168 resultados para Exploit the images in the building
Resumo:
Siphons have been used since ancient times, but exactly how they work is still a matter of debate. In order to elucidate the modus operandi of a siphon, a 1.5 m high siphon was set up in a hypobaric chamber to explore siphon behaviour in a low-pressure environment. When the pressure in the chamber was reduced to about 0.18 atmospheres, a curious waterfall-like feature appeared downstream from the apex of the siphon. A hypothesis is presented to explain the waterfall phenomenon. When the pressure was reduced further the siphon broke into two columns - in effect becoming two back-to-back barometers. This experiment demonstrates the role of atmospheric pressure in explaining the hydrostatic characteristics of a siphon and the role of molecular cohesion in explaining the hydrodynamic aspects.
Resumo:
If there is a silver lining to the adversarial, dispute-prone nature of the building and construction industry, it can be found in the concomitant rise of innovative dispute resolution mechanisms. Time, cost and relationship concerns have meant that the formal adversarial system holds little appeal for disputing parties. As these alternative forms of dispute avoidance/resolution have matured in Australia over the last 20 years, attention has turned to the key characteristics of each process and their suitability to the building and construction industry. This article considers the role of dispute review boards (DRBs) and mediation as two alternative methods for avoiding/resolving disputes in the construction industry. Criteria are established for evaluating the efficacy of these procedures and their sensitivity to the needs of construction industry disputants. The ultimate conclusion reached is that DRBs represent a powerful, yet underutilised dispute resolution tool in Australia, and possess many industry-specific advantages that more traditional forms of alternative dispute resolution (particularly mediation) do not provide.
Resumo:
The Climate Change Adaptation for Natural Resource Management (NRM) in East Coast Australia Project aims to foster and support an effective “community of practice” for climate change adaptation within the East Coast Cluster NRM regions that will increase the capacity for adaptation to climate change through enhancements in knowledge and skills and through the establishment of long‐term collaborations. It is being delivered by six consortium research partners: * The University of Queensland (project lead) * Griffith University * University of the Sunshine Coast * CSIRO * New South Wales Office of Environment and Heritage * Queensland Department of Science, IT, Innovation and the Arts (Queensland Herbarium). The project relates to the East Coast Cluster, comprising the six coastal NRM regions and regional bodies between Rockhampton and Sydney: * Fitzroy Basin Association (FBA) * Burnett‐Mary Regional Group (BMRG) * SEQ Catchments (SEQC) * Northern Rivers Catchment Management Authority (CMA) (NRCMA) * Hunter‐Central Rivers CMA (HCRCMA) * Hawkesbury Nepean CMA (HNCMA). The aims of this report are to summarise the needs of the regional bodies in relation to NRM planning for climate change adaptation, and provide a basis for developing the detailed work plan for the research consortium. Two primary methods were used to identify the needs of the regional bodies: (1) document analysis of the existing NRM/ Catchment Action Plans (CAPs) and applications by the regional bodies for funding under Stream 1 of the Regional NRM Planning for Climate Change Fund, and; (2) a needs analysis workshop, held in May 2013 involving representatives from the research consortium partners and the regional bodies. The East Coast Cluster includes five of the ten largest significant urban areas in Australia, world heritage listed natural environments, significant agriculture, mining and extensive grazing. The three NSW CMAs have recently completed strategic level CAPs, with implementation plans to be finalised in 2014/2015. SEQC and FBA are beginning a review of their existing NRM Plans, to be completed in 2014 and 2015 respectively; while BMRG is aiming to produce a NRM and Climate Variability Action Strategy. The regional bodies will receive funding from the Australian Government through the Regional NRM Planning for Climate Change Fund (NRM Fund) to improve regional planning for climate change and help guide the location of carbon and biodiversity activities, including wildlife corridors. The bulk of the funding will be available for activities in 2013/2014, with smaller amounts available in subsequent years. Most regional bodies aim to have a large proportion of the planning work complete by the end of 2014. In addition, NSW CMAs are undergoing major structural change and will be incorporated into semi‐autonomous statutory Local Land Services bodies from 2014. Boundaries will align with local government boundaries and there will be significant change in staff and structures. The regional bodies in the cluster have a varying degree of climate knowledge. All plans recognise climate change as a key driver of change, but there are few specific actions or targets addressing climate change. Regional bodies also