713 resultados para Second Building
Resumo:
Although internet chat is a significant aspect of many internet users’ lives, the manner in which participants in quasi-synchronous chat situations orient to issues of social and moral order remains to be studied in depth. The research presented here is therefore at the forefront of a continually developing area of study. This work contributes new insights into how members construct and make accountable the social and moral orders of an adult-oriented Internet Relay Chat (IRC) channel by addressing three questions: (1) What conversational resources do participants use in addressing matters of social and moral order? (2) How are these conversational resources deployed within IRC interaction? and (3) What interactional work is locally accomplished through use of these resources? A survey of the literature reveals considerable research in the field of computer-mediated communication, exploring both asynchronous and quasi-synchronous discussion forums. The research discussed represents a range of communication interests including group and collaborative interaction, the linguistic construction of social identity, and the linguistic features of online interaction. It is suggested that the present research differs from previous studies in three ways: (1) it focuses on the interaction itself, rather than the ways in which the medium affects the interaction; (2) it offers turn-by-turn analysis of interaction in situ; and (3) it discusses membership categories only insofar as they are shown to be relevant by participants through their talk. Through consideration of the literature, the present study is firmly situated within the broader computer-mediated communication field. Ethnomethodology, conversation analysis and membership categorization analysis were adopted as appropriate methodological approaches to explore the research focus on interaction in situ, and in particular to investigate the ways in which participants negotiate and co-construct social and moral orders in the course of their interaction. IRC logs collected from one chat room were analysed using a two-pass method, based on a modification of the approaches proposed by Pomerantz and Fehr (1997) and ten Have (1999). From this detailed examination of the data corpus three interaction topics are identified by means of which participants clearly orient to issues of social and moral order: challenges to rule violations, ‘trolling’ for cybersex, and experiences regarding the 9/11 attacks. Instances of these interactional topics are subjected to fine-grained analysis, to demonstrate the ways in which participants draw upon various interactional resources in their negotiation and construction of channel social and moral orders. While these analytical topics stand alone in individual focus, together they illustrate different instances in which participants’ talk serves to negotiate social and moral orders or collaboratively construct new orders. Building on the work of Vallis (2001), Chapter 5 illustrates three ways that rule violation is initiated as a channel discussion topic: (1) through a visible violation in open channel, (2) through an official warning or sanction by a channel operator regarding the violation, and (3) through a complaint or announcement of a rule violation by a non-channel operator participant. Once the topic has been initiated, it is shown to become available as a topic for others, including the perceived violator. The fine-grained analysis of challenges to rule violations ultimately demonstrates that channel participants orient to the rules as a resource in developing categorizations of both the rule violation and violator. These categorizations are contextual in that they are locally based and understood within specific contexts and practices. Thus, it is shown that compliance with rules and an orientation to rule violations as inappropriate within the social and moral orders of the channel serves two purposes: (1) to orient the speaker as a group member, and (2) to reinforce the social and moral orders of the group. Chapter 6 explores a particular type of rule violation, solicitations for ‘cybersex’ known in IRC parlance as ‘trolling’. In responding to trolling violations participants are demonstrated to use affiliative and aggressive humour, in particular irony, sarcasm and insults. These conversational resources perform solidarity building within the group, positioning non-Troll respondents as compliant group members. This solidarity work is shown to have three outcomes: (1) consensus building, (2) collaborative construction of group membership, and (3) the continued construction and negotiation of existing social and moral orders. Chapter 7, the final data analysis chapter, offers insight into how participants, in discussing the events of 9/11 on the actual day, collaboratively constructed new social and moral orders, while orienting to issues of appropriate and reasonable emotional responses. This analysis demonstrates how participants go about ‘doing being ordinary’ (Sacks, 1992b) in formulating their ‘first thoughts’ (Jefferson, 2004). Through sharing their initial impressions of the event, participants perform support work within the interaction, in essence working to normalize both the event and their initial misinterpretation of it. Normalising as a support work mechanism is also shown in relation to participants constructing the ‘quiet’ following the event as unusual. Normalising is accomplished by reference to the indexical ‘it’ and location formulations, which participants use both to negotiate who can claim to experience the ‘unnatural quiet’ and to identify the extent of the quiet. Through their talk participants upgrade the quiet from something legitimately experienced by one person in a particular place to something that could be experienced ‘anywhere’, moving the phenomenon from local to global provenance. With its methodological design and detailed analysis and findings, this research contributes to existing knowledge in four ways. First, it shows how rules are used by participants as a resource in negotiating and constructing social and moral orders. Second, it demonstrates that irony, sarcasm and insults are three devices of humour which can be used to perform solidarity work and reinforce existing social and moral orders. Third, it demonstrates how new social and moral orders are collaboratively constructed in relation to extraordinary events, which serve to frame the event and evoke reasonable responses for participants. And last, the detailed analysis and findings further support the use of conversation analysis and membership categorization as valuable methods for approaching quasi-synchronous computer-mediated communication.
