306 resultados para bubble train


Relevância:

10.00% 10.00%

Publicador:

Resumo:

As part of an ongoing research on the development of a longer life insulated rail joint (IRJ), this paper reports a field experiment and a simplified 2D numerical modelling for the purpose of investigating the behaviour of rail web in the vicinity of endpost in an insulated rail joint (IRJ) due to wheel passages. A simplified 2D plane stress finite element model is used to simulate the wheel-rail rolling contact impact at IRJ. This model is validated using data from a strain gauged IRJ that was installed in a heavy haul network; data in terms of the vertical and shear strains at specific positions of the IRJ during train passing were captured and compared with the results of the FE model. The comparison indicates a satisfactory agreement between the FE model and the field testing. Furthermore, it demonstrates that the experimental and numerical analyses reported in this paper provide a valuable datum for developing further insight into the behaviour of IRJ under wheel impacts.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There has been a worldwide trend to increase axle loads and train speeds. This means that railway track degradation will be accelerated, and track maintenance costs will be increased significantly. There is a need to investigate the consequences of increasing traffic load. The aim of the research is to develop a model for the analysis of physical degradation of railway tracks in response to changes in traffic parameters, especially increased axle loads and train speeds. This research has developed an integrated track degradation model (ITDM) by integrating several models into a comprehensive framework. Mechanistic relationships for track degradation hav~ ?een used wherever possible in each of the models contained in ITDM. This overcc:mes the deficiency of the traditional statistical track models which rely heavily on historical degradation data, which is generally not available in many railway systems. In addition statistical models lack the flexibility of incorporating future changes in traffic patterns or maintenance practices. The research starts with reviewing railway track related studies both in Australia and overseas to develop a comprehensive understanding of track performance under various traffic conditions. Existing railway related models are then examined for their suitability for track degradation analysis for Australian situations. The ITDM model is subsequently developed by modifying suitable existing models, and developing new models where necessary. The ITDM model contains four interrelated submodels for rails, sleepers, ballast and subgrade, and track modulus. The rail submodel is for rail wear analysis and is developed from a theoretical concept. The sleeper submodel is for timber sleepers damage prediction. The submodel is developed by modifying and extending an existing model developed elsewhere. The submodel has also incorporated an analysis for the likelihood of concrete sleeper cracking. The ballast and subgrade submodel is evolved from a concept developed in the USA. Substantial modifications and improvements have been made. The track modulus submodel is developed from a conceptual method. Corrections for more global track conditions have been made. The integration of these submodels into one comprehensive package has enabled the interaction between individual track components to be taken into account. This is done by calculating wheel load distribution with time and updating track conditions periodically in the process of track degradation simulation. A Windows-based computer program ~ssociated with ITDM has also been developed. The program enables the user to carry out analysis of degradation of individual track components and to investigate the inter relationships between these track components and their deterioration. The successful implementation of this research has provided essential information for prediction of increased maintenance as a consequence of railway trackdegradation. The model, having been presented at various conferences and seminars, has attracted wide interest. It is anticipated that the model will be put into practical use among Australian railways, enabling track maintenance planning to be optimized and potentially saving Australian railway systems millions of dollars in operating costs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Throughout the twentieth century increased interest in the training of actors resulted in the emergence of a plethora of acting theories and innovative theatrical movements in Europe, the UK and the USA. The individuals or groups involved with the formulation of these theories and movements developed specific terminologies, or languages of acting, in an attempt to clearly articulate the nature and the practice of acting according to their particular pedagogy or theatrical aesthetic. Now at the dawning of the twenty-first century, Australia boasts quite a number of schools and university courses professing to train actors. This research aims to discover the language used in actor training on the east coast of Australia today. Using interviews with staff of the National Institute of Dramatic Art, the Victorian College of the Arts, and the Queensland University of Technology as the primary source of data, a constructivist grounded theory has emerged to assess the influence of last century‟s theatrical theorists and practitioners on Australian training and to ascertain the possibility of a distinctly Australian language of acting.