have varying capacity to analyse large volumes of spatial or modelling data. Due to the complex nature of natural resource management, all regional bodies work with key stakeholders (e.g. local government, industry groups, and community groups) to deliver NRM outcomes. Regional bodies therefore require project outputs that can be used directly in stakeholder engagement activities, and are likely to require some form of capacity building associated with each of the outputs to maximise uptake. Some of the immediate needs of the regional bodies are a summary of information or tools that are able to be used immediately; and a summary of the key outputs and milestone dates for the project, to facilitate alignment of planning activities with research outputs. A project framework is useful to show the linkages between research elements and the relevance of the research to the adaptive management cycle for NRM planning in which the regional bodies are engaged. A draft framework is proposed to stimulate and promote discussion on research elements and linkages; this will be refined during and following the development of the detailed project work plan. The regional bodies strongly emphasised the need to incorporate a shift to a systems based resilience approach to NRM planning, and that approach is included in the framework. The regional bodies identified that information on climate projections would be most useful at regional and subregional scale, to feed into scenario planning and impact analysis. Outputs should be ‘engagement ready’ and there is a need for capacity building to enable regional bodies to understand and use the projections in stakeholder engagement. There was interest in understanding the impacts of climate change projections on ecosystems (e.g. ecosystem shift), and the consequent impacts on the production of ecosystem services. It was emphasised that any modelling should be able to be used by the regional bodies with their stakeholders to allow for community input (i.e. no black box models). The online regrowth benefits tool was of great interest to the regional bodies, as spatial mapping of carbon farming opportunities would be relevant to their funding requirements. The NSW CMAs identified an interest in development of the tool for NSW vegetation types. Needs relating to socio‐economic information included understanding the socio‐economic determinants of carbon farming uptake and managing community expectations. A need was also identified to understand the vulnerability of industry groups as well as community to climate change impacts, and in particular understanding how changes in the flow of ecosystem services would interact with the vulnerability of these groups to impact on the linked ecologicalsocio‐economic system. Responses to disasters (particularly flooding and storm surge) and recovery responses were also identified as being of interest. An ecosystem services framework was highlighted as a useful approach to synthesising biophysical and socioeconomic information in the context of a systems based, resilience approach to NRM planning. A need was identified to develop processes to move towards such an approach to NRM planning from the current asset management approach. Examples of best practice in incorporating climate science into planning, using scenarios for stakeholder engagement in planning and processes for institutionalising learning were also identified as cross‐cutting needs. The over‐arching theme identified was the need for capacity building for the NRM bodies to best use the information available at any point in time. To this end a planners working group has been established to support the building of a network of informed and articulate NRM agents with knowledge of current climate science and capacity to use current tools to engage stakeholders in NRM planning for climate change adaptation. The planners working group would form the core group of the community of practice, with the broader group of stakeholders participating when activities aligned with their interests. In this way, it is anticipated that the Project will contribute to building capacity within the wider community to effectively plan for climate change adaptation.
Resumo:
The Land Sales Act 1984 regulates “off the plan” sales in Queensland in conjunction with several provisions in the Body Corporate and Community Management Act 1997. Together the Acts regulate sales in both unit developments and housing estates. From 2010 to 2013 the Queensland Government undertook a comprehensive review of the Land Sales Act 1984 to identify opportunities to modernise and improve the legislation. Significant changes were recommended by the Review to align the Land Sales Act 1984 (LSA) with current surveying and conveyancing practice and to overcome a number of practical issues faced by developers under the current legislation. A significant outcome of the review is the removal of provisions related to off the plan community title sales from the LSA to the Body Corporate and Community Management Act 1997 (BCCMA) and the Building Units and Group Titles Act 1980 (BUGTA). This article examines the Land Sales and Other Legislation Amendment Act 2014 due to commence in November 2014.
