181 resultados para Alliance Boots
Resumo:
The purpose of this review is to integrate and summarize specific measurement topics (instrument and metric choice, validity, reliability, how many and what types of days, reactivity, and data treatment) appropriate to the study of youth physical activity. Research quality pedometers are necessary to aid interpretation of steps per day collected in a range of young populations under a variety of circumstances. Steps per day is the most appropriate metric choice, but steps per minute can be used to interpret time-in-intensity in specifically delimited time periods (e.g., physical education class). Reported intraclass correlations (ICC) have ranged from .65 over 2 days (although higher values also have been reported for 2 days) to .87 over 8 days (although higher values have been reported for fewer days). Reported ICCs are lower on weekend days (.59) versus weekdays (.75) and lower over vacation days (.69) versus school days (.74). There is no objective evidence of reactivity at this time. Data treatment includes (a) identifying and addressing missing values, (b) identifying outliers and reducing data appropriately if necessary, and (c) transforming the data as required in preparation for inferential analysis. As more pedometry studies in young populations are published, these preliminary methodological recommendations should be modified and refined.
Resumo:
The figure Beets took exception to displays sex‐ and age‐specific median values of aggregated published expected values for pedometer determined physical activity.
Resumo:
This Preliminary Report has been prepared by researchers at The Australian Expert Group in Industry Studies (AEGIS) for the Commonwealth Department of Industry, Science and Resources. It is intended to provide a preliminary 'product system map' of the building and construction industries which defines the system, identifies the major segments, describes key industry players and institutions and provides the basis for exploring relationships, innovation and information flows within the industries. This Preliminary Report is the first of a series of five which will explore the building and construction product system in some depth. This first report does not present original research, although it does include some new interview data and analysis of a variety of written sources. This report is rather a reformulation of existing statistical and analytical material from a product system-based perspective. It is intended to provide the basis for subsequent studies by putting what is already known into an alternative framework and allowing us to see it through a new lens.
Resumo:
The Acton Peninsula project alliance is the first project alliance in building construction in the world. The project alliance is set out to achieve the best possible outcome for the project with all participants in the alliance sharing both risks and rewards. The construction of the National Museum of Australia and the Australian Institute of Aboriginal and Torres Strait Islander Studies, on Acton Peninsula in Canberra, will be a significant Australian architectural and construction achievement. The design and construction project team is committed to achieve outstanding results in all aspects of the design, construction and delivery of this significant national project. Innovation and creativity are valued, and outstanding performance will be rewarded.
Resumo:
This paper describes a lead project currently underway through Australia’s Sustainable Built Environment National Research Centre, evaluating impacts, diffusion mechanisms and uptake of R&D in the Australian building and construction industry. Building on a retrospective analysis of R&D trends and industry outcomes, a future-focused industry roadmap will be developed to inform R&D policies more attuned to future industry needs to improve investment effectiveness. In particular, this research will evaluate national R&D efforts to develop, test and implement advanced digital modelling technologies into the design/construction/asset management cycle. This research will build new understandings and knowledge relevant to R&D funding strategies, research team formation and management (with involvement from public and private sectors, and research and knowledge institutions), dissemination of outcomes and uptake. This is critical due to the disaggregated nature of the industry, intense competition, limited R&D investment; and new challenges (e.g. digital modelling, integrated project delivery, and the demand for packaged services). The evaluation of leading Australian and international efforts to integrate advanced digital modelling technologies into the design/construction/asset management cycle will be undertaken as one of three case studies. Employing the recently released Australian Guidelines for Digital Modelling developed with buildingSMART (International Alliance for Interoperability) and the Australian Institute of Architects, technical and business benefits across the supply chain will be highlighted as drivers for more integrated R&D efforts.
Resumo:
The paper analyses knowledge integration processes at Fujitsu from a multi-level and systemic perspective. The focus is on team-building capability, capturing and utilising individual tacit knowledge, and communication networks for integrating dispersed specialist knowledge required in the development of new products and services. The analysis shows how knowledge integration is performed by Fujitsu at different layers of the company.
Resumo:
Public awareness of large infrastructure projects, many of which are delivered through networked arrangements is high for several reasons. These projects often involve significant public investment; they may involve multiple and conflicting stakeholders and can potentially have significant environmental impacts (Lim and Yang, 2008). To produce positive outcomes from infrastructure delivery it is imperative that stakeholder “buy in” be obtained particularly about decisions relating to the scale and location of infrastructure. Given the likelihood that stakeholders will have different levels of interest and investment in project outcomes, failure to manage this dynamic could potentially jeopardise project delivery by delaying or halting the construction of essential infrastructure. Consequently, stakeholder engagement has come to constitute a critical activity in infrastructure development delivered through networks. This paper draws on stakeholder theory and governance network theory and provides insights into how three multi-level networks within the Roads Alliance in Queensland engage with stakeholders in the delivery of road infrastructure. New knowledge about stakeholders has been obtained by testing a model of Stakeholder Salience and Engagement which combines and extends the stakeholder identification and salience theory and the ladder of stakeholder management and engagement. By applying this model, the broad research question: “How do governance networks engage with stakeholders?” has been addressed. A multiple embedded case study design was selected as the overall approach to explore, describe, explain and evaluate how stakeholder engagement occurred in three governance networks delivering road infrastructure in Queensland. The outcomes of this research contribute to and extend stakeholder theory by showing how stakeholder salience impacts on decisions about the types of engagement processes implemented. Governance network theory is extended by showing how governance networks interact with stakeholders. From a practical perspective this research provides governance networks with an indication of how to more effectively undertake engagement with different types of stakeholders.
Resumo:
This paper presents a summary of an extensive review of the health, disability and rehabilitation literature conducted for the purposes of informing the formulation of a sustainable approach to community based rehabilitation in rural and remote Australia. It begins with a review of definitions of disability and rehabilitation, which is followed by differentiating 'rehabilitation in the community' and 'community based rehabilitation'. Finally, a network of community based rehabilitation coalitions is proposed as a sustainable approach to community based rehabilitation in rural and remote Australia. Each coalition would have a community rehabilitation facilitator and community specific database of resources, as well as a register of local community rehabilitation assistants who can support the work of health professionals by providing rehabilitation interventions under the latter's direction. In this approach, rehabilitation is conceptualised as being about people's lives rather than only a series of interventions provided by health care professionals. As such, rehabilitation becomes everybody's business.
Resumo:
better health service.Conclusion:This research provides an insight into the perceptions of the rhetoric and reality of community member involvement in the process of developing multi-purpose services. It revealed a grounded theory in which fear and trust were intrinsic to a process of changing from a traditional hospital service to the acceptance of a new model of health care provided at a multi-purpose service.
Resumo:
Background Apart from helmets, little is known about the effectiveness of motorcycle protective clothing in reducing injuries in crashes. The study aimed to quantify the association between usage of motorcycle clothing and injury in crashes. Methods and findings Cross-sectional analytic study. Crashed motorcyclists (n = 212, 71% of identified eligible cases) were recruited through hospitals and motorcycle repair services. Data was obtained through structured face-to-face interviews. The main outcome was hospitalization and motorcycle crash-related injury. Poisson regression was used to estimate relative risk (RR) and 95% confidence intervals for injury adjusting for potential confounders. Results Motorcyclists were significantly less likely to be admitted to hospital if they crashed wearing motorcycle jackets (RR = 0.79, 95% CI: 0.69–0.91), pants (RR = 0.49, 95% CI: 0.25–0.94), or gloves (RR = 0.41, 95% CI: 0.26–0.66). When garments included fitted body armour there was a significantly reduced risk of injury to the upper body (RR = 0.77, 95% CI: 0.66–0.89), hands and wrists (RR = 0.55, 95% CI: 0.38–0.81), legs (RR = 0.60, 95% CI: 0.40–0.90), feet and ankles (RR = 0.54, 95% CI: 0.35–0.83). Non-motorcycle boots were also associated with a reduced risk of injury compared to shoes or joggers (RR = 0.46, 95% CI: 0.28–0.75). No association between use of body armour and risk of fracture injuries was detected. A substantial proportion of motorcycle designed gloves (25.7%), jackets (29.7%) and pants (28.1%) were assessed to have failed due to material damage in the crash. Conclusions Motorcycle protective clothing is associated with reduced risk and severity of crash related injury and hospitalization, particularly when fitted with body armour. The proportion of clothing items that failed under crash conditions indicates a need for improved quality control. While mandating usage of protective clothing is not recommended, consideration could be given to providing incentives for usage of protective clothing, such as tax exemptions for safety gear, health insurance premium reductions and rebates.
