784 resultados para Technical-scientificinformational environment


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent and current socio-cultural trends are significant factors impacting on how business is conduced and correspondingly, on how work environments are designed. New communication technology is helping to break physical boundaries and change the way and speed of conducting business. One of the main characteristics of these new workplaces is non-permanency wherein the individual employee has no dedicated personally assigned office, work station, or desk. In this non-territorial, nomadic situation, employees undertake their work tasks in a wide variety of work settings inside and outside the office building. Such environments are understood to be must suitable where there is the need for high interaction with others as well as a high level of concentrated, independent work. This thesis reports on a project designed to develop a deeper understanding of the relationships between people (P) and their built environment (E) in the context of everyday work practice in a nomadic and non-territorial work environment. To achieve this, the study focuses on the experiences of employees as they understand them in relation to their work and the designed/ physical work environment. In this sense, the study is qualitative and grounded in nature. It does not assume any previously established theory nor test any presenting hypothesis. Instead it interviews the participants about their situations at work in their workplace, interprets natural interaction and creates a foundation for the development of theory informing workplace design, particularly theory that recognises the human nature of work and the need, as highlighted by several seminal researchers, for a greater understanding of how people manage and adapt in dynamic work environments.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents research findings about the use of remote desktop applications to teach music sequencing software. It highlights the successes, shortcomings and interactive issues encountered during a pilot project with a theoretical focus on a specific interactive bottleneck. The paper proposes a new delivery and partnership model to widen this bottleneck, which currently hinders interactions between the technical support, education and professional development communities in music technology.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis reports the outcomes of an investigation into students’ experience of Problem-based learning (PBL) in virtual space. PBL is increasingly being used in many fields including engineering education. At the same time many engineering education providers are turning to online distance education. Unfortunately there is a dearth of research into what constitutes an effective learning experience for adult learners who undertake PBL instruction through online distance education. Research was therefore focussed on discovering the qualitatively different ways that students experience PBL in virtual space. Data was collected in an electronic environment from a course, which adopted the PBL strategy and was delivered entirely in virtual space. Students in this course were asked to respond to open-ended questions designed to elicit their learning experience in the course. Data was analysed using the phenomenographical approach. This interpretative research method concentrated on mapping the qualitative differences in students’ interpretations of their experience in the course. Five qualitatively different ways of experiencing were discovered: Conception 1: ‘A necessary evil for program progression’; Conception 2: ‘Developing skills to understand, evaluate, and solve technical Engineering and Surveying problems’; Conception 3: ‘Developing skills to work effectively in teams in virtual space’; Conception 4: ‘A unique approach to learning how to learn’; Conception 5: ‘Enhancing personal growth’. Each conception reveals variation in how students attend to learning by PBL in virtual space. Results indicate that the design of students’ online learning experience was responsible for making students aware of deeper ways of experiencing PBL in virtual space. Results also suggest that the quality and quantity of interaction with the team facilitator may have a significant impact on the student experience in virtual PBL courses. The outcomes imply pedagogical strategies can be devised for shifting students’ focus as they engage in the virtual PBL experience to effectively manage the student learning experience and thereby ensure that they gain maximum benefit. The results from this research hold important ramifications for graduates with respect to their ease of transition into professional work as well as their later professional competence in terms of problem solving, ability to transfer basic knowledge to real-life engineering scenarios, ability to adapt to changes and apply knowledge in unusual situations, ability to think critically and creatively, and a commitment to continuous life-long learning and self-improvement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In architecture courses, instilling a wider understanding of the industry specific representations practiced in the Building Industry is normally done under the auspices of Technology and Science subjects. Traditionally, building industry professionals communicated their design intentions using industry specific representations. Originally these mainly two dimensional representations such as plans, sections, elevations, schedules, etc. were produced manually, using a drawing board. Currently, this manual process has been digitised in the form of Computer Aided Design and Drafting (CADD) or ubiquitously simply CAD. While CAD has significant productivity and accuracy advantages over the earlier manual method, it still only produces industry specific representations of the design intent. Essentially, CAD is a digital version of the drawing board. The tool used for the production of these representations in industry is still mainly CAD. This is also the approach taken in most traditional university courses and mirrors the reality of the situation in the building industry. A successor to CAD, in the form of Building Information Modelling (BIM), is presently evolving in the Construction Industry. CAD is mostly a technical tool that conforms to existing industry practices. BIM on the other hand is revolutionary both as a technical tool and as an industry practice. Rather than producing representations of design intent, BIM produces an exact Virtual Prototype of any building that in an ideal situation is centrally stored and freely exchanged between the project team. Essentially, BIM builds any building twice: once in the virtual world, where any faults are resolved, and finally, in the real world. There is, however, no established model for learning through the use of this technology in Architecture courses. Queensland University of Technology (QUT), a tertiary institution that maintains close links with industry, recognises the importance of equipping their graduates with skills that are relevant to industry. BIM skills are currently in increasing demand throughout the construction industry through the evolution of construction industry practices. As such, during the second half of 2008, QUT 4th year architectural students were formally introduced for the first time to BIM, as both a technology and as an industry practice. This paper will outline the teaching team’s experiences and methodologies in offering a BIM unit (Architectural Technology and Science IV) at QUT for the first time and provide a description of the learning model. The paper will present the results of a survey on the learners’ perspectives of both BIM and their learning experiences as they learn about and through this technology.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Digital Songlines (DSL) is an Australasian CRC for Interaction Design (ACID) project that is developing protocols, methodologies and toolkits to facilitate the collection, education and sharing of indigenous cultural heritage knowledge. This paper outlines the goals achieved over the last three years in the development of the Digital Songlines game engine (DSE) toolkit that is used for Australian Indigenous storytelling. The project explores the sharing of indigenous Australian Aboriginal storytelling in a sensitive manner using a game engine. The use of the game engine in the field of Cultural Heritage is expanding. They are an important tool for the recording and re-presentation of historically, culturally, and sociologically significant places, infrastructure, and artefacts, as well as the stories that are associated with them. The DSL implementation of a game engine to share storytelling provides an educational interface. Where the DSL implementation of a game engine in a CH application differs from others is in the nature of the game environment itself. It is modelled on the 'country' (the 'place' of their heritage which is so important to the clients' collective identity) and authentic fauna and flora that provides a highly contextualised setting for the stories to be told. This paper provides an overview on the development of the DSL game engine.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Engineering graduates of today, face a working environment that assumes global mobility in the labour market. This challenge means, amongst universities worldwide, a demand to increase the globalisation of educational programs, context, and increase and support the mobility of students through mechanisms such as student exchange and double masters degrees. Engineering student mobility from Australia is low with only a few Engineering Faculties encouraging students to go internationally. This comparative study, using universities in Australia and Europe, of feedback from students who have been on exchange or proposing to go on exchange, employers and faculty addresses the motivators and barriers to student mobility and exchange from the perspectives of the university, faculty, students and employers. Recommendations will be presented on how student mobility and exchange can be improved, and mechanisms such as double Masters Degrees, dual accreditation and Erasmus Mundus 2009 – 2013 can be utilised to improve student mobility.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

