper outlines and discusses factors that significantly contribute to the successful delivery of post-disaster housing reconstruction projects.
Resumo:
Business transformations are complex organisational change endeavours that result in a business performing current work differently, or performing different work. Information Technology (IT) is a key enabler of such initiatives, but comes with its challenges, as revamping the IT infrastructure in large-scale organisations implies high complexity, high risk, and often high failure rates. We view business transformations as a collection of management services that are demanded and enacted at a program level, defined as abstract resources that provide the managerial capabilities necessary for business transformations. In this research-in-progress, we explore what triggers the need for management services in response to the challenges in business transformation management. We analyse data from two exploratory case studies using the critical incident technique as our qualitative analysis method. Early findings indicate that management service triggers reside on either the strategic level, which may be internally or externally driven, or at the program management level, which may be situational, influential or reactional. We detail implications for our on-going research.
Resumo:
An effective IT infrastructure can support a business vision and strategy; a poor, decentralized one can break a company. More and more companies are turning to off-the-shelf ERP (enterprise resource planning) solutions for IT planning and legacy systems management. The authors have developed a framework to help managers successfully plan and implement an ERP project
Resumo:
Modern trains with different axle configurations, speeds and loads are used in railway networks. As a result, one of the most important questions of the mangers involved in bridge managements systems (BMS) is how these changes affect the structural behavior of the critical components of the railway bridges. Although researchers have conducted, many investigations on the dynamic effects of the moving loads on bridges, the influence of the changes in the speed of the train on the demand by capacity ratios of the different critical components of the bridge have not yet been properly studied. This study is important, because different components with different capacities and roles for carrying loads in the structure may be affected differently. To investigate the above phenomenon in this research, a structural model of a simply supported bridge is developed. It will be verified that the dynamic behavior of this bridge is similar to a group of railway bridges in Australia. Demand by capacity ratios of the critical components of the bridge, when it is subjected to a train load with different speeds will be calculated. The results show that the effect of increase or decrease of speed should not be underestimated. The outcome is very significant as it is contrary to what is currently expected, i.e. by reducing the speed of the train, the demand by capacity ratio of components may increase and make the bridge unsafe for carrying live load.
Resumo:
The development of toll roads in Indonesia started around 1978. Initially, the management and development of toll roads sat directly under the Government of Indonesia (GoI) being undertaken through PT JasaMarga, a state owned enterprise specifically established to provide toll roads. Due to the slow growth and low capability of toll roads to fulfil infrastructure needs in the first ten years of operation (only 2.688kms/year), GoI changed its strategy in 1989 to one of using private sector participation for roads delivery through a Public Private Partnership (PPP) scheme. In this latter period, PT JasaMarga had two roles, both as regulator on behalf of the private sector as well as being the operator. However, from 1989 to 2004 the growth rate of toll roads actually decreased further to 2.300kms/year. Facing this challenge of low growth rate of toll roads, in 2004GoI changed the toll road management system and the role of regulator was returned to the Government through the establishment of the Toll Road Regulatory Agency (BPJT). GoI also amended the institutional framework to strengthen the toll road management system. Despite the introduction of this new institutional framework, the growth of toll roads still showed insignificant change. This problem in toll road development has generated an urgent need for research into this issue. The aim of the research is to understand the performance of the new institutional framework in enhancing PPP procured toll road development. The methodology of the research was to undertake a questionnaire survey distributed to private sector respondents involved in toll road development. The results of this study show that there are several problems inherent in the institutional framework, but the most significant problem comes from the uncertainty of the function of the strategic executive body in the land expropriation process.
Resumo:
Attention Deficit Hyperactivity Disorder (ADHD) has achieved celebrity status in many Western countries, yet despite considerable effort to prove its existence as a “real” disorder, ADHD still suffers from a crisis of legitimacy. Nonetheless, diagnosis and prescription of medication has grown at a phenomenal rate since the late 1980s, particularly in Western culture. Numerous accounts exist explaining how the ADHD diagnosis functions as a convenient administrative loophole, providing schools with a medical explanation for school failure, medication to sedate the “problem” into submission, or the means to eject children from mainstream classrooms. This book provides a more holistic interpretation of how to respond to children who might otherwise be diagnosed with and medicated for “ADHD”—a diagnosis which, whether scientifically valid or not, is unhelpful within the confine of the school. Training teachers to recognise and identify “ADHD symptoms” or to understand the functions of restricted pharmaceuticals will only serve to increase the number of children diagnosed and the sale of psychoactive medications. Research has shown that such activities will not help those children learn, nor will it empower their classroom teachers to take responsibility for teaching such children well. This book seeks to provide school practitioners with knowledge that is useful within the educational context to improve the educational experiences and outcomes for children who might otherwise receive a diagnosis of ADHD.
Resumo:
Highway infrastructure development typically requires major capital input. Unless planned properly, such requirements can cause serious financial constraints for investors. The push for sustainability adds a new dimension to the complexity of evaluating highway projects. Finding environmentally and socially responsible solutions for highway construction will improve its potential for acceptance by the society and in many instances the infrastructure's life span. Even so, the prediction and determination of a project's long-term financial viability can be a precarious exercise. Existing studies in this area have not indicated details of how to identify and deal with costs incurred in pursuing sustainability measures in highway infrastructure. This paper provides insights into the major challenges of implementing sustainability in highway project development in terms of financial concerns and obligations. It discusses the results from recent research through a literature study and a questionnaire survey of key industry stakeholders involved in highway infrastructure development. The research identified critical cost components relating to sustainability measures based on perspectives of industry stakeholders. All stakeholders believe sustainability related costs are an integral part of the decision making. However, the importance rating of these costs is relative to each stakeholder's core business objectives. This will influence the way these cost components are dealt with during the evaluation of highway investment alternatives and financial implications. This research encourages positive thinking among the highway infrastructure practitioners about sustainability. It calls for the construction industry to maximise sustainability deliverables while ensuring financial viability over the life cycle of highway infrastructure projects.
Resumo:
This paper presents a rigorous and a reliable analytical procedure using finite element (FE) techniques to study the blast response of laminated glass (LG) panel and predict the failure of its components. The 1st principal stress (σ11) is used as the failure criterion for glass and the von mises stress (σv) is used for the interlayer and sealant joints. The results from the FE analysis for mid-span deflection, energy absorption and the stresses at critical locations of glass, interlayer and structural sealant are presented in the paper. These results compared well with those obtained from a free field blast test reported in the literature. The tensile strength (T) of the glass has a significant influence on the behaviour of the LG panel and should be treated carefully in the analysis. The glass panes absorb about 80% of the blast energy for the treated blast load and this should be minimised in the design.
Resumo:
Railway Bridges deteriorate over time due to different critical factors including, flood, wind, earthquake, collision, and environment factors, such as corrosion, wear, termite attack, etc. In current practice, the contributions of the critical factors, towards the deterioration of railway bridges, which show their criticalities, are not appropriately taken into account. In this paper, a new method for quantifying the criticality of these factors will be introduced. The available knowledge as well as risk analyses conducted in different Australian standards and developed for bridge-design will be adopted. The analytic hierarchy process (AHP) is utilized for prioritising the factors. The method is used for synthetic rating of railway bridges developed by the authors of this paper. Enhancing the reliability of predicting the vulnerability of railway bridges to the critical factors, will be the significant achievement of this research.
Resumo:
Over the last decade advanced composite materials, like carbon fibre reinforced polymer (CFRP), have increasingly been used in civil engineering infrastructure. The benefits of advanced composites are rapidly becoming evident. This paper focuses on the comparative performance of steel and concrete members retrofitted by carbon fibre reinforced polymers. The objective of this work is a systematic assessment and evaluation of the performance of CFRP for both the concrete and steel members available in the technical literature. Existing empirical and analytical models were studied. Comparison is made with respect to failure mode, bond characteristics, fatigue behaviour, durability, corrosion, load carrying capacity and force transfer. It is concluded that empirical expressions for the concrete-CFRP composite are not readily suited for direct use in the steel-CFRP composite. This paper identifies some of the major issues that need further investigation.
Resumo:
This paper presents a strategy to predict the lifetime of rails subjected to large rolling contact loads that induce ratchetting strains in the rail head. A critical element concept is used to calculate the number of loading cycles needed for crack initiation to occur in the rail head surface. In this technique the finite element method (FEM) is used to determine the maximum equivalent ratchetting strain per load cycle, which is calculated by combining longitudinal and shear stains in the critical element. This technique builds on a previously developed critical plane concept that has been used to calculate the number of cycles to crack initiation in rolling contact fatigue under ratchetting failure conditions. The critical element concept simplifies the analytical difficulties of critical plane analysis. Finite element analysis (FEA) is used to identify the critical element in the mesh, and then the strain values of the critical element are used to calculate the ratchetting rate analytically. Finally, a ratchetting criterion is used to calculate the number of cycles to crack initiation from the ratchetting rate calculated.
Resumo:
The interaction between head contractor and subcontractor in modern construction often contributes to the degree of success or failure of any large-scale construction project. In this paper, previous research on the relationship and interaction between head contractor and subcontractor is examined in order to establish how these relationships will affect the overall performance of a project. Based on the review, research questions on how to best manage the interaction and relationship between these two vital project participants are proposed and future research direction discussed.