870 resultados para Structural project
Resumo:
In the structural health monitoring (SHM) field, long-term continuous vibration-based monitoring is becoming increasingly popular as this could keep track of the health status of structures during their service lives. However, implementing such a system is not always feasible due to on-going conflicts between budget constraints and the need of sophisticated systems to monitor real-world structures under their demanding in-service conditions. To address this problem, this paper presents a comprehensive development of a cost-effective and flexible vibration DAQ system for long-term continuous SHM of a newly constructed institutional complex with a special focus on the main building. First, selections of sensor type and sensor positions are scrutinized to overcome adversities such as low-frequency and low-level vibration measurements. In order to economically tackle the sparse measurement problem, a cost-optimized Ethernet-based peripheral DAQ model is first adopted to form the system skeleton. A combination of a high-resolution timing coordination method based on the TCP/IP command communication medium and a periodic system resynchronization strategy is then proposed to synchronize data from multiple distributed DAQ units. The results of both experimental evaluations and experimental–numerical verifications show that the proposed DAQ system in general and the data synchronization solution in particular work well and they can provide a promising cost-effective and flexible alternative for use in real-world SHM projects. Finally, the paper demonstrates simple but effective ways to make use of the developed monitoring system for long-term continuous structural health evaluation as well as to use the instrumented building herein as a multi-purpose benchmark structure for studying not only practical SHM problems but also synchronization related issues.
Resumo:
We have studied the mineral Ca(H4B3O7)(OH)⋅4(H2O) or CaB3O3(OH)5⋅4(H2O) using electron microscopy and vibrational spectroscopy. The mineral has been characterized by a range of techniques including X-ray diffraction, thermal analysis, electron microscopy with EDX and vibrational spectroscopy. Electron microscopy shows a pure phase and the chemical analysis shows the presence of calcium only. The nominal resolution of the Raman spectrometer is of the order of 2 cm−1 and as such is sufficient enough to identify separate bands for the stretching bands of the two boron isotopes. Raman and infrared bands are assigned to the stretching and bending modes of trigonal and tetrahedral boron and the stretching modes of the hydroxyl and water units. By using a combination of techniques we have characterized the borate mineral inyoite.
Resumo:
Many researchers in the field of civil structural health monitoring (SHM) have developed and tested their methods on simple to moderately complex laboratory structures such as beams, plates, frames, and trusses. Fieldwork has also been conducted by many researchers and practitioners on more complex operating bridges. Most laboratory structures do not adequately replicate the complexity of truss bridges. Informed by a brief review of the literature, this paper documents the design and proposed test plan of a structurally complex laboratory bridge model that has been specifically designed for the purpose of SHM research. Preliminary results have been presented in the companion paper.
Resumo:
Many researchers in the field of civil structural health monitoring have developed and tested their methods on simple to moderately complex laboratory structures such as beams, plates, frames, and trusses. Field work has also been conducted by many researchers and practitioners on more complex operating bridges. Most laboratory structures do not adequately replicate the complexity of truss bridges. This paper presents some preliminary results of experimental modal testing and analysis of the bridge model presented in the companion paper, using the peak picking method, and compares these results with those of a simple numerical model of the structure. Three dominant modes of vibration were experimentally identified under 15 Hz. The mode shapes and order of the modes matched those of the numerical model; however, the frequencies did not match.
Resumo:
Observing the working procedure of construction workers is an effective means of maintaining the safety performance of a construction project. It is also difficult to achieve due to a high worker-to-safety-officer ratio. There is an imminent need for the development of a tool to assist in the real-time monitoring of workers, in order to reduce the number of construction accidents. The development and application of a real time locating system (RTLS) based on the Chirp Spread Spectrum (CSS) technique is described in this paper for tracking the real-time position of workers on construction sites. Experiments and tests were carried out both on- and off-site to verify the accuracy of static and dynamic targets by the system, indicating an average error of within one metre. Experiments were also carried out to verify the ability of the system to identify workers’ unsafe behaviours. Wireless data transfer was used to simplify the deployment of the system. The system was deployed in a public residential construction project and proved to be quick and simple to use. The cost of the developed system is also reported to be reasonable (around 1800USD) in this study and is much cheaper than the cost of other RTLS. In addition, the CCS technique is shown to provide an economical solution with reasonable accuracy compared with other positioning systems, such as ultra wideband. The study verifies the potential of the CCS technique to provide an effective and economical aid in the improvement of safety management in the construction industry.
Resumo:
This paper presents a multi-criteria based approach for nondestructive diagnostic structural integrity assessment of a decommissioned flatbed rail wagon (FBRW) used for road bridge superstructure rehabilitation and replacement applications. First, full-scale vibration and static test data sets are employed in a FE model of the FBRW to obtain the best ‘initial’ estimate of the model parameters. Second, the ‘final’ model parameters are predicted using sensitivity-based perturbation analysis without significant difficulties encountered. Consequently, the updated FBRW model is validated using the independent sets of full-scale laboratory static test data. Finally, the updated and validated FE model of the FBRW is used for structural integrity assessment of a single lane FBRW bridge subjected to the Australian bridge design traffic load.
Resumo:
This thesis examined the long-term impact of the community arts education project Yonder, a collaboration between Education Queensland and Queensland Performing Arts Centre. The findings from the data reveal that the project was still having impact twelve months after its completion and that in some instances the project served as a 'circuit-breaker', especially for special needs students and struggling students. The intervention of a rich arts project proved to be an opportunity for these students to learn in a different way and to perceive themselves in a new and reinvented light. This confidence was found to transfer into other aspects of their learning.
Resumo:
Objectives The purpose of this study was to identify the structural quality of care domains and to establish a set of structural quality indicators (SQIs) for the assessment of care of older people with cognitive impairment in emergency departments (EDs). Methods A structured approach to SQI development was undertaken including: 1) a comprehensive search of peer-reviewed and gray literature focusing on identification of evidence-based interventions targeting structure of care of older patients with cognitive impairment and existing SQIs; 2) a consultative process engaging experts in the care of older people and epidemiologic methods (i.e., advisory panel) leading to development of a draft set of SQIs; 3) field testing of drafted SQIs in eight EDs, leading to refinement of the SQI set, and; 4) an independent voting process among the panelists for SQI inclusion in a final set, using preestablished inclusion and exclusion criteria. Results At the conclusion of the process, five SQIs targeting the management of older ED patients with cognitive impairment were developed: 1) the ED has a policy outlining the management of older people with cognitive impairment during the ED episode of care; 2) the ED has a policy outlining issues relevant to carers of older people with cognitive impairment, encompassing the need to include the (family) carer in the ED episode of care; 3) the ED has a policy outlining the assessment and management of behavioral symptoms, with specific reference to older people with cognitive impairment; 4) the ED has a policy outlining delirium prevention strategies, including the assessment of patients' delirium risk factors, and; 5) the ED has a policy outlining pain assessment and management for older people with cognitive impairment. Conclusions This article presents a set of SQIs for the evaluation of performance in caring for older people with cognitive impairment in EDs.
Resumo:
Cold-formed steel members have been widely used in residential and commercial buildings as primary load bearing structural elements. They are often made of thin steel sheets and hence they are more susceptible to local buckling. The buckling behaviour of cold-formed steel compression members under fire conditions is not fully investigated yet and hence there is a lack of knowledge on the fire performance of cold-formed steel compression members. Current cold-formed steel design standards do not provide adequate design guidelines for the fire design of cold-formed steel compression members. Therefore a research project based on extensive experimental and numerical studies was undertaken to investigate the local buckling behaviour of light gauge cold-formed steel compression members under simulated fire conditions. First a series of 91 local buckling tests was conducted at ambient and uniform elevated temperatures up to 700oC on cold-formed lipped and unlipped channels. Suitable finite element models were then developed to simulate the behaviour of tested columns and were validated using test results. All the ultimate load capacity results for local buckling were compared with the predictions from the available design rules based on AS/NZS 4600, BS 5950 Part 5, Eurocode 3 Parts 1.2 and 1.3 and the direct strength method (DSM), based on which suitable recommendations have been made for the fire design of cold-formed steel compression members subject to local buckling at uniform elevated temperatures.
Resumo:
The Queensland Health implementation project failure is the largest IS failure in the southern hemisphere to date, costing $1.25 billion AUD. This case highlights the importance of systematically analysing project failure. It examines the case organization details, royal commission report, auditor general report and 118 witness statements pertaining to the Queensland Health implementation project. The objective of this teaching case is (1) to illustrate the factors that contributed to Queensland Health's disastrous implementation project and (2) to understand the broader applications of this project failure on state and national legislations as well as industry sectors. The case narrative and teaching notes are appropriate for both undergraduate and postgraduate students studying IS and project management subjects.