“SOH see significant benefit in digitising its drawings and operation and maintenance manuals. Since SOH do not currently have digital models of the Opera House structure or other components, there is an opportunity for this national case study to promote the application of Digital Facility Modelling using standardized Building Information Models (BIM)”. The digital modelling element of this project examined the potential of building information models for Facility Management focusing on the following areas: • The re-usability of building information for FM purposes • BIM as an Integrated information model for facility management • Extendibility of the BIM to cope with business specific requirements • Commercial facility management software using standardised building information models • The ability to add (organisation specific) intelligence to the model • A roadmap for SOH to adopt BIM for FM The project has established that BIM – building information modelling - is an appropriate and potentially beneficial technology for the storage of integrated building, maintenance and management data for SOH. Based on the attributes of a BIM, several advantages can be envisioned: consistency in the data, intelligence in the model, multiple representations, source of information for intelligent programs and intelligent queries. The IFC – open building exchange standard – specification provides comprehensive support for asset and facility management functions, and offers new management, collaboration and procurement relationships based on sharing of intelligent building data. The major advantages of using an open standard are: information can be read and manipulated by any compliant software, reduced user “lock in” to proprietary solutions, third party software can be the “best of breed” to suit the process and scope at hand, standardised BIM solutions consider the wider implications of information exchange outside the scope of any particular vendor, information can be archived as ASCII files for archival purposes, and data quality can be enhanced as the now single source of users’ information has improved accuracy, correctness, currency, completeness and relevance. SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. There have been remarkably few technical difficulties in converting the House’s existing conventions and standards to the new model based environment. This demonstrates that the IFC model represents world practice for building data representation and management (see Sydney Opera House – FM Exemplar Project Report Number 2005-001-C-3, Open Specification for BIM: Sydney Opera House Case Study). Availability of FM applications based on BIM is in its infancy but focussed systems are already in operation internationally and show excellent prospects for implementation systems at SOH. In addition to the generic benefits of standardised BIM described above, the following FM specific advantages can be expected from this new integrated facilities management environment: faster and more effective processes, controlled whole life costs and environmental data, better customer service, common operational picture for current and strategic planning, visual decision-making and a total ownership cost model. Tests with partial BIM data – provided by several of SOH’s current consultants – show that the creation of a SOH complete model is realistic, but subject to resolution of compliance and detailed functional support by participating software applications. The showcase has demonstrated successfully that IFC based exchange is possible with several common BIM based applications through the creation of a new partial model of the building. Data exchanged has been geometrically accurate (the SOH building structure represents some of the most complex building elements) and supports rich information describing the types of objects, with their properties and relationships.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The relationships between teacher praise and feedback, and students’ perceptions of the classroom environment were investigated in six rural elementary schools (n 5 747). The Teacher Feedback Scale and My Classroom Scale were developed as part of this study and used to collect the data. Structural equation modelling was used to test a hypothesised model. The results indicated that negative teacher feedback and effort feedback were both related to students’ relationships with their teachers, while ability feedback was associated with perceptions of the classroom environment. Praise was not related to classroom environment or teacher–student relationships. Significant age and gender differences were found. Additionally, differences were found between students who were satisfied with their classroom and those who were dissatisfied. Satisfied students received more general praise, general ability feedback, effort feedback and less negative teacher feedback when compared to dissatisfied students. Research studies have emphasised the influence of signicicant adults (teachers and parents) on students’ personal development (Porlier et al., 1999) and the importance of significant others’ verbal statements when directed at children (Burnett, 1996a). The relationships between negative and positive statements made by teachers, parents, peers and siblings and children’s self-talk have been investigated (Burnett, 1996a) and positive statements (praise) have been found to be more beneficial than verbal criticism (Burnett, 1999). The quality of life in the classroom in recent times has been considered of great importance to students (Thorp et al., 1994) and this is recognised by Baker (1999) who reported a relationship between students’ satisfaction with the learning environment, and differential teacher feedback and praise. This study investigated the relationships between teacher praise and feedback, and how students perceived their classroom and their relationship with their teacher.