Resumo:
The construction industry has adapted information technology in its processes in terms of computer aided design and drafting, construction documentation and maintenance. The data generated within the construction industry has become increasingly overwhelming. Data mining is a sophisticated data search capability that uses classification algorithms to discover patterns and correlations within a large volume of data. This paper presents the selection and application of data mining techniques on maintenance data of buildings. The results of applying such techniques and potential benefits of utilising their results to identify useful patterns of knowledge and correlations to support decision making of improving the management of building life cycle are presented and discussed.
Resumo:
The building life cycle process is complex and prone to fragmentation as it moves through its various stages. The number of participants, and the diversity, specialisation and isolation both in space and time of their activities, have dramatically increased over time. The data generated within the construction industry has become increasingly overwhelming. Most currently available computer tools for the building industry have offered productivity improvement in the transmission of graphical drawings and textual specifications, without addressing more fundamental changes in building life cycle management. Facility managers and building owners are primarily concerned with highlighting areas of existing or potential maintenance problems in order to be able to improve the building performance, satisfying occupants and minimising turnover especially the operational cost of maintenance. In doing so, they collect large amounts of data that is stored in the building’s maintenance database. The work described in this paper is targeted at adding value to the design and maintenance of buildings by turning maintenance data into information and knowledge. Data mining technology presents an opportunity to increase significantly the rate at which the volumes of data generated through the maintenance process can be turned into useful information. This can be done using classification algorithms to discover patterns and correlations within a large volume of data. This paper presents how and what data mining techniques can be applied on maintenance data of buildings to identify the impediments to better performance of building assets. It demonstrates what sorts of knowledge can be found in maintenance records. The benefits to the construction industry lie in turning passive data in databases into knowledge that can improve the efficiency of the maintenance process and of future designs that incorporate that maintenance knowledge.
Resumo:
The new edition of this widely used and respected introductory accounting textbook continues to provide students and academics with a well written and accessible resource, with ample illustrations and applications to business for a first study of accounting. The text effectively maintains the balance between a 'user' and 'preparer' perspective by integrating real financial information and business decisions throughout. Through the use of real company information and financial statements students will quickly appreciate the use and users of accounting information. The textbook clearly outlines to students how a financial statement - such as a balance sheet, income statement, cash flow statement - communicates the financing, operating, and investing activities of a business. The text builds a strong conceptual understanding and develops skills in the application of accounting principles and techniques, providing students with a solid foundation for further studies in accounting. The integral role of financial statements for decision making is also emphasised in this text and is reinforced throughout by the Decision Toolkit in each chapter. Students are provided with an extensive set of tools necessary to make business decisions based on financial information.
Resumo:
Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.