Resumo:
Collaborative community development project proposal
Resumo:
CoMFA and CoMSIA analysis were utilized in this investigation to define the important interacting regions in paclitaxel/tubulin binding site and to develop selective paclitaxel-like active compounds. The starting geometry of paclitaxel analogs was taken from the crystal structure of docetaxel. A total of 28 derivatives of paclitaxel were divided into two groups—a training set comprising of 19 compounds and a test set comprising of nine compounds. They were constructed and geometrically optimized using SYBYL v6.6. CoMFA studies provided a good predictability (q2 = 0.699, r2 = 0.991, PC = 6, S.E.E. = 0.343 and F = 185.910). They showed the steric and electrostatic properties as the major interacting forces whilst the lipophilic property contribution was a minor factor for recognition forces of the binding site. These results were in agreement with the experimental data of the binding activities of these compounds. Five fields in CoMSIA analysis (steric, electrostatic, hydrophobic, hydrogen-bond acceptor and donor properties) were considered contributors in the ligand–receptor interactions. The results obtained from the CoMSIA studies were: q2 = 0.535, r2 = 0.983, PC = 5, S.E.E. = 0.452 and F = 127.884. The data obtained from both CoMFA and CoMSIA studies were interpreted with respect to the paclitaxel/tubulin binding site. This intuitively suggested where the most significant anchoring points for binding affinity are located. This information could be used for the development of new compounds having paclitaxel-like activity with new chemical entities to overcome the existing pharmaceutical barriers and the economical problem associated with the synthesis of the paclitaxel analogs. These will boost the wide use of this useful class of compounds, i.e. in brain tumors as the most of the present active compounds have poor blood–brain barrier crossing ratios and also, various tubulin isotypes has shown resistance to taxanes and other antimitotic agents.
Resumo:
In today's high-pressure work environment, project managers are often forced to “do more with less.” We argue that this imperative can lead project managers to engage in either high-performance or abusive supervision behaviors. To understand this process, we develop a model and associated propositions linking a project manager's cognitive appraisal of project-related demands to high-performance work practices versus abusive supervision behaviors—both of which impact three project outcomes: stakeholder relationships, people-related project success factors, and employee well-being. We propose that the choice between high-performance work practices and abusive supervision behaviors is moderated by a project manager's personal resources (psychological capital, emotional intelligence, and dark triad personality).
Resumo:
A recurring feature of modern practice is occupational stress of project professionals, with both debilitating effects on the people concerned and indirectly affecting project success. Previous research outside the construction industry has involved the use of a psychology perceived stress questionnaire (PSQ) to measure occupational stress, resulting in the identification of one stressor – demand - and three sub-dimensional emotional reactions in terms of worry, tension and joy. The PSQ is translated into Chinese with a back translation technique and used in a survey of young construction cost professionals in China. Principal component analysis and confirmatory factor analysis are used to test the divisibility of occupational stress - little mentioned in previous research on stress in the construction context. In addition, structural equation modelling is used to assess nomological validity by testing the effects of the three dimensions on organizational commitment, the main finding of which is that lack of joy has the sole significant effect. The three-dimensional measurement framework facilitates the standardizing measurement of occupational stress. Further research will establish if the findings are also applicable in other settings and explore the relations between stress dimensions and other managerial concepts.
Resumo:
Enterprise Architecture Management (EAM) is discussed in academia and industry as a vehicle to guide IT implementations, alignment, compliance assessment, or technology management. Still, a lack of knowledge prevails about how EAM can be successfully used, and how positive impact can be realized from EAM. To determine these factors, we identify EAM success factors and measures through literature reviews and exploratory interviews and propose a theoretical model that explains key factors and measures of EAM success. We test our model with data collected from a cross-sectional survey of 133 EAM practitioners. The results confirm the existence of an impact of four distinct EAM success factors, ‘EAM product quality’, ‘EAM infrastructure quality’, ‘EAM service delivery quality’, and ‘EAM organizational anchoring’, and two important EAM success measures, ‘intentions to use EAM’ and ‘Organizational and Project Benefits’ in a confirmatory analysis of the model. We found the construct ‘EAM organizational anchoring’ to be a core focal concept that mediated the effect of success factors such as ‘EAM infrastructure quality’ and ‘EAM service quality’ on the success measures. We also found that ‘EAM satisfaction’ was irrelevant to determining or measuring success. We discuss implications for theory and EAM practice.