368 resultados para Delegation


Relevância:

10.00% 10.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A trip was undertaken to look at concerns of Public Works and Main Roads Departments of Queensland. David Paterson and Wayne Ganther from CSIRO travelled to the Sunshine Coast with Alan Carse of Queensland Department of Main Roads and Michael Ball of Queensland Department of Public Works. We were also joined for part of the visits by Ed Bowers of QBuild which is a commercial unit of Public Works responsible for maintenance of Public Works. During the trip we visited a bridge on the David Low Way at Sunrise Beach near Noosa. This bridge was in a serve marine environment with high salt content in the concrete and corrosion of the galvanised guardrails and barriers. Also the foreshore at Coolum was visited and the use of stainless steel was examined. This is discussed in this report. Most problems stemmed from incorrect specification due to lack of awareness of the severity of the environment. The companion report Visit to Schools Report 2002-059-B No 7. covers the visit to four schools north of Caloundra.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Objectives The objectives of this project were two-fold: • Assess the ease with which current architectural CAD systems supported the use ofparametric descriptions in defining building shape, engineering system performance and cost at the early stages of building design; • Assess the feasibility of implementing a software decision support system that allowed designers to trade-off the characteristics and configuration of various engineering systems to move towards a “global optimum” rather than considering each system in isolation and expecting humans to weigh up all of the costs and benefits. The first stage of the project consisted of using four different CAD systems to define building shells (envelopes) with different usages. These models were then exported into a shared database using the IFC information exchange specifications. The second stage involved the implementation of small computer programs that were able to estimate relevant system parameters based on performance requirements and the constraints imposed by the other systems. These are presented in a unified user interface that extracts the appropriate building shape parameters from the shared database Note that the term parametric in this context refers to the relationships among and between all elements of the building model - not just geometric associations - which will enable the desired coordination.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This project aims to assess the extent of economic sustainability of working in international markets by Australian construction design-related firms. This investigation also identified barriers and success factors firms experience, which ultimately increases or reduces their exposure to financial risk. This study explored new research territory by developing a detailed understanding of the way three successful firms have maintained their longevity in various international markets. The firms are not considered to be large firms by international standards. The manner in which the firms achieve long term sustainability, deal with problems and barriers in international markets and develop successful strategies rely upon being adaptable to different markets and changes within markets. A model was developed based upon a critical analysis of the literature. An adaptive performance framework for sustainability was developed which had three key areas; internationalisation process, market knowledge and design management. The sustainable business model is underpinned by the management of non-economic factors, which include social, cultural and intellectual capital. The ultimate aim of any firm and the ultimate indicator of success is financial capital. Firms typically develop their own highly sophisticated financial measures themselves however have only an implicit understanding of other softer and less tangible factors that impact upon sustainability. Adaptive performance is the firm’s continual adaptivity of business practices to respond to and thereby achieve client satisfaction by a combination of self, market and project needs assessment.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This project aims to assess the extent of economic sustainability of working in international markets by Australian construction design-related firms. This investigation also identified barriers and success factors firms experience, which ultimately increases or reduces their exposure to financial risk. This study explored new research territory by developing a detailed understanding of the way three successful firms have maintained their longevity in various international markets. The firms are not considered to be large firms by international standards. The manner in which the firms achieve long term sustainability, deal with problems and barriers in international markets and develop successful strategies rely upon being adaptable to different markets and changes within markets. A model was developed based upon a critical analysis of the literature. An adaptive performance framework for sustainability was developed which had three key areas; internationalisation process, market knowledge and design management. The sustainable business model is underpinned by the management of non-economic factors, which include social, cultural and intellectual capital. The ultimate aim of any firm and the ultimate indicator of success is financial capital. Firms typically develop their own highly sophisticated financial measures themselves however have only an implicit understanding of other softer and less tangible factors that impact upon sustainability. Adaptive performance is the firm’s continual adaptivity of business practices to respond to and thereby achieve client satisfaction by a combination of self, market and project needs assessment.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Queensland Department of Public Works (QDPW) and the Queensland Department of Main Roads (QDMR) have identified a need for industry e-contracting guidelines in the short to medium term. Each of these organisations conducts tenders and contracts for over $600 million annually. This report considers the security and legal issues relating to the shift from a paper-based tendering system to an electronic tendering system. The research objectives derived from the industry partners include: • a review of current standards and e-tendering systems; • a summary of legal requirements impacting upon e-tendering; • an analysis of the threats and requirements for any e-tendering system; • the identification of outstanding issues; • an evaluation of possible e-tendering architectures; • recommendations for e-tendering systems.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is an internal report of the BRITE Project’s activities for 2003. The goal of the Project is to improve the incidence and quality of innovation in the Australian building and construction industry. The primary aim of the year’s work was to complete six case studies of innovation in the Australian building and construction industry. A secondary aim was to prepare for the Project’s innovation survey to be conducted in 2004. The case study program was undertaken to demonstrate the benefits of innovation and show how businesses successfully implement their innovations. The innovation survey is intended to run every 2nd year over the life of the CRC in order to benchmark innovation performance as a tool for public sector policy development and business strategy development. Appendix A contains a list of papers produced by the BRITE Project in 2003. The remainder of this report focuses on the case study program, which was successfully completed during 2003, with six booklets being produced.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This document reports on an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in NSW, Vic and Qld, covering main contractors, trade contractors, consultants, suppliers and clients. One-third of this population was sampled and a response rate of 30% was achieved. The survey investigates innovation determinants in the industry, comprising various aspects of business strategy and business environment.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The BRITE Project undertook six innovation case studies of building and construction projects in 2005. The purpose of the program was to demonstrate the benefits of innovation and highlight the nature of successful implementation strategies. The cases were selected following a public call in industry magazines across Australia, which resulted in approximately 50 nominations. The six selected case studies resulted in three prominent contributions to knowledge

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report summarises the fi ndings of an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The BRITE Innovation Survey can be viewed in full at www.brite.crcci.info.The objective of the BRITE project is to improve the incidence and quality of innovation in the Australian construction industry. Many stakeholders in the industry are sceptical about the potential for innovation and its likely benefi ts. Many also lack the linkages and capabilities required for successful innovation. The BRITE Project is redressing this situation through demonstration and benchmarking activities. The term ‘innovation’ is defi ned as a new or signifi cantly improved technology or advanced business practice. Innovation may be technological or organisational, and it may be new to the world, or just new to the industry or business concerned. The defi nition includes the adoption of existing advancements developed outside a particular business. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in New South Wales, Victoria and Queensland, covering main contractors, trade contractors, consultants, suppliers and clients. Onethird of this population was sampled and a response rate of almost 30% was achieved. The survey collected information about respondents’ perceptions of innovation determinants in the industry, comprising various aspects of business strategy and business environment.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Trying to innovate or wanting to? Making a start is the most difficult step on any journey. Whether trying to innovate for the first time, or seeking improvements on current performance, organisations are confronted with a plethora of options. Innovate ― Now! makes action easier by presenting some of the key considerations for improving innovation performance. This guide has been based on the outcomes of a survey and case studies conducted between 2003 and 2005 in the Australian property and construction industry and therefore contains unique and up-to-date information, examples and suggestions tailored specifically to your industry needs.