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This thesis is a problematisation of the teaching of art to young children. To problematise a domain of social endeavour, is, in Michel Foucault's terms, to ask how we come to believe that "something ... can and must be thought" (Foucault, 1985:7). The aim is to document what counts (i.e., what is sayable, thinkable, feelable) as proper art teaching in Queensland at this point ofhistorical time. In this sense, the thesis is a departure from more recognisable research on 'more effective' teaching, including critical studies of art teaching and early childhood teaching. It treats 'good teaching' as an effect of moral training made possible through disciplinary discourses organised around certain epistemic rules at a particular place and time. There are four key tasks accomplished within the thesis. The first is to describe an event which is not easily resolved by means of orthodox theories or explanations, either liberal-humanist or critical ones. The second is to indicate how poststructuralist understandings of the self and social practice enable fresh engagements with uneasy pedagogical moments. What follows this discussion is the documentation of an empirical investigation that was made into texts generated by early childhood teachers, artists and parents about what constitutes 'good practice' in art teaching. Twenty-two participants produced text to tell and re-tell the meaning of 'proper' art education, from different subject positions. Rather than attempting to capture 'typical' representations of art education in the early years, a pool of 'exemplary' teachers, artists and parents were chosen, using "purposeful sampling", and from this pool, three videos were filmed and later discussed by the audience of participants. The fourth aspect of the thesis involves developing a means of analysing these texts in such a way as to allow a 're-description' of the field of art teaching by attempting to foreground the epistemic rules through which such teacher-generated texts come to count as true ie, as propriety in art pedagogy. This analysis drew on Donna Haraway's (1995) understanding of 'ironic' categorisation to hold the tensions within the propositions inside the categories of analysis rather than setting these up as discursive oppositions. The analysis is therefore ironic in the sense that Richard Rorty (1989) understands the term to apply to social scientific research. Three 'ironic' categories were argued to inform the discursive construction of 'proper' art teaching. It is argued that a teacher should (a) Teach without teaching; (b) Manufacture the natural; and (c) Train for creativity. These ironic categories work to undo modernist assumptions about theory/practice gaps and finding a 'balance' between oppositional binary terms. They were produced through a discourse theoretical reading of the texts generated by the participants in the study, texts that these same individuals use as a means of discipline and self-training as they work to teach properly. In arguing the usefulness of such approaches to empirical data analysis, the thesis challenges early childhood research in arts education, in relation to its capacity to deal with ambiguity and to acknowledge contradiction in the work of teachers and in their explanations for what they do. It works as a challenge at a range of levels - at the level of theorising, of method and of analysis. In opening up thinking about normalised categories, and questioning traditional Western philosophy and the grand narratives of early childhood art pedagogy, it makes a space for re-thinking art pedagogy as "a game oftruth and error" (Foucault, 1985). In doing so, it opens up a space for thinking how art education might be otherwise.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Maintenance trains travel in convoy. In Australia, only the first train of the convoy pays attention to the track sig- nalization (the other convoy vehicles simply follow the preceding vehicle). Because of human errors, collisions can happen between the maintenance vehicles. Although an anti-collision system based on a laser distance meter is already in operation, the existing system has a limited range due to the curvature of the tracks. In this paper, we introduce an anti-collision system based on vision. The two main ideas are, (1) to warp the camera image into an image where the rails are parallel through a projective transform, and (2) to track the two rail curves simultaneously by evaluating small parallel segments. The performance of the system is demonstrated on an image dataset.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Objectives: This methodological paper reports on the development and validation of a work sampling instrument and data collection processes to conduct a national study of nurse practitioners’ work patterns. ---------- Design: Published work sampling instruments provided the basis for development and validation of a tool for use in a national study of nurse practitioner work activities across diverse contextual and clinical service models. Steps taken in the approach included design of a nurse practitioner-specific data collection tool and development of an innovative web-based program to train and establish inter rater reliability of a team of data collectors who were geographically dispersed across metropolitan, rural and remote health care settings. ---------- Setting: The study is part of a large funded study into nurse practitioner service. The Australian Nurse Practitioner Study is a national study phased over three years and was designed to provide essential information for Australian health service planners, regulators and consumer groups on the profile, process and outcome of nurse practitioner service. ---------- Results: The outcome if this phase of the study is empirically tested instruments, process and training materials for use in an international context by investigators interested in conducting a national study of nurse practitioner work practices. ---------- Conclusion: Development and preparation of a new approach to describing nurse practitioner practices using work sampling methods provides the groundwork for international collaboration in evaluation of nurse practitioner service.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Flinders University and Queensland University of Technology, biofuels research interests cover a broad range of activities. Both institutions are seeking to overcome the twin evils of "peak oil" (Hubbert 1949 & 1956) and "global warming" (IPPC 2007, Stern 2006, Alison 2010), through development of Generation 1, 2 and 3 (Gen-1, 2 & 3) biofuels (Clarke 2008, Clarke 2010). This includes development of parallel Chemical Biorefinery, value-added, co-product chemical technologies, which can underpin the commercial viability of the biofuel industry. Whilst there is a focused effort to develop Gen-2 & 3 biofuels, thus avoiding the socially unacceptable use of food based Gen-1 biofuels, it must also be recognized that as yet, no country in the world has produced sustainable Gen-2 & 3 biofuel on a commercial basis. For example, in 2008 the United States used 38 billion litres (3.5% of total fuel use) of Gen-1 biofuel; in 2009/2010 this will be 47.5 billion litres (4.5% of fuel use) and in 2018 this has been estimated to rise to 96 billion litres (9% of total US fuel use). Brazil in 2008 produced 24.5 billion litres of ethanol, representing 37.3% of the world’s ethanol use for fuel and Europe, in 2008, produced 11.7 billion litres of biofuel (primarily as biodiesel). Compare this to Australia’s miserly biofuel production in 2008/2009 of 180 million litres of ethanol and 75 million litres of biodiesel, which is 0.4% of our fuel consumption! (Clarke, Graiver and Habibie 2010) To assist in the development of better biofuels technologies in the Asian developing regions the Australian Government recently awarded the Materials & BioEnergy Group from Flinders University, in partnership with the Queensland University of Technology, an Australian Leadership Award (ALA) Biofuel Fellowship program to train scientists from Indonesia and India about all facets of advanced biofuel technology.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In open railway access markets, a train service provider (TSP) negotiates with an infrastructure provider (IP) for track access rights. This negotiation has been modeled by a multi-agent system (MAS) in which the IP and TSP are represented by separate software agents. One task of the IP agent is to generate feasible (and preferably optimal) track access rights, subject to the constraints submitted by the TSP agent. This paper formulates an IP-TSP transaction and proposes a branch-and-bound algorithm for the IP agent to identify the optimal track access rights. Empirical simulation results show that the model is able to emulate rational agent behaviors. The simulation results also show good consistency between timetables attained from the proposed methods and those derived by the scheduling principles adopted in practice.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Dwell times at stations and inter-station run times are the two major operational parameters to maintain train schedule in railway service. Current practices on dwell-time and run-time control are that they are only optimal with respect to certain nominal traffic conditions, but not necessarily the current service demand. The advantages of dwell-time and run-time control on trains are therefore not fully considered. The application of a dynamic programming approach, with the aid of an event-based model, to devise an optimal set of dwell times and run times for trains under given operational constraints over a regional level is presented. Since train operation is interactive and of multi-attributes, dwell-time and run-time coordination among trains is a multi-dimensional problem. The computational demand on devising trains' instructions, a prime concern in real-time applications, is excessively high. To properly reduce the computational demand in the provision of appropriate dwell times and run times for trains, a DC railway line is divided into a number of regions and each region is controlled by a dwell- time and run-time controller. The performance and feasibility of the controller in formulating the dwell-time and run-time solutions for real-time applications are demonstrated through simulations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

With daily commercial and social activity in cities, regulation of train service in mass rapid transit railways is necessary to maintain service and passenger flow. Dwell-time adjustment at stations is one commonly used approach to regulation of train service, but its control space is very limited. Coasting control is a viable means of meeting the specific run-time in an inter-station run. The current practice is to start coasting at a fixed distance from the departed station. Hence, it is only optimal with respect to a nominal operational condition of the train schedule, but not the current service demand. The advantage of coasting can only be fully secured when coasting points are determined in real-time. However, identifying the necessary starting point(s) for coasting under the constraints of current service conditions is no simple task as train movement is governed by a large number of factors. The feasibility and performance of classical and heuristic searching measures in locating coasting point(s) is studied with the aid of a single train simulator, according to specified inter-station run times.