Resumo:
“SOH see significant benefit in digitising its drawings and operation and maintenance manuals. Since SOH do not currently have digital models of the Opera House structure or other components, there is an opportunity for this national case study to promote the application of Digital Facility Modelling using standardized Building Information Models (BIM)”. The digital modelling element of this project examined the potential of building information models for Facility Management focusing on the following areas: • The re-usability of building information for FM purposes • BIM as an Integrated information model for facility management • Extendibility of the BIM to cope with business specific requirements • Commercial facility management software using standardised building information models • The ability to add (organisation specific) intelligence to the model • A roadmap for SOH to adopt BIM for FM The project has established that BIM – building information modelling - is an appropriate and potentially beneficial technology for the storage of integrated building, maintenance and management data for SOH. Based on the attributes of a BIM, several advantages can be envisioned: consistency in the data, intelligence in the model, multiple representations, source of information for intelligent programs and intelligent queries. The IFC – open building exchange standard – specification provides comprehensive support for asset and facility management functions, and offers new management, collaboration and procurement relationships based on sharing of intelligent building data. The major advantages of using an open standard are: information can be read and manipulated by any compliant software, reduced user “lock in” to proprietary solutions, third party software can be the “best of breed” to suit the process and scope at hand, standardised BIM solutions consider the wider implications of information exchange outside the scope of any particular vendor, information can be archived as ASCII files for archival purposes, and data quality can be enhanced as the now single source of users’ information has improved accuracy, correctness, currency, completeness and relevance. SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. There have been remarkably few technical difficulties in converting the House’s existing conventions and standards to the new model based environment. This demonstrates that the IFC model represents world practice for building data representation and management (see Sydney Opera House – FM Exemplar Project Report Number 2005-001-C-3, Open Specification for BIM: Sydney Opera House Case Study). Availability of FM applications based on BIM is in its infancy but focussed systems are already in operation internationally and show excellent prospects for implementation systems at SOH. In addition to the generic benefits of standardised BIM described above, the following FM specific advantages can be expected from this new integrated facilities management environment: faster and more effective processes, controlled whole life costs and environmental data, better customer service, common operational picture for current and strategic planning, visual decision-making and a total ownership cost model. Tests with partial BIM data – provided by several of SOH’s current consultants – show that the creation of a SOH complete model is realistic, but subject to resolution of compliance and detailed functional support by participating software applications. The showcase has demonstrated successfully that IFC based exchange is possible with several common BIM based applications through the creation of a new partial model of the building. Data exchanged has been geometrically accurate (the SOH building structure represents some of the most complex building elements) and supports rich information describing the types of objects, with their properties and relationships.
Resumo:
An earlier CRC-CI project on ‘automatic estimating’ (AE) has shown the key benefit of model-based design methodologies in building design and construction to be the provision of timely quantitative cost evaluations. Furthermore, using AE during design improves design options, and results in improved design turn-around times, better design quality and/or lower costs. However, AEs for civil engineering structures do not exist; and research partners in the CRC-CI expressed interest in exploring the development of such a process. This document reports on these investigations. The central objective of the study was to evaluate the benefits and costs of developing an AE for concrete civil engineering works. By studying existing documents and through interviews with design engineers, contractors and estimators, we have established that current civil engineering practices (mainly roads/bridges) do not use model-based planning/design. Drawings are executed in 2D and only completed at the end of lengthy planning/design project management lifecycle stages. We have also determined that estimating plays two important, but different roles. The first is part of project management (which we have called macro level estimating). Estimating in this domain sets project budgets, controls quality delivery and contains costs. The second role is estimating during planning/design (micro level estimating). The difference between the two roles is that the former is performed at the end of various lifecycle stages, whereas the latter is performed at any suitable time during planning/design.
Resumo:
The determination of the most appropriate procurement method for capital works projects is a challenging task for the Department of Housing and Works (DHW) and other Western Australian State Government Agencies because of the array of assessment criteria that are considered and the procurement methods that are available. A number of different procurement systems can be used to deliver capital works projects such a traditional, design and construct and management. Sub-classifications of these systems have proliferated and continue to emerge in response to market demands. The selection of an inappropriate procurement method may lead to undesirable project outcomes. To facilitate DHW in selecting an appropriate procurement method for its capital works projects, a six step procurement method selection process is presented. The characteristics of the most common forms of procurement method used in Australia are presented. Case studies where procurement methods have been used for specific types of capital works in Western Australia are offered to provide a reference point and learning opportunity for procurement method selection.
