160 resultados para SUPPLY CHAINS
Resumo:
This is a preliminary scoping presentation. It outlines some of the very early issues identified this research topic.
Resumo:
Purpose: The purpose of this paper is to gain a better understanding of the types of relationships that exist along the supply chain and the capabilities that are needed to manage them effectively. ---------- Design/methodology/approach: This is exploratory research as there has been little empirical research into this area. Quantitative data were gathered by using a self-administered questionnaire, using the Australian road freight industry as the context. There were 132 usable responses. Inferential and descriptive analysis, including factor analysis, confirmatory factor and regression analysis was used to examine the predictive power of relational factors in inter-firm relationships. ---------- Findings: Three factors were identified as having significant influence on relationships: sharing, power and interdependency. “Sharing” is the willingness of the organisation to share resources with other members of the supply chain. “Power” relates to exercising control based on experience, knowledge and position in the supply chain. “Interdependency” is the relative levels of dependency along the supply chain. ---------- Research limitations/implications: The research only looks at the Australian road freight industry; a wider sample including other industries would help to strengthen the generalisability of the findings. ---------- Practical implications: When these factors are correlated to the types of relationship, arm's length, cooperation, collaboration and alliances, managerial implications can be identified. The more road freight businesses place importance on power, the less they will cooperate. The greater the importance of sharing and interdependency, the greater is the likelihood of arm's length relationships. ---------- Originality/value: This paper makes a contribution by describing empirical work conducted in an under-researched but important area – supply chain relationships in the Australian road freight industry.
Resumo:
When the supply voltages are balanced and sinusoidal, load compensation can give both unity power factor (UPF) and perfect harmonic cancellation (PHC) source currents. But under distorted supply voltages, achieving both UPF and PHC currents are not possible and contradictory to each other. Hence there should be an optimal performance between these two important compensation goals. This paper presents an optimal control algorithm for load compensation under unbalanced and distorted supply voltages. In this algorithm source currents are compensated for reactive, imbalance components and harmonic distortions set by the limits. By satisfying the harmonic distortion limits and power balance, this algorithm gives the source currents which will provide the maximum achievable power factor. The detailed simulation results using MATLAB are presented to support the performance of the proposed optimal control algorithm.
Resumo:
When asking the question, ``How can institutions design science policies for the benefit of decision makers?'' Sarewitz and Pielke Sarewitz, D., Pielke Jr., R.A., this issue. The neglected heart of science policy: reconciling supply of and demand for science. Environ. Sci. Policy 10] posit the idea of ``reconciling supply and demand of science'' as a conceptual tool for assessment of science programs. We apply the concept to the U.S. Department of Agriculture's (USDA) carbon cycle science program. By evaluating the information needs of decision makers, or the ``demand'', along with the supply of information by the USDA, we can ascertain where matches between supply and demand exist, and where science policies might miss opportunities. We report the results of contextual mapping and of interviews with scientists at the USDA to evaluate the production and use of current agricultural global change research, which has the stated goal of providing ``optimal benefit'' to decision makers on all levels. We conclude that the USDA possesses formal and informal mechanisms by which scientists evaluate the needs of users, ranging from individual producers to Congress and the President. National-level demands for carbon cycle science evolve as national and international policies are explored. Current carbon cycle science is largely derived from those discussions and thus anticipates the information needs of producers. However, without firm agricultural carbon policies, such information is currently unimportant to producers. (C) 2006 Elsevier Ltd. All rights reserved.
Resumo:
This paper presents a high voltage pulsed power system based on low voltage switch-capacitor units connected to a current source for several applications such as plasma systems. A modified positive buck-boost converter topology is used to utilize the current source concept and a series of low voltage switch-capacitor units is connected to the current source in order to provide high voltage with high voltage stress (dv/dt) as demanded by loads. This pulsed power converter is flexible in terms of energy control, in that the stored energy in the current source can be adjusted by changing the current magnitude to significantly improve the efficiency of various systems with different requirements. Output voltage magnitude and stress (dv/dt) can be controlled by a proper selection of components and control algorithm to turn on and off switching devices.
Resumo:
Improving efficiency and flexibility in pulsed power supply technologies is the most substantial concern of pulsed power systems specifically with regard to plasma generation. Recently, the improvement of pulsed power supply has become of greater concern due to the extension of pulsed power applications to environmental and industrial areas. With this respect, a current source based topology is proposed in this paper as a pulsed power supply which gives the possibility of power flow control during load supplying mode. The main contribution in this configuration is utilization of low-medium voltage semiconductor switches for high voltage generation. A number of switch-diode-capacitor units are designated at the output of topology to exchange the current source energy into voltage form and generate a pulsed power with sufficient voltage magnitude and stress. Simulations carried out in Matlab/SIMULINK platform as well as experimental tests on a prototype setup have verified the capability of this topology in performing desired duties. Being efficient and flexible are the main advantages of this topology.
Resumo:
Fault tree analysis (FTA) is presented to model the reliability of a railway traction power system in this paper. First, the construction of fault tree is introduced to integrate components in traction power systems into a fault tree; then the binary decision diagram (BDD) method is used to evaluate fault trees qualitatively and quantitatively. The components contributing to the reliability of overall system are identified with their relative importance through sensitivity analysis. Finally, an AC traction power system is evaluated by the proposed methods.
Resumo:
Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.
Resumo:
This paper focuses on data exchange relationships and ways to improve collaboration in the supply chain. Initially, the paper examines the information needs and alternatives in supply chain management. In the second part, the paper identifies different sets of factors that are likely to influence information sharing with suppliers, from the manufacturers’ point of view. Results from a Finnish Manufacturing industry survey show that manufacturers provided substantial information on demand data, production schedules, and inventories to their suppliers. Respondents perceived delivery performance measured by the timeliness, accuracy, and defect rate of deliveries as the primary incentives for supplier collaboration. On the other hand, supplier image and the market in which the supplier operates were found to be less relevant in determining the intensity of collaboration.
Supply chain sustainability : a relationship management approach moderated by culture and commitment
Resumo:
This research explores the nature of relationship management on construction projects in Australia and examines the effects of culture, by means of Schwarz’s value survey, on relationships under different contract strategies. The research was based on the view that the development of a sustainable supply chain depends on the transfer of knowledge and capabilities from the larger players in the supply chain through collaboration brought about by relationship management. The research adopted a triangulated approach in which quantitative data were collected by questionnaire, interviews were conducted to explore and enrich the quantitative data and case studies were undertaken in order to illustrate and validate the findings. The aim was to investigate how values and attitudes enhance or reduce the incorporation of the supply chain into the project. From the research it was found that the degree of match and mismatch between values and contract strategy impacts commitment and the engagement and empowerment of the supply chain.