387 resultados para Civil engineering work


Relevância:

90.00% 90.00%

Publicador:

Resumo:

4D simulation, building information modeling, virtual construction, computer simulation and virtual prototyping are emerging topics in the building construction industry. These techniques not only relate to the buildings themselves, but can also be applied to other forms of construction, including bridges. Since bridge construction is a complex process involving multiple types of plant and equipment, applying such virtual methods benefits the understanding of all parties in construction practice. This paper describes the relationship between temporary platforms, plant and equipment resources and a proposed-built model in the construction planning and use of Virtual Prototyping Simulation (VPS) to implement different construction scenarios in order to help planners identify an optimal construction plan. A case study demonstrates the use of VPS integrated with temporary platform design and plant and equipment-resource allocation to generate different construction scenarios.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Design-build (DB) system is well-known to be a popular and effective delivery method of construction work worldwide. It has been demonstrated as superior to the traditional delivery system in regards to time and cost performance. However, it suffers a major flaw, in that the performance of project quality cannot be guaranteed. This paper aims to investigate the underlying factors attributing to the poor quality performance of design-build projects in Queensland. Five major factors were first identified through a comprehensive literature review, which relate to (1) project briefing and scope definition, (2) client’s role and responsibility, (3) procurement selection, (4) contractor’s incentive, and (5) design document quality. A questionnaire survey with 127 DB professionals was conducted to determine how these factors affect various quality criteria, i.e. functional quality, architectural quality, technical quality, workmanship quality, client satisfaction and overall quality. With the architectural quality reduced greatly, the research findings reveal that the DB projects in Queensland have the reduced overall quality compared with traditional projects. The impacts of different factors on the quality performance of DB projects have been closely examined and summarized. The research findings will facilitate project stakeholder’s better understanding of the delivery process of the DB system and provide guidelines to improve the quality performance.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A software tool (DRONE) has been developed to evaluate road traffic noise in a large area with the consideration of network dynamic traffic flow and the buildings. For more precise estimation of noise in urban network where vehicles are mainly in stop and go running conditions, vehicle sound power level (for acceleration/deceleration cruising and ideal vehicle) is incorporated in DRONE. The calculation performance of DRONE is increased by evaluating the noise in two steps of first estimating the unit noise database and then integrating it with traffic simulation. Details of the process from traffic simulation to contour maps are discussed in the paper and the implementation of DRONE on Tsukuba city is presented.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Fire safety of buildings has been recognised as very important by the building industry and the community at large. Traditionally, increased fire rating is provided by simply adding more plasterboards to light gauge steel frame (LSF) walls, which is inefficient. Many research studies have been undertaken to investigate the thermal behaviour of traditional LSF stud wall systems under standard fire conditions. However, no research has been undertaken on the thermal behaviour of LSF stud walls using the recently proposed composite panel. Extensive fire testing of both non-load bearing and load bearing wall panels was conducted in this research based on the standard time-temperature curve in AS1530.4. Three groups of LSF wall specimens were tested with no insulation, cavity insulation and the new composite panel based on an external insulation layer between plasterboards. This paper presents the details of this experimental study into the thermal performance of non-load bearing walls lined with various configurations of plasterboard and insulation. Extensive descriptive and numerical results of the tested non-load bearing wall panels given in this paper provide a thorough understanding of their thermal behaviour, and valuable time-temperature data that can be used to validate numerical models. Test results showed that the innovative composite stud wall systems outperformed the traditional stud wall systems in terms of their thermal performance, giving a much higher fire rating.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The effectiveness of a repair work for the restoration of spalled reinforced concrete (r.c.) structures depends to a great extent, on their ability to restore the structural integrity of the r.c. element, to restore its serviceability and to protect the reinforcements from further deterioration. This paper presents results of a study concocted to investigate the structural performance of eight spalled r.c. beams repaired using two advanced repair materials in various zones for comparison purposes, namely a free flowing self compacting mortar (FFSCM) and a polymer Modified cementitious mortar (PMCM). The repair technique adopted was that for the repair of spalled concrete in which the bond between the concrete and steel was completely lost due to reinforcement corrosion or the effect of fire or impact. The beams used for the experiment were first cast, then hacked at various zones before they were repaired except for the control beam. The beam specimens were then loaded to failure under four point loadings. The structural response of each beam was evaluated in terms of first crack load, cracking behavior, crack pattern, deflection, variation of strains in the concrete and steel, collapse load and the modes of failure. The results of the test showed that, the repair materials applied on the various zones of the beams were able to restore more than 100% of the beams’ capacity and that FFSCM gave a better overall performance.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Gypsum plasterboards are commonly used as a fire safety material in the building industry. Many research studies have been undertaken to investigate the thermal behaviour of plasterboards under standard fire conditions. However, there are many discrepancies in relation to the basic thermal properties of plasterboards while simple equations are not available to predict the ambient surface time–temperature profiles of gypsum plasterboard panels that can be used in simulating the behaviour and strength of steel studs or joists in load bearing LSF wall and floor systems. In this research, suitable thermal properties of plasterboards were proposed based on a series of tests and available results from past research. Finite element models of gypsum plasterboard panels were then developed to simulate their thermal behaviour under standard fire conditions. The accuracy of the proposed thermal properties and the finite element models was validated by comparing the numerical results with available fire test results of plasterboard panels. This paper presents the details of the finite element models of plasterboard panels, the thermal analysis results from finite element analyses under standard fire conditions and their comparisons with experimental results