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In an open railway access market, the Infrastructure Provider (IP), upon the receipts of service bids from the Train Service Providers (TSPs), assigns track access rights according to its own business objectives and the merits of the bids; and produces the train service timetable through negotiations. In practice, IP chooses to negotiate with the TSPs one by one in such a sequence that IP optimizes its objectives. The TSP bids are usually very complicated, containing a large number of parameters in different natures. It is a difficult task even for an expert to give a priority sequence for negotiations from the contents of the bids. This study proposes the application of fuzzy ranking method to compare and prioritize the TSP bids in order to produce a negotiation sequence. The results of this study allow investigations on the behaviors of the stakeholders in bid preparation and negotiation, as well as evaluation of service quality in the open railway market.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In an open railway access market, the provisions of railway infrastructures and train services are separated and independent. Negotiations between the track owner and train service providers are thus required for the allocation of the track capacity and the formulation of the services timetables, in which each party, i.e. a stakeholder, exhibits intelligence from the previous negotiation experience to obtain the favourable terms and conditions for the track access. In order to analyse the realistic interacting behaviour among the stakeholders in the open railway access market schedule negotiations, intelligent learning capability should be included in the behaviour modelling. This paper presents a reinforcement learning approach on modelling the intelligent negotiation behaviour. The effectiveness of incorporating learning capability in the stakeholder negotiation behaviour is then demonstrated through simulation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Considerable past research has explored relationships between vehicle accidents and geometric design and operation of road sections, but relatively little research has examined factors that contribute to accidents at railway-highway crossings. Between 1998 and 2002 in Korea, about 95% of railway accidents occurred at highway-rail grade crossings, resulting in 402 accidents, of which about 20% resulted in fatalities. These statistics suggest that efforts to reduce crashes at these locations may significantly reduce crash costs. The objective of this paper is to examine factors associated with railroad crossing crashes. Various statistical models are used to examine the relationships between crossing accidents and features of crossings. The paper also compares accident models developed in the United States and the safety effects of crossing elements obtained using Korea data. Crashes were observed to increase with total traffic volume and average daily train volumes. The proximity of crossings to commercial areas and the distance of the train detector from crossings are associated with larger numbers of accidents, as is the time duration between the activation of warning signals and gates. The unique contributions of the paper are the application of the gamma probability model to deal with underdispersion and the insights obtained regarding railroad crossing related vehicle crashes. Considerable past research has explored relationships between vehicle accidents and geometric design and operation of road sections, but relatively little research has examined factors that contribute to accidents at railway-highway crossings. Between 1998 and 2002 in Korea, about 95% of railway accidents occurred at highway-rail grade crossings, resulting in 402 accidents, of which about 20% resulted in fatalities. These statistics suggest that efforts to reduce crashes at these locations may significantly reduce crash costs. The objective of this paper is to examine factors associated with railroad crossing crashes. Various statistical models are used to examine the relationships between crossing accidents and features of crossings. The paper also compares accident models developed in the United States and the safety effects of crossing elements obtained using Korea data. Crashes were observed to increase with total traffic volume and average daily train volumes. The proximity of crossings to commercial areas and the distance of the train detector from crossings are associated with larger numbers of accidents, as is the time duration between the activation of warning signals and gates. The unique contributions of the paper are the application of the gamma probability model to deal with underdispersion and the insights obtained regarding railroad crossing related vehicle crashes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Open access reforms to railway regulations allow multiple train operators to provide rail services on a common infrastructure. As railway operations are now independently managed by different stakeholders, conflicts in operations may arise, and there have been attempts to derive an effective access charge regime so that these conflicts may be resolved. One approach is by direct negotiation between the infrastructure manager and the train service providers. Despite the substantial literature on the topic, few consider the benefits of employing computer simulation as an evaluation tool for railway operational activities such as access pricing. This article proposes a multi-agent system (MAS) framework for the railway open market and demonstrates its feasibility by modelling the negotiation between an infrastructure provider and a train service operator. Empirical results show that the model is capable of resolving operational conflicts according to market demand.