666 resultados para Australasian researchers
Resumo:
Game jams provide design researchers with extraordinary opportunity to watch creative teams in action and recent years have seen a number of projects which seek to illuminate the design process as seen in these events. For example, Gaydos, Harris and Martinez discuss the opportunity of the jam to expose students to principles of design process and design spaces (2011). Rouse muses on the game jam ‘as radical practice’ and a ‘corrective to game creation as it is normally practiced’. His observations about his own experience in a jam emphasise the same artistic endeavour forefronted earlier, where the experience is about creation that is divorced from the instrumental motivations of commercial game design (Rouse 2011) and where the focus is on process over product. Other participants remark on the social milieu of the event as a critical factor and the collaborative opportunity as a rich site to engage participants in design processes (Shin et al, 2012). Shin et al are particularly interested in the notion of the site of the process and the ramifications of participants being in the same location. They applaud the more localized event where there is an emphasis on local participation and collaboration. For other commentators, it is specifically the social experience in the place of the jam is the most important aspect (See Keogh 2011), not the material site but rather the physical embodied experience of ‘being there’ and being part of the event. Participants talk about game jams they have attended in a similar manner to those observations made by Dourish where the experience is layered on top of the physical space of the event (Dourish 2006). It is as if the event has taken on qualities of place where we find echoes of Tuan’s description of a particular site having an aura of history that makes it a very different place, redolent and evocative (Tuan 1977). Re-presenting the experience in place has become the goal of the data visualisation project that has become the focus of our own curated 48hr game jam. Taking our cue from the work of Tim Ingold on embodied practice, we have now established the 48hr game making challenge as a site for data visualisation research in place.
Resumo:
Existing distinctions among macro and micro approaches have been jeopardising the advances of Information Systems (IS) research. Both approaches have been criticized for explaining one level while neglecting the other; thereby, the current situation necessitates the application of multilevel research for revealing the deficiencies. Instead of studying single level (macro or micro), multilevel research entails more than one level of conceptualization and analysis, simultaneously. As the notion of multilevel is borrowed from reference disciplines, there tends to be confusions and inconsistencies within the IS discipline, which hinders the adoption of multilevel research. This paper speaks for the potential value of multilevel research, by investigating the current application status of multilevel research within the IS domain. A content analysis of multilevel research articles from major IS conferences and journals is presented. Analysis results suggest that IS scholars have applied multilevel research to produce high quality work ranging from a variety of topics. However, researchers have not yet been consistently defining “multilevel”, leading to idiosyncratic meanings of multilevel research, most often, in authors’ own interpretations. We argue that a rigorous definition of “multilevel research” needs to be explicated for consistencies in research community.
Resumo:
This paper outlines the methodology used in a PhD qualitative research study on the agency of the housing industry in Australia in the provision of accessible housing. Previous studies have identified the need for an increased supply of accessible housing to optimise the inclusion and participation of all people, yet the demand for accessible housing by new home buyers is minimal and voluntary strategies to increase supply have typically failed. In 2010, housing industry leaders agreed to adopt a national voluntary access guideline for housing (Livable Housing Design) and a strategy to provide minimum access features in all new housing by 2020. This study explores the “escaped” phenomenon; how individual agents within the housing industry respond to such initiatives. As the paper is written mid-study it uses a preliminary theme in the findings, that is, minimal demand, to illustrate the methodology of the research.
Resumo:
Objective: To estimate the time spent by the researchers for preparing grant proposals, and to examine whether spending more time increase the chances of success. Design: Observational study. Setting: The National Health and Medical Research Council (NHMRC) of Australia. Participants: Researchers who submitted one or more NHMRC Project Grant proposals in March 2012. Main outcome measures: Total researcher time spent preparing proposals; funding success as predicted by the time spent. Results: The NHMRC received 3727 proposals of which 3570 were reviewed and 731 (21%) were funded. Among our 285 participants who submitted 632 proposals, 21% were successful. Preparing a new proposal took an average of 38 working days of researcher time and a resubmitted proposal took 28 working days, an overall average of 34 days per proposal. An estimated 550 working years of researchers' time (95% CI 513 to 589) was spent preparing the 3727 proposals, which translates into annual salary costs of AU$66 million. More time spent preparing a proposal did not increase the chances of success for the lead researcher (prevalence ratio (PR) of success for 10 day increase=0.91, 95% credible interval 0.78 to 1.04) or other researchers (PR=0.89, 95% CI 0.67 to 1.17). Conclusions: Considerable time is spent preparing NHMRC Project Grant proposals. As success rates are historically 20–25%, much of this time has no immediate benefit to either the researcher or society, and there are large opportunity costs in lost research output. The application process could be shortened so that only information relevant for peer review, not administration, is collected. This would have little impact on the quality of peer review and the time saved could be reinvested into research.