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document provides the findings of an international review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different countries and international organisations. Road assets are powerful drivers of economic development and social equity. They also have significant impacts on the natural and man-made environment. The traditional definition of asset management is “A systematic process of maintaining, upgrading and operating physical assets cost effectively. It combines engineering principles with sound business practices and economic theory and it provides tools to facilitate a more organised, logical approach to decision-making” (US Dept. of Transportation, 1999). In recent years, the concept has been broadened to cover the complexity of decision making, based on a wider variety of policy considerations as well as social and environmental issues rather than is covered by Benefit-Cost analysis and pure technical considerations. Current international practices are summarised in table 2. It was evident that Engineering-economic analysis methods are well advanced to support decision-making. A range of tools available supports performance predicting of road assets and associated cost/benefit in technical context. The need for considering triple plus one bottom line of social, environmental and economic as well as political factors in decision-making is well understood by road agencies around the world. The techniques used to incorporate these however, are limited. Most countries adopt a scoring method, a goal achievement matrix or information collected from surveys. The greater uncertainty associated with these non-quantitative factors has generally not been taken into consideration. There is a gap between the capacities of the decision-making support systems and the requirements from decision-makers to make more rational and transparent decisions. The challenges faced in developing an integrated decision making framework are both procedural and conceptual. In operational terms, the framework should be easy to be understood and employed. In philosophical terms, the framework should be able to deal with challenging issues, such as uncertainty, time frame, network effects, model changes, while integrating cost and non-cost values into the evaluation. The choice of evaluation techniques depends on the feature of the problem at hand, on the aims of the analysis, and on the underlying information base At different management levels, the complexity in considering social, environmental, economic and political factor in decision-making is different. At higher the strategic planning level, more non-cost factors are involved. The complexity also varies based on the scope of the investment proposals. Road agencies traditionally place less emphasis on evaluation of maintenance works. In some cases, social equity, safety, environmental issues have been used in maintenance project selection. However, there is not a common base for the applications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The following technical report describes the approach and algorithm used to detect marine mammals from aerial imagery taken from manned/unmanned platform. The aim is to automate the process of counting the population of dugongs and other mammals. We have developed and algorithm that automatically presents to a user a number of possible candidates of these mammals. We tested the algorithm in two distinct datasets taken from different altitudes. Analysis and discussion is presented in regards with the complexity of the input datasets, the detection performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Deficiencies in the design and operation of office buildings can give rise to high social, environmental and economic (triple bottom line) costs. As a result, there are significant pressures and incentives to develop ‘smart building’ technologies that can facilitate improved indoor environment quality (IEQ), and more energy efficient operation of office buildings. IEQ indicators include lighting, ventilation, thermal comfort, indoor air quality and noise. In response to this, the CRC for Construction Innovation commissioned a six-month scoping study (Project no. 2002-043) to examine how different technologies could be used to improve the ‘triple bottom line’ for office buildings. The study was supported by three industry partners, Bovis Lend Lease, Arup, and The Queensland Department of Public Works. The objective of the study was to look at the history, trends, drivers, new technologies and potential application areas related to the operation of healthy and efficient office buildings. The key output from the study was a recommendation for a prototype system for intelligent monitoring and control of an office environment, based on identified market, technical and user requirements and constraints.

Relevância:

20.00% 20.00%

Publicador: