229 resultados para Costs, Industrial
Resumo:
This paper outlines our literature review background, investigation and practical application utilizing a precise optical survey level and total station technology for a specialist industrial measurement application. The practical part of the project was to measure and check specific critical features of the Industrial JIG assembly table used by the Queensland University of Technology (QUT) Motorsport group. The JIG is used in constructing a new Formula SAE race-car frame each year and is used throughout the racing season to check the production frame for twists, bends and potential stresses. The industrial JIG table required two survey approaches, firstly determination of the overall flatness throughout its’ steel base surface. Secondly was the validation of verticality of the steel uprights used to support and hold the race-car frame in place during construction and checking alignment for key suspension components. In addition the investigation brings realisations that there are far more accurate, efficient and economical technologies to be harnessed in industrial metrology.
Resumo:
Sourcing funding for the provision of new urban infrastructure has been a policy dilemma for governments around the world for decades. This is particularly relevant in high growth areas where new services are required to support swelling populations. Existing communities resist the introduction of new taxes to fund such infrastructure, hence the introduction of charges to the developer has flourished. The Australian infrastructure funding policy dilemmas are reflective of similar matters to some extent in the United Kingdom, and to a greater extent the United States of America. In these countries, infrastructure cost recovery policies have been in place since the 1940’s and 1970’s respectively. There is an extensive body of theoretical and empirical literature that discusses the passing on (to home buyers) or passing back (to the englobo land seller) of these increased infrastructure charges, and the corresponding impact on housing cost and supply. The purpose of this research is to examine the international evidence that suggests infrastructure charges contribute to increased house prices as well as reduced land supply. The paper concludes that whilst the theoretical work is largely consistent, the empirical research to date is inconclusive and further research is required into these impacts in Australia.
Resumo:
Article in Courier Mail. Friday July 22, 2011.
Resumo:
The decision in QCOAL Pty Ltd v Cliffs Australia Coal Pty Ltd [2010] QSC 479 involved an examination of a number of issues relating to the assessment of costs under the Legal Profession Act 2007 (Qld). The decision highlights a range of issues which, in slightly different circumstances, may have deprived the successful party of the right to recover costs by reference to the costs agreement.
Resumo:
This article examines the decision in Turner v Mitchells Solicitors [2011] QDC 61 and the issue whether an application for assessment of costs under an interim bill at the time of a final bill is subject to the usual 12-month restriction.
Resumo:
On 2 December 1998, the Federal Government tabled their policy paper entitled Regulation Impact Statement for the Introduction of a Goods and Services Tax (RIS) in the House of Representatives. The Federal Government predicted that total gross GST compliance costs to Australian businesses in the first year of implementation would be approximately $1,912 million (or $1,195 per firm). Furthermore, it is estimated that the recurrent net compliance costs will be much lower at $131 per firm. Whilst the government made brief references to charitable organisations in their analysis, it stated that the compliance costs faced by nonprofits would, in substance, be no different to the compliance costs faced by businesses or government departments. This paper examines the RIS process in relation to nonprofit organisations in the context of recent taxation legislation affecting nonprofit organisations. It argues that the assumption that nonprofit compliance costs are similar to government and business costs is flawed and makes a case for the RIS process to be reformed to include more appropriate assessments of the impact of legislation on nonprofit enterprises.
Resumo:
An earlier study by the Asian Development Bank (ADB) showed that the annual cost of road traffic accidents in 2001 was S$699.36 million which was 0.5% of the annual GDP. This paper attempts to update of the cost estimates of road traffic accidents. More precise methods of computing the human cost, lost output and property damage are adopted which grew in an annual cost of S$610.3 million or 0.338% of the annual GDP in 2003. A more conservative estimate of S$878,000 for fatal accident is also obtained, compared to the earlier figure of S$1.4 million. This study has shown that it is necessary to update the annual traffic accident costs regularly, as the figures vary with the number of accidents which change with time.
Resumo:
Soil organic carbon sequestration rates over 20 years based on the Intergovernmental Panel for Climate Change (IPCC) methodology were combined with local economic data to determine the potential for soil C sequestration in wheat-based production systems on the Indo-Gangetic Plain (IGP). The C sequestration potential of rice–wheat systems of India on conversion to no-tillage is estimated to be 44.1 Mt C over 20 years. Implementing no-tillage practices in maize–wheat and cotton–wheat production systems would yield an additional 6.6 Mt C. This offset is equivalent to 9.6% of India's annual greenhouse gas emissions (519 Mt C) from all sectors (excluding land use change and forestry), or less than one percent per annum. The economic analysis was summarized as carbon supply curves expressing the total additional C accumulated over 20 year for a price per tonne of carbon sequestered ranging from zero to USD 200. At a carbon price of USD 25 Mg C−1, 3 Mt C (7% of the soil C sequestration potential) could be sequestered over 20 years through the implementation of no-till cropping practices in rice–wheat systems of the Indian States of the IGP, increasing to 7.3 Mt C (17% of the soil C sequestration potential) at USD 50 Mg C−1. Maximum levels of sequestration could be attained with carbon prices approaching USD 200 Mg C−1 for the States of Bihar and Punjab. At this carbon price, a total of 34.7 Mt C (79% of the estimated C sequestration potential) could be sequestered over 20 years across the rice–wheat region of India, with Uttar Pradesh contributing 13.9 Mt C.
Resumo:
In Golder Associates Pty Ltd v Challen [2012] QDC 11 Samios DCJ recognised a solicitor’s lien over the file for unpaid fees and confirmed that a lien should not be lightly set aside. The decision, which is under appeal, adds to the range of authorities which are now grappling with some of the provisions of the Legal Profession Act 2007 (Qld) (the LPA) relating to costs billing and assessment. These would appear to have been drafted without a great deal of intellectual rigour (cf. Turner v Mitchells Solicitors [2011] QDC 61 at [26]).
Resumo:
The decision of the Queensland Court of Appeal in King v King demonstrates that in proceedings in Queensland Courts legal practitioners acting pro bono should still consider at the outset whether it is desired to provide for recovery of costs which might be recovered from another party.
Resumo:
A recent District Court case is believed to be the first in Queensland in which UCPR r 5 has been used to support the setting aside of a regularly entered default judgment without a costs order.