Resumo:
It has been known since Rhodes Fairbridge’s first attempt to establish a global pattern of Holocene sea-level change by combining evidence from Western Australia and from sites in the northern hemisphere that the details of sea-level history since the Last Glacial Maximum vary considerably across the globe. The Australian region is relatively stable tectonically and is situated in the ‘far-field’ of former ice sheets. It therefore preserves important records of post-glacial sea levels that are less complicated by neotectonics or glacio-isostatic adjustments. Accordingly, the relative sea-level record of this region is dominantly one of glacio-eustatic (ice equivalent) sea-level changes. The broader Australasian region has provided critical information on the nature of post-glacial sea level, including the termination of the Last Glacial Maximum when sea level was approximately 125 m lower than present around 21,000–19,000 years BP, and insights into meltwater pulse 1A between 14,600 and 14,300 cal. yr BP. Although most parts of the Australian continent reveals a high degree of tectonic stability, research conducted since the 1970s has shown that the timing and elevation of a Holocene highstand varies systematically around its margin. This is attributed primarily to variations in the timing of the response of the ocean basins and shallow continental shelves to the increased ocean volumes following ice-melt, including a process known as ocean siphoning (i.e. glacio-hydro-isostatic adjustment processes). Several seminal studies in the early 1980s produced important data sets from the Australasian region that have provided a solid foundation for more recent palaeo-sea-level research. This review revisits these key studies emphasising their continuing influence on Quaternary research and incorporates relatively recent investigations to interpret the nature of post-glacial sea-level change around Australia. These include a synthesis of research from the Northern Territory, Queensland, New South Wales, South Australia and Western Australia. A focus of these more recent studies has been the re-examination of: (1) the accuracy and reliability of different proxy sea-level indicators; (2) the rate and nature of post-glacial sea-level rise; (3) the evidence for timing, elevation, and duration of mid-Holocene highstands; and, (4) the notion of mid- to late Holocene sea-level oscillations, and their basis. Based on this synthesis of previous research, it is clear that estimates of past sea-surface elevation are a function of eustatic factors as well as morphodynamics of individual sites, the wide variety of proxy sea-level indicators used, their wide geographical range, and their indicative meaning. Some progress has been made in understanding the variability of the accuracy of proxy indicators in relation to their contemporary sea level, the inter-comparison of the variety of dating techniques used and the nuances of calibration of radiocarbon ages to sidereal years. These issues need to be thoroughly understood before proxy sea-level indicators can be incorporated into credible reconstructions of relative sea-level change at individual locations. Many of the issues, which challenged sea-level researchers in the latter part of the twentieth century, remain contentious today. Divergent opinions remain about: (1) exactly when sea level attained present levels following the most recent post-glacial marine transgression (PMT); (2) the elevation that sea-level reached during the Holocene sea-level highstand; (3) whether sea-level fell smoothly from a metre or more above its present level following the PMT; (4) whether sea level remained at these highstand levels for a considerable period before falling to its present position; or (5) whether it underwent a series of moderate oscillations during the Holocene highstand.
Resumo:
Understanding the effects of design interventions on the meanings people associate with landscapes is important to critical and ethical practice in landscape architecture. Case study research has become a common way researchers evaluate design interventions and related issues, with a standardised method promoted by the Landscape Architecture Foundation (LAF). However, the method is somewhat undeveloped for interpreting landscape meanings – something most commonly undertaken as historic landscape studies, but not as studies of design effect. This research proposes a new method for such interpretation, using a case study of Richard Haag’s radical 1971 proposal for a new kind of park on the site of the former Seattle gas works.
Resumo:
This article provides a general overview of some of the plant research being conducted by a number of researchers at the Queensland University of Technology (QUT) Brisbane. Details about student projects and research facilities have been limited to those of relevance to plant structure and systematics. Academics, technicians and research students involved in plant research are in the Faculty of Science and Engineering, mainly in the School of Earth, Environment and Biological Sciences (EEBS), with a few exceptions. Our offices and laboratories are housed in a number of different buildings at the Gardens Point campus (e.g., P, Q, R, S, M Blocks) and we have strong collaborative links with Queensland Herbarium (BRI) and Mt Coot-tha Botanic Gardens.
Resumo:
New Zealand and Australia are leading the world in terms of automated land registry systems. Landonline was introduced some ten years ago for New Zealand, and the Electronic Conveyancing National Law (ECNL) is to be released over the next few years in support of a national electronic conveyancing system to be used throughout Australia. With the assistance of three proof requirements, developed for this purpose, this article measures the integrity of both systems as against the old, manual Torrens system. The authors take the position that any introduced system should at least have the same level of integrity and safety as the originally conceived manual system. The authors argue both Landonline and ECNL, as presently set up, have less credibility than the manual system as it was designed to operate, leading to the possibility of increased fraud or misuse.
Resumo:
Portable water-filled road barriers (PWFB) are roadside structures placed on temporary construction zones to separate work site from moving traffic. Recent changes in governing standards require PWFB to adhere to strict compliance in terms of lateral displacement of the road barriers and vehicle redirectionality. Actual road safety barrier test can be very costly, thus researchers resort to Finite Element Analysis (FEA) in the initial designs phase prior to real vehicle test. There has been many research conducted on concrete barriers and flexible steel barriers using FEA, however not many is done pertaining to PWFB. This research probes a new method to model joint mechanism in PWFB. Two methods to model the joining mechanism are presented and discussed in relation to its practicality and accuracy to real work applications. Moreover, the study of the physical gap and mass of the barrier was investigated. Outcome from this research will benefit PWFB research and allow road barrier designers better knowledge in developing the next generation of road safety structures.
