329 resultados para Program C : Delivery Management of Built Assets


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction is an information intensive industry in which the accuracy and timeliness of information is paramount. It observed that the main communication issue in construction is to provide a method to exchange data between the site operation, the site office and the head office. The information needs under consideration are time critical to assist in maintaining or improving the efficiency at the jobsite. Without appropriate computing support this may increase the difficulty of problem solving. Many researchers focus their research on the usage of mobile computing devices in the construction industry and they believe that mobile computers have the potential to solve some construction problems that leads to reduce overall productivity. However, to date very limited observation has been conducted in terms of the deployment of mobile computers for construction workers on-site. By providing field workers with accurate, reliable and timely information at the location where it is needed, it will support the effectiveness and efficiency at the job site. Bringing a new technology into construction industry is not only need a better understanding of the application, but also need a proper preparation of the allocation of the resources such as people, and investment. With this in mind, an accurate analysis is needed to provide clearly idea of the overall costs and benefits of the new technology. A cost benefit analysis is a method of evaluating the relative merits of a proposed investment project in order to achieve efficient allocation of resources. It is a way of identifying, portraying and assessing the factors which need to be considered in making rational economic choices. In principle, a cost benefit analysis is a rigorous, quantitative and data-intensive procedure, which requires identification all potential effects, categorisation of these effects as costs and benefits, quantitative estimation of the extent of each cost and benefit associated with an action, translation of these into a common metric such as dollars, discounting of future costs and benefits into the terms of a given year, and summary of all cost and benefit to see which is greater. Even though many cost benefit analysis methodologies are available for a general assessment, there is no specific methodology can be applied for analysing the cost and benefit of the application of mobile computing devices in the construction site. Hence, the proposed methodology in this document is predominantly adapted from Baker et al. (2000), Department of Finance (1995), and Office of Investment Management (2005). The methodology is divided into four main stages and then detailed into ten steps. The methodology is provided for the CRC CI 2002-057-C Project: Enabling Team Collaboration with Pervasive and Mobile Computing and can be seen in detail in Section 3.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report presents the results of research projects conducted by The Australian Cooperative Research Centre for Construction Innovation, Queensland University of Technology, RMIT University, Queensland Government Department of Main Roads and Queensland Department of Public Works. The research projects aimed at developing a methodology for assessing variation and risk in investment in road network, including the application of the method in assessing road network performance and maintenance and rehabilitation costs for short- and long-term future investment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Durability issues of reinforced concrete construction cost millions of dollars in repair or demolition. Identification of the causes of degradation and a prediction of service life based on experience, judgement and local knowledge has limitations in addressing all the associated issues. The objective of this CRC CI research project is to develop a tool that will assist in the interpretation of the symptoms of degradation of concrete structures, estimate residual capacity and recommend cost effective solutions. This report is a documentation of the research undertaken in connection with this project. The primary focus of this research is centred on the case studies provided by Queensland Department of Main Roads (QDMR) and Brisbane City Council (BCC). These organisations are endowed with the responsibility of managing a huge volume of bridge infrastructure in the state of Queensland, Australia. The main issue to be addressed in managing these structures is the deterioration of bridge stock leading to a reduction in service life. Other issues such as political backlash, public inconvenience, approach land acquisitions are crucial but are not within the scope of this project. It is to be noted that deterioration is accentuated by aggressive environments such as salt water, acidic or sodic soils. Carse, 2005, has noted that the road authorities need to invest their first dollars in understanding their local concretes and optimising the durability performance of structures and then look at potential remedial strategies.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Designing and estimating civil concrete structures is a complex process which to many practitioners is tied to manual or semi-manual processes of 2D design and cannot be further improved by automated, interacting design-estimating processes. This paper presents a feasibility study for the development an automated estimator for concrete bridge design. The study offers a value proposition: an efficient automated model-based estimator can add value to the whole bridge design-estimating process, i.e., reducing estimation errors, shortening the duration of success estimates, and increasing the benefit of doing cost estimation when compared with the current practice. This is then followed by a description of what is in an efficient automated model-based estimator and how it should be used. Finally the process of model-based estimating is compared with the current practice to highlight the values embedded in the automated processes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Facility managers have to acquire, integrate, edit and update diverse facility information ranging from building elements & fabric data, operational costs, contract types, room allocation, logistics, maintenance, etc. With the advent of standardized Building Information Models (BIM) such as the Industry Foundation Classes (IFC) new opportunities are available for Facility Managers to manage their FM data. The usage of IFC supports data interoperability between different software systems including the use of operational data for facility management systems. Besides the re-use of building data, the Building Information Model can be used as an information framework for storing and retrieving FM related data. Currently several BIM driven FM systems are available including IFC compliant ones. These systems have the potential to not only manage primary data more effectively but also to offer practical systems for detailed monitoring, and analysis of facility performance that can underpin innovative and more cost effective management of complex facilities.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The effective management of bridge stock involves making decisions as to when to repair, remedy, or do nothing, taking into account the financial and service life implications. Such decisions require a reliable diagnosis as to the cause of distress and an understanding of the likely future degradation. Such diagnoses are based on a combination of visual inspections, laboratory tests on samples and expert opinions. In addition, the choice of appropriate laboratory tests requires an understanding of the degradation mechanisms involved. Under these circumstances, the use of expert systems or evaluation tools developed from “realtime” case studies provides a promising solution in the absence of expert knowledge. This paper addresses the issues in bridge infrastructure management in Queensland, Australia. Bridges affected by alkali silica reaction and chloride induced corrosion have been investigated and the results presented using a mind mapping tool. The analysis highights that several levels of rules are required to assess the mechanism causing distress. The systematic development of a rule based approach is presented. An example of this application to a case study bridge has been used to demonstrate that preliminary results are satisfactory.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The resources listed in this document describe the design and construction opportunities available to building owners who wish to re-Life their properties. They do not yet examine management opportunities, which may also help owners improve the efficiency of their existing stock.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A need for an efficient life care management of building portfolio is becoming increasingly due to increase in aging building infrastructure globally. Appropriate structural engineering practices along with facility management can assist in optimising the remaining life cycle costs for existing public building portfolio. A more precise decision to either demolish, refurbish, do nothing or rebuilt option for any typical building under investigation is needed. In order to achieve this, the status of health of the building needs to be assessed considering several aspects including economic and supply-demand considerations. An investment decision for a refurbishment project competing with other capital works and/or refurbishment projects can be supported by emerging methodology residual service life assessment. This paper discusses challenges in refurbishment projects of public buildings and with a view towards development of residual service life assessment methodology