Resumo:
Background In vision, there is a trade-off between sensitivity and resolution, and any eye which maximises information gain at low light levels needs to be large. This imposes exacting constraints upon vision in nocturnal flying birds. Eyes are essentially heavy, fluid-filled chambers, and in flying birds their increased size is countered by selection for both reduced body mass and the distribution of mass towards the body core. Freed from these mass constraints, it would be predicted that in flightless birds nocturnality should favour the evolution of large eyes and reliance upon visual cues for the guidance of activity. Methodology/Principal Findings We show that in Kiwi (Apterygidae), flightlessness and nocturnality have, in fact, resulted in the opposite outcome. Kiwi show minimal reliance upon vision indicated by eye structure, visual field topography, and brain structures, and increased reliance upon tactile and olfactory information. Conclusions/Significance This lack of reliance upon vision and increased reliance upon tactile and olfactory information in Kiwi is markedly similar to the situation in nocturnal mammals that exploit the forest floor. That Kiwi and mammals evolved to exploit these habitats quite independently provides evidence for convergent evolution in their sensory capacities that are tuned to a common set of perceptual challenges found in forest floor habitats at night and which cannot be met by the vertebrate visual system. We propose that the Kiwi visual system has undergone adaptive regressive evolution driven by the trade-off between the relatively low rate of gain of visual information that is possible at low light levels, and the metabolic costs of extracting that information.
Resumo:
Internal heat sources may not only consume energy directly through their operation (e.g. lighting), but also contribute to building cooling or heating loads, which indirectly change building cooling and heating energy. Through the use of building simulation technique, this paper investigates the influence of building internal load densities on the energy and thermal performance of air conditioned office buildings in Australia. Case studies for air conditioned office buildings in major Australian capital cities are presented. It is found that with a decrease of internal load density in lighting and/or plug load, both the building cooling load and total energy use can be significantly reduced. Their effect on overheating hour reduction would be dependent on the local climate. In particular, it is found that if the building total internal load density is reduced from the base case of “medium” to “extra–low, the building total energy use under the future 2070 high scenario can be reduced by up to 89 to 120 kWh/m² per annum and the overheating problem could be completely avoided. It is suggested that the reduction in building internal load densities could be adopted as one of adaptation strategies for buildings in face of the future global warming.
Resumo:
BACKGROUND: Pituitary volume is currently measured as a marker of hypothalamic-pituitary-adrenal hyperactivity in patients with psychosis despite suggestions of susceptibility to antipsychotics. Qualifying and quantifying the effect of atypical antipsychotics on the volume of the pituitary gland will determine whether this measure is valid as a future estimate of HPA-axis activation in psychotic populations. AIMS: To determine the qualitative and quantitative effect of atypical antipsychotic medications on pituitary gland volume in a first-episode psychosis population. METHOD: Pituitary volume was measured from T1-weighted magnetic resonance images in a group of 43 first-episode psychosis patients, the majority of whom were neuroleptic-naive, at baseline and after 3months of treatment, to determine whether change in pituitary volume was correlated with cumulative dose of atypical antipsychotic medication. RESULTS: There was no significant baseline difference in pituitary volume between subjects and controls, or between neuroleptic-naive and neuroleptic-treated subjects. Over the follow-up period there was a negative correlation between percentage change in pituitary volume and cumulative 3-month dose of atypical antipsychotic (r=-0.37), i.e. volume increases were associated with lower doses and volume decreases with higher doses. CONCLUSIONS: Atypical antipsychotic medications may reduce pituitary gland volume in a dose-dependent manner suggesting that atypical antipsychotic medication may support affected individuals to cope with stress associated with emerging psychotic disorders.