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Dhaka, the capital of Bangladesh, is facing severe traffic congestion. Owing to the flaws in past land use and transport planning decisions, uncontrolled population growth and urbanization, Dhaka’s traffic condition is worsening. Road space is widely regarded in the literature as a utility, so a common view of transport economists is that its usage ought to be charged. Road pricing policy has proven to be effective in managing travel demand, in order to reduce traffic congestion from road networks in a number of cities including London, Stockholm and Singapore. Road pricing as an economic mechanism to manage travel demand can be more effective and user-friendly when revenue is hypothecated into supply alternatives such as improvements to the transit system. This research investigates the feasibility of adopting road pricing in Dhaka with respect to a significant Bus Rapid Transit (BRT) project. Because both are very new concepts for the population of Dhaka, public acceptability would be a principal issue driving their success or failure. This paper explores the travel behaviour of workers in Dhaka and public perception toward Road Pricing with regards to work trips- based on worker’s travel behaviour. A revealed preference and stated preference survey has been conducted on sample of workers in Dhaka. They were asked limited demographic questions, their current travel behaviour and at the end they had been given several hypothetical choices of integrated BRT and road pricing to choose from. Key finding from the survey is the objective of integrated road pricing; subsidies Bus rapid Transit by road pricing to get reduced BRT fare; cannot be achieved in Dhaka. This is because most of the respondent stated that they would choose the cheapest option Walk-BRT-Walk, even though this would be more time consuming and uncomfortable as they have to walk from home to BRT station and also from BRT station to home. Proper economic analysis has to be carried out to find out the appropriate fare of BRT and road charge with some incentive for the low income people.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A planner’s view of the purpose of their actions, the role they play, the focus of their work and in whose interest they operate greatly influence their approach to planning and the outcome of their work. However there is no common and established understanding within the profession on these themes. Contemporary planning theory, practice and education is characterised by the parallel existence of multiple, often contradictory schools of thought. What values and perspectives are held by the next generation of planning professionals as they emerge from contemporary planning programs? This preliminary investigation seeks to identify the views and perspectives of early career planners on the purpose and role of planning, the degree to which planning is oriented on the future and the nature of the public interest, using various schools of planning thought as a thematic framework. In the current phase of a larger project, extant students and recent graduates from planning courses at three Queensland universities were surveyed electronically to ascertain their views, with plans to undertake a broader study of similar populations across Australia. Within the current pilot, students and graduates did not identify strongly with a single school of planning thought, but favoured contrasting rational and collaborative definitions of the role and purpose of planning and the public interest and pragmatic concepts of partial knowledge of the future and the value of experience in managing present issues.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper studies traffic hysteresis arising in traffic oscillations from a behavioral perspective. It is found that the occurrence and type of traffic hysteresis is closely correlated with driver behavior when experiencing traffic oscillations and with the time driver reaction begins relative to the starting deceleration wave. Statistical results suggest that driver behavior is different depending on its position along the oscillation. This suggests that different car-following models should be used inside the different stages of an oscillation in order to replicate realistic congestion features.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The effect of resource management on the building design process directly influences the development cycle time and success of construction projects. This paper presents the information constraint net (ICN) to represent the complex information constraint relations among design activities involved in the building design process. An algorithm is developed to transform the information constraints throughout the ICN into a Petri net model. A resource management model is developed using the ICN to simulate and optimize resource allocation in the design process. An example is provided to justify the proposed model through a simulation analysis of the CPN Tools platform in the detailed structural design. The result demonstrates that the proposed approach can obtain the resource management and optimization needed for shortening the development cycle and optimal allocation of resources.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In this issue of the Journal, the articles considered reflect the depth of research and practice that is unique to project management discipline. The range of topics addressed includes managing project contracts (Chan et al., “A Comparative Study of the Benefits of Applying Target Cost Contracts Between South Australia and Hong Kong”), managing project complexity (Chronéer and Bergquist, “Managerial Complexity in Process Industrial R&D Projects: A Swedish Study”), identifying early warning signs in complex projects (Williams et al., “Identifying and Acting on Early Warning Signs in Complex Projects”), project risk management (Krane, Olsson, and Rolstadås, “How Project Manager–Project Owner Interaction Can Work Within and Influence Project Risk Management”), exploring decisions regarding outsourcing and alignment of the project management office (Martins and Martins, “Outsourcing Operations in Project Management Offices: The Reality of Brazilian Companies”), and project management practices at strategic and tactical levels of the organization leading to sustainable development (Herazo, Lizarralde, and Paquin, “Sustainable Development in the Building Sector: A Canadian Case Study on the Alignment of Strategic and Tactical Management”).

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide a summary description of the doctoral thesis investigating the field of project management (PM) deployment. Researchers will be informed of the current contributions within this topic and of the possible further investigations and researches. The decision makers and practitioners will be aware of a set of tools addressing the PM deployment with new perspectives. Design/methodology/approach – Research undertaken with the thesis is based on quantitative methods using time series statistics (time distance analysis) and comparative and correlation analysis aimed to better define and understand the PM deployment within and between countries or groups. Findings – The results suggest a project management deployment index (PMDI) to objectively measure the PM deployment based on the concept of certification. A proposed framework to empirically benchmark the PM deployment between countries by integrating the PMDI time series with the two dimensional comparative analysis of Sicherl. The correlation analysis within Hoftsede cultural framework shows the impact of the national culture dimensions on the PM deployment. The forecasting model shows a general continual growth trend of the PM deployment, with continual increase in the time distance between the countries. Research limitations/implications – The PM researchers are offered an empirical quantification on which they can construct further investigations and understanding of this phenomenon. The number of possible units that can be studied offers wide possibilities to replicate the thesis work. New researches can be undertaken to investigate further the contribution of other social or economical indicators, or to refine and enrich the definition of the PMDI indicator. Practical implications – These results have important implications on the PM deployment approaches. The PMDI measurements and time series comparisons facilitate considerably the measurement and benchmarking between the units (e.g. countries) and against targets, while the readiness setting of the studied unit (in terms of development and cultural levels) impacts the PM deployment within this country. Originality/value – This paper provides a summary of cutting-edge research work in the studied field of PM deployment and a link to the published works that researchers can use to help them understand the thesis research as well as how it can be extended.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to summarise a successfully defended doctoral thesis. The main purpose of this paper is to provide a summary of the scope, and main issues raised in the thesis so that readers undertaking studies in the same or connected areas may be aware of current contributions to the topic. The secondary aims are to frame the completed thesis in the context of doctoral-level research in project management as well as offer ideas for further investigation which would serve to extend scientific knowledge on the topic. Design/methodology/approach – Research reported in this paper is based on a quantitative study using inferential statistics aimed at better understanding the actual and potential usage of earned value management (EVM) as applied to external projects under contract. Theories uncovered during the literature review were hypothesized and tested using experiential data collected from 145 EVM practitioners with direct experience on one or more external projects under contract that applied the methodology. Findings – The results of this research suggest that EVM is an effective project management methodology. The principles of EVM were shown to be significant positive predictors of project success on contracted efforts and to be a relatively greater positive predictor of project success when using fixed-price versus cost-plus (CP) type contracts. Moreover, EVM's work-breakdown structure (WBS) utility was shown to positively contribute to the formation of project contracts. The contribution was not significantly different between fixed-price and CP contracted projects, with exceptions in the areas of schedule planning and payment planning. EVM's “S” curve benefited the administration of project contracts. The contribution of the S-curve was not significantly different between fixed-price and CP contracted projects. Furthermore, EVM metrics were shown to also be important contributors to the administration of project contracts. The relative contribution of EVM metrics to projects under fixed-price versus CP contracts was not significantly different, with one exception in the area of evaluating and processing payment requests. Practical implications – These results have important implications for project practitioners, EVM advocates, as well as corporate and governmental policy makers. EVM should be considered for all projects – not only for its positive contribution to project contract development and administration, for its contribution to project success as well, regardless of contract type. Contract type should not be the sole determining factor in the decision whether or not to use EVM. More particularly, the more fixed the contracted project cost, the more the principles of EVM explain the success of the project. The use of EVM mechanics should also be used in all projects regardless of contract type. Payment planning using a WBS should be emphasized in fixed-price contracts using EVM in order to help mitigate performance risk. Schedule planning using a WBS should be emphasized in CP contracts using EVM in order to help mitigate financial risk. Similarly, EVM metrics should be emphasized in fixed-price contracts in evaluating and processing payment requests. Originality/value – This paper provides a summary of cutting-edge research work and a link to the published thesis that researchers can use to help them understand how the research methodology was applied as well as how it can be extended.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