Relevância:

100.00% 100.00%

Publicador:

Resumo:

One of the key issues facing public asset owners is the decision of refurbishing aged built assets. This decision requires an assessment of the “remaining service life” of the key components in a building. The remaining service life is significantly dependent upon the existing condition of the asset and future degradation patterns considering durability and functional obsolescence. Recently developed methods on Residual Service Life modelling, require sophisticated data that are not readily available. Most of the data available are in the form of reports prior to undertaking major repairs or in the form of sessional audit reports. Valuable information from these available sources can serve as bench marks for estimating the reference service life. The authors have acquired similar informations from a public asset building in Melbourne. Using these informations, the residual service life of a case study building façade has been estimated in this paper based on state-of-the-art approaches. These estimations have been evaluated against expert opinion. Though the results are encouraging it is clear that the state-of-the-art methodologies can only provide meaningful estimates provided the level and quality of data are available. This investigation resulted in the development of a new framework for maintenance that integrates the condition assessment procedures and factors influencing residual service life

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years considerable effort has gone into quantifying the reuse and recycling potential of waste generated by residential construction. Unfortunately less information is available for the commercial refurbishment sector. It is hypothesised that significant economic and environmental benefit can be derived from closer monitoring of the commercial construction waste stream. With the aim of assessing these benefits, the authors are involved in ongoing case studies to record both current standard practice and the most effective means of improving the eco-efficiency of materials use in office building refurbishments. This paper focuses on the issues involved in developing methods for obtaining the necessary information on better waste management practices and establishing benchmark indicators. The need to create databases to establish benchmarks of waste minimisation best practice in commercial construction is stressed. Further research will monitor the delivery of case study projects and the levels of reuse and recycling achieved in directly quantifiable ways

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper describes a work-in-progress on developing design environments that combine wireless and mobile technologies with augmented reality to facilitate bringing context from the physical environment to the virtual models for design work. One of the challenges for designers in a variety of end-user-oriented design disciplines such as architecture and industrial design has been capturing and replaying the contextual information of the intended domain of the artifact being designed. Either the technology is decidedly low-tech, such as charcoal drawings in a sketchbook, out-of-reach, such as immersive virtual reality CAVEs, or a “make-do” with existing technologies, such as a collage of digital photos. This paper describes a novel combination ofoff-the-shelf” technologies that may allow designers more capability to create models using standard computer-aided design applications and augmented reality to combine the current, physical context with the projected, digital context. We demonstrate this approach in the building design domain to address a common problem in building construction, construction defect resolution.