Resumo:
As a precursor to the 2014 G20 Leaders’ Summit held in Brisbane, Australia, the Queensland Government sponsored a program of G20 Cultural Celebrations, designed to showcase the Summit’s host city. The cultural program’s signature event was the Colour Me Brisbane festival, a two-week ‘citywide interactive light and projection installations’ festival that was originally slated to run from 24 October to 9 November, but which was extended due to popular demand to conclude with the G20 Summit itself on 16 November. The Colour Me Brisbane festival comprised a series projection displays that promoted visions of the city’s past, present, and future at landmark sites and iconic buildings throughout the city’s central business district and thus transformed key buildings into forms of media architecture. In some instances the media architecture installations were interactive, allowing the public to control aspects of the projections through a computer interface situated in front of the building; however, the majority of the installations were not interactive in this sense. The festival was supported by a website that included information regarding the different visual and interactive displays and links to social media to support public discussion regarding the festival (Queensland Government 2014). Festival-goers were also encouraged to follow a walking-tour map of the projection sites that would take them on a 2.5 kilometre walk from Brisbane’s cultural precinct, through the city centre, concluding at parliament house. In this paper, we investigate the Colour Me Brisbane festival and the broader G20 Cultural Celebrations as a form of strategic placemaking—designed, on the one hand, to promote Brisbane as a safe, open, and accessible city in line with the City Council’s plan to position Brisbane as a ‘New World City’ (Brisbane City Council 2014). On the other hand, it was deployed to counteract growing local concerns and tensions over the disruptive and politicised nature of the G20 Summit by engaging the public with the city prior to the heightened security and mobility restrictions of the Summit weekend. Harnessing perspectives from media architecture (Brynskov et al. 2013), urban imaginaries (Cinar & Bender 2007), and social media analysis, we take a critical approach to analysing the government-sponsored projections, which literally projected the city onto itself, and public responses to them via the official, and heavily promoted, social media hashtags (#colourmebrisbane and #g20cultural). Our critical framework extends the concepts of urban phantasmagoria and urban imaginaries into the emerging field of media architecture to scrutinise its potential for increased political and civic engagement. Walter Benjamin’s concept of phantasmagoria (Cohen 1989; Duarte, Firmino, & Crestani 2014) provides an understanding of urban space as spectacular projection, implicated in commodity and techno-culture. The concept of urban imaginaries (Cinar & Bender 2007; Kelley 2013)—that is, the ways in which citizens’ experiences of urban environments are transformed into symbolic representations through the use of imagination—similarly provides a useful framing device in thinking about the Colour Me Brisbane projections and their relation to the construction of place. Employing these critical frames enables us to examine the ways in which the installations open up the potential for multiple urban imaginaries—in the sense that they encourage civic engagement via a tangible and imaginative experience of urban space—while, at the same time, supporting a particular vision and way of experiencing the city, promoting a commodified, sanctioned form of urban imaginary. This paper aims to dissect the urban imaginaries intrinsic to the Colour Me Brisbane projections and to examine how those imaginaries were strategically deployed as place-making schemes that choreograph reflections about and engagement with the city.
Resumo:
This paper presents data on residents’ use of common stairways and lifts (vertical circulation spaces) in multi-storey apartment buildings (MSABs) in Brisbane, Australia. Vertical movement is a defining aspect of multi-storey living and the energy consumed by lifts contributes significantly to the energy budget of the typical MSAB. The purpose is to investigate whether a reappraisal of vertical circulation design, through the lens of residents’ requirements, might contribute to energy reductions in this building type. Data was gathered on a theoretical sample of MSAB ranging from five decades old to very recent schemes. 90 residents were surveyed about their day-to-day experiences of circulation and access systems. The results showed that residents mainly chose to use the stairs for convenience and exercise. Building management regimes that limited residents’ access to collective spaces were the main impediment to discretionary stair use. Only two buildings did not have fully enclosed stairwells and these had the highest stair usage, suggesting that stair design, and building governance are two areas that might be worthy of attention. The more that circulation design is focussed on limiting access, the less opportunities there are for personal choice, incidental social interaction and casual surveillance of collective spaces. The more that design of vertical circulation spaces in MSAB meets residents’ needs the less likely they are to be reliant on continuous energy supply for normal functioning.