Resumo:
A plethora of methods for procuring building projects are available to meet the needs of clients. Deciding what method to use for a given project is a difficult and challenging task as a client’s objectives and priorities need to marry with the selected method so as to improve the likelihood of the project being procured successfully. The decision as to what procurement system to use should be made as early as possible and underpinned by the client’s business case for the project. The risks and how they can potentially affect the client’s business should also be considered. In this report, the need for client’s to develop a procurement strategy, which outlines the key means by which the objectives of the project are to be achieved is emphasised. Once a client has established a business case for a project, appointed a principal advisor, determined their requirements and brief, then consideration as to which procurement method to be adopted should be made. An understanding of the characteristics of various procurement options is required before a recommendation can be made to a client. Procurement systems can be categorised as traditional, design and construct, management and collaborative. The characteristics of these systems along with the procurement methods commonly used are described. The main advantages and disadvantages, and circumstances under which a system could be considered applicable for a given project are also identified.
Resumo:
While teacher education equips beginning teachers with critical knowledge and skills about teaching and fosters an understanding of learning in and from teaching some of the most critical elements of teaching are only learned in the workplace when beginning teachers commence their professional teaching careers. This transition to professional practice may be facilitated by mentoring from a more experienced teacher. Expert mentoring assists beginning teachers to build their teaching capacities more quickly and also lays the foundation for innovative professional practice. However, the presence of a mentor alone is not sufficient with the success of mentoring reliant on the skills and knowledge of mentors. Mentoring relationships are most effective when mentors are trained for their roles. While mentor preparation is the single most important factor in contributing to mentoring success, few teachers receive formal training to prepare them adequately for mentoring roles. The purpose of this paper is to report on the implementation of a mentoring development program designed to build mentoring capacities in experienced teachers. The program was trialled in a school in rural Australia. A range of qualitative data was collected from participants over the duration of the mentoring program and follow up data collected six months subsequent to the conclusion of the program.
Resumo:
Both in developed and developing economies, major public funding is invested in civil infrastructure assets. Efficiency and comfort level of expected and demanded living standards are largely dependant on the management strategies of these assets. Buildings are one of the major & vital assets, which need to be maintained primarily to ensure its functionality by effective & efficient delivery of services and to optimize economic benefits. Not withstanding, public building infrastructure is not considered in Infrastructure report card published by Australian Infrastructure Report Card Alliance Partners (2001). The reason appears to be not having enough data to rate public building infrastructure. American Infrastructure Report Card (2001) gave “School Buildings” ‘d-’ rating, which is below ‘poor’. For effective asset management of building infrastructure, a need emerged to optimise the budget for managing assets, to cope up with increased user expectations, to response effectively to possible asset failures, to deal with ageing of assets and aging populations and to treat other scenarios including technology advancement and non-asset solutions. John (Asset Management, 2001) suggests that in the area of asset management worldwide, UK, Australia and New Zealand are leading.
Resumo:
This report is the culmination of a two-stage research project to inform the Australian property and construction industry generally, in addition to providing the Australian Building Codes Board (ABCB) with information to allow it to determine whether or not sustainability requirements are necessary in the Future Building Code of Australia (BCA21). The Australian Building Codes Board is a joint initiative of all levels of government in Australia. The Board’s mission is to provide for efficiency and cost effectiveness in meeting community expectations for health, safety and amenity in the design, construction and use of buildings through the creation of nationally consistent building codes, standards, regulatory requirements and regulatory systems. The Stage 1 (literature review) and Stage 2 (workshops) reports are intended to be read in conjunction with one another. These reports and the Database are provided as appendices. The Conclusions of this, the final report, are the result of the overall program of work.
Resumo:
Trying to innovate or wanting to? Making a start is the most difficult step on any journey. Whether trying to innovate for the first time, or seeking improvements on current performance, organisations are confronted with a plethora of options. Innovate now! makes action easier by presenting some of the key considerations for improving innovation performance. This guide has been based on the outcomes of a survey and case studies conducted between 2003 and 2005 in the Australian property and construction industry and therefore contains unique and up-to-date information, examples and suggestions tailored specifically to your industry needs. The large-scale industry survey and 12 innovation case studies on which this guide are based were carried out by The BRITE (Building Research, Innovation, Technology and Environment) Project as part of research for the Cooperative Research Centre for Construction Innovation. The stakeholders volunteering to take part in BRITE research included over 400 businesses, 14 government organisations, 8 industry associations and 4 universities.