On-road driving studies to understand why drivers behave as they do at regional rail level crossings
Resumo:
Improving safety at rail level crossings is an important part of both road and rail safety strategies. While low in number, crashes between vehicles and trains at level crossings are catastrophic events typically involving multiple fatalities and serious injuries. Advances in driving assessment methods, such as the provision of on-road instrumented test vehicles with eye and head tracking, provide researchers with the opportunity to further understand driver behaviour at such crossings in ways not previously possible. This paper describes a study conducted to further understand the factors that shape driver behaviour at rail level crossings using instrumented vehicles. Twenty-two participants drove an On-Road Test Vehicle (ORTeV) on a predefined route in regional Victoria with a mix of both active (flashing lights with/without boom barriers) and passively controlled (stop, give way) crossings. Data collected included driving performance data, head checks, and interview data to capture driver strategies. The data from an integrated suite of methods demonstrated clearly how behaviour differs at active and passive level crossings, particularly for inexperienced drivers. For example, the head check data clearly show the reliance and expectancies of inexperienced drivers for active warnings even when approaching passively controlled crossings. These studies provide very novel and unique insights into how level crossing design and warnings shape driver behaviour.
Resumo:
Construction works are project-based and interdisciplinary. Many construction management (CM) problems are ill defined. The knowledge required to address such problems is not readily available and mostly tacit in nature. Moreover, the researchers, especially the students in the higher education, often face difficulty in defining the research problem, adopting an appropriate research process and methodology for designing and validating their research. This paper describes a ‘Horseshoe’ research process approach and its application to address a research problem of extracting construction-relevant information from a building information model (BIM). It describes the different steps of the process for understanding a problem, formulating appropriate research question/s, defining different research tasks, including a methodology for developing, implementing and validating the research. It is argued that a structure research approach and the use of mixed research methods would provide a sound basis for research design and validation in order to make contribution to existing knowledge.
Resumo:
In contemporary game development circles the ‘game making jam’ has become an important rite of passage and baptism event, an exploration space and a central indie lifestyle affirmation and community event. Game jams have recently become a focus for design researchers interested in the creative process. In this paper we tell the story of an established local game jam and our various documentation and data collection methods. We present the beginnings of the current project, which seeks to map the creative teams and their process in the space of the challenge, and which aims to enable participants to be more than the objects of the data collection. A perceived issue is that typical documentation approaches are ‘about’ the event as opposed to ‘made by’ the participants and are thus both at odds with the spirit of the jam as a phenomenon and do not really access the rich playful potential of participant experience. In the data collection and visualisation projects described here, we focus on using collected data to re-include the participants in telling stories about their experiences of the event as a place-based experience. Our goal is to find a means to encourage production of ‘anecdata’ - data based on individual story telling that is subjective, malleable, and resists collection via formal mechanisms - and to enable mimesis, or active narrating, on the part of the participants. We present a concept design for data as game based on the logic of early medieval maps and we reflect on how we could enable participation in the data collection itself.
Resumo:
In Australia, the building and construction industry is taking significant steps towards the enhancement of environmental performance of the built environment. A large number of world class sustainable buildings have been constructed in recent years, offering researchers and practitioners alike a good opportunity to identify the best practices and real life experiences in delivering high performance buildings. A case study of ONE ONE ONE Eagle Street, a 6 Star Green Star office building in Brisbane, was conducted to investigate the best practice in achieving this “world leader” green office building. The study identified a number of key factors relating to project delivery system, contractor selection method, client’s early commitment, design integration, communication as major contributors to the successful delivery of this project. Additionally, key environmentally sustainable features and their cost implications were explored through in-depth interviews with the main contractor. The findings of this study will shed lights on the successful delivery of sustainable buildings and provide practical implications for different stakeholders.
Resumo:
Construction has been plagued with serious injuries and deaths for years. Although the technological advances have made the world safer and healthier, researchers have noted that some safety interventions, which had clear objective safety benefits, had failed to achieve the forecast savings in lives and injuries. The purpose of this study was to explore whether the construction workers show risk compensation and engage in greater risk taking when certain types of safety measures are implemented in the construction site. A case study approach was used to achieve the aim of this study. A typical construction site in Sydney was selected as the subject of the case study. Data were collected through direct observations, questionnaires and interviews. The findings confirm that workers show risk compensation behaviours in the construction environment. The risk compensation behaviours of workers varied with the level of experience and whether they have suffered from a past workplace injury. The findings of this study may offer a better understanding of workers’ behavioural patterns in construction environment and the effectiveness of safety interventions. The result of this study may provide supports for designing, implementing and evaluating safety interventions in construction site.