Resumo:
Over the past twenty years Australia has witnessed an extraordinary rise of the middle year’s movement. In more recent years, however, there is concern that middle years has fallen from the mainstream education agenda (Australian Research Alliance for Children and Youth, 2011). At a national level, evidence of this fall can be seen in the new national curriculum frameworks where reference to middle years is significantly absent, such as The Shape of the Australian Curriculum Version 2.0, (Australian Curriculum, Assessment and Reporting Authority, 2010). Evidence of the fall at a state level can be seen in Queensland Government’s 2015 commencement of junior secondary, rather than middle years, as outlined in A Flying Start for Queensland children: Why year 7 will be part of high school from 2015 (Queensland Government, 2011a). This announcement came after the Queensland government had undertaken an extensive consultation period exploring the possible uptake of middle years at a systemic level. While some may argue that middle years practices can be seen to be embedded in both the national curriculum and the junior secondary reform – it is the fact that middle years practices and philosophies are implicitly embedded (hidden) rather than being made explicitly and systematically mainstreamed (broadly accepted), that causes us grave concern. As such, we argue that this is clear indication that the middle years are being marginalized from the overarching educational agendas in Australia.
Resumo:
Many studies into construction procurement methods reveal evidence of a need to change the culture and attitude in the construction industry, transition from traditional adversarial relationships to cooperative and collaborative relationships. At the same time there is also increasing concern and discussion on alternative procurement methods, involving a movement away from traditional procurement systems. Relational contracting approaches, such as partnering and relationship management, are business strategies that align the objectives of clients, commercial participants and stakeholders. It provides a collaborative environment and a framework for all participants to adapt their behaviour to project objectives and allows for engagement of those subcontractors and suppliers down the supply chain. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a history of slow implementation of relational contracting down the supply chain. Furthermore, there exists little research on relationship management conducted in the supply chain context. This research aims to explore the association between relational contracting structures and processes and supply chain sustainability in the civil engineering construction industry. It endeavours to shed light on the practices and prerequisites for relationship management implementation success and for supply sustainability to develop. The research methodology is a triangulated approach based on Cheung.s (2006) earlier research where questionnaire survey, interviews and case studies were conducted. This new research includes a face-to-face questionnaire survey that was carried out with 100 professionals from 27 contracting organisations in Queensland from June 2008 to January 2009. A follow-up survey sub-questionnaire, further examining project participants. perspectives was sent to another group of professionals (as identified in the main questionnaire survey). Statistical analysis including multiple regression, correlation, principal component factor analysis and analysis of variance were used to identify the underlying dimensions and test the relationships among variables. Interviews and case studies were conducted to assist in providing a deeper understanding as well as explaining findings of the quantitative study. The qualitative approaches also gave the opportunity to critique and validate the research findings. This research presents the implementation of relationship management from the contractor.s perspective. Findings show that the adaption of relational contracting approach in the supply chain is found to be limited; contractors still prefer to keep the suppliers and subcontractors at arm.s length. This research shows that the degree of match and mismatch between organisational structuring and organisational process has an impact on staff.s commitment level and performance effectiveness. Key issues affecting performance effectiveness and relationship effectiveness include total influence between parties, access to information, personal acquaintance, communication process, risk identification, timely problem solving and commercial framework. Findings also indicate that alliance and Early Contractor Involvement (ECI) projects achieve higher performance effectiveness at both short-term and long-term levels compared to projects with either no or partial relationship management adopted.
Resumo:
Site-specific performance provides choices in audience experience via degrees of scale, proximity, levels of immersion and viewing perspectives. Beyond these choices, multi-site promenade events also form a connected audience/performer relationship in which moving together in time and space can produce a shared narrative and aesthetic sensibility of collective, yet individuated and shifting meanings. This paper interrogates this notion through audience/performer experiences in two separate multi-site, dance-led events. here/there/then/now occurred in four intimate sites within the Brisbane Powerhouse, providing a theatricalised platform for audiences to create linked narratives through open-ended and fragmented intertextuality. Accented Body, based on the concept of “the body as site and in site” and notions of connectivity, provided a more expansive platform for a similar, but heightened, shared engagement. Audiences traversed 6 outdoor and 2 indoor Brisbane sites moving to varying levels of a large complex. Eleven, predominantly interactive, screens provided links to other sites as well as to distributed presences in Seoul and London. The differentiation in scale and travel time between sites deepened the immersive experiences of audiences who reported transformative engagements with both site and architecture, accompanied by a sense of extended and yet quickened time.