As evidenced with the 2011 floods the state of Queensland in Australia is quite vulnerable to this kind of disaster. Climate change will increase the frequency and magnitude of such events and will have a variety of other impacts. To deal with these governments at all levels need to be prepared and work together. Since most of the population of the state is located in the coastal areas and these areas are more vulnerable to the impacts of climate change this paper examines climate change adaptation efforts in coastal Queensland. The paper is part of a more comprehensive project which looks at the critical linkages between land use and transport planning in coastal Queensland, especially in light of increased frequencies of cyclonic activity and other impacts associated with climate change. The aim is improving coordination between local and state government in addressing land use and transport planning in coastal high hazard areas. By increasing the ability of local governments and state agencies to coordinate planning activities, we can help adapt to impacts of climate change. Towards that end, we will look at the ways that these groups currently interact, especially with regard to issues involving uncertainty related to climate change impacts. Through surveys and interviews of Queensland coastal local governments and state level planning agencies on how they coordinate their planning activities at different levels as well as how much they take into account the linkage of transportation and land use we aim to identify the weaknesses of the current planning system in responding to the challenges of climate change adaptation. The project will identify opportunities for improving the ways we plan and coordinate planning, and make recommendations to improve resilience in advance of disasters so as to help speed up recovery when they occur.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Construction and demolition (C&D) waste occupies the largest share of overall waste generation in many countries. However, waste management practices and outcomes may differ between countries. For instance, in Australia, C&D waste recovery is continuously improving during the last years but the amount of C&D waste increases every year, as there has been little improvement in waste avoidance and minimization. In contrast, in Germany, waste generation remains constant over many years despite the continuous economic growth. The waste recycling rate in Germany is one of the highest in the world. However, most waste recycled is from demolition work rather than from waste generated during new construction. In addition, specific laws need to be developed to further reduce landfill of non-recycled waste. Despite of the differences, C&D waste generation and recovery in both countries depend on the effectiveness of the statutory framework, which regulates their waste management practices. This is an issue in other parts of the world as well. Therefore countries can learn from each other to improve their current statutory framework for C&D waste management. By taking Germany and Australia as an example, possible measures to improve current practices of C&D waste management through better statutory tools are identified in this paper. After providing an overview of the statutory framework of both countries and their status in waste generation and recovery, a SWOT analysis is conducted to identify strengths, weaknesses, opportunities and threats of the statutory tools. Recommendations to improve the current statutory frameworks, in order to achieve less waste generation and more waste recovery in the construction industry are provided for the German and Australian government and they can also be transferred to other countries.