Resumo:
The study explores the relationship between open space design, factors impacting open space provision, and resident satisfaction with open space in multistorey apartment buildings in the context of the subtropical lifestyle and climate of Brisbane Australia. The purpose of the paper is to identify the specific physical and spatial design characteristics residents perceive to be important in open spaces associated with their private dwellings and with shared open spaces. Firsthand resident evaluations of everyday experiences of residing in inner urban high density environments are explored through a survey of 636 residents and interviews with 24 residents. Private balconies are highly valued, but residents’ satisfaction would be enhanced by spaciousness for diverse activities, privacy and climate responsive design. Communal spaces and facilities are used infrequently by many residents who prefer interactions with community outside of the building. This is related to preferences for a level of anonymity in a setting where privacy is difficult to achieve due to physical proximity of neighbours.
Resumo:
Purpose The purpose of this paper is to discuss the relation between dissatisfaction with housing conditions and considering moving among residents of Finnish rental multifamily buildings. The paper examines physical attributes, socioeconomic factors, and subjective opinions related to housing conditions and satisfaction with housing. Design/methodology/approach Logistic regression analysis is used to examine survey data to analyse which factors contribute to dissatisfaction with the housing unit and the apartment building and whether dissatisfaction is related to consideration of moving. Findings The findings indicate that dissatisfaction with the building and individual housing unit are associated with greater probability of considering moving. Satisfaction with kitchen, living room, storage, and building age are the most important indicators of satisfaction with the housing unit, and satisfaction with living room, bathroom, storage, and building age are associated with satisfaction with the apartment building. These are the areas in which landlords could invest in renovations to increase satisfaction in an attempt to reduce turnover. Research limitations/implications The study is conducted with Finnish data only. The sample is not a representative sample of the Finnish population. A longitudinal study would be needed to determine whether dissatisfied residents indending to move actually change residence. Originality/value This study is the first of its kind in the Finnish housing market. It tests a general model that has been suggested to be customized to local conditions. In addition, much of the research on this topic is more than 20 years old. Examination of the model under current housing and socioeconomic conditions is necessary to determine if relationships have changed over time.
Resumo:
This research was undertaken to encompass and identify challenges and impact factors that affect the successful outcomes of heritage building projects, especially those related to finding major causes of delays and cost overruns across projects in all Australian states. This project determined and analysed the causes of such delays and programme issues emanating from the planning and execution phases, whilst also analysing the requirements for management of multiple stakeholder relationships and the influence of unforeseen technical factors. The research proposes "call for action" guidance and was validated by experienced experts in heritage building projects in Australia. The proposed guidance is designed to ensure that realistic cost targets and delivery timeframes are set in future heritage projects, and necessary interventions made at appropriate project stages to ensure decisions are made that will help to prevent overtime and cost overuns.
Resumo:
As long as population growth continues, policies for urban consolidation closer to city centres fail, and there is land available, Australians will continue to build in new Greenfield suburbs. However, the 50-year legacy of the homogeneous one-size-fits-all approach to suburbia beyond the sticks and sometimes hours away from where one can find a job, is proving unsustainable, the commute alone a significant contributor to greenhouse gas emissions across the globe. The ‘creative suburb’ was inspired by the possibility to create new, innovative and entrepreneurial suburbs, places which are more self-sufficient and self-contained than the ‘product’ perpetuated down under even today. The ‘creative suburb’ draws on significant primary research with suburban home-based creative industries workers, vernacular architecture, and town planning in the Toowoomba region, in the state of Queensland, Australia, as inspiration for a series of new building and urban designs available for innovators operating in new suburban greenfield situations in Queensland and possibly further a field. This paper considers the role ‘creative reflective practice’ played in the process of developing the building and urban designs presented in a book and showcased in a building as creative outputs of this practice-led and property development industry embedded inquiry.