823 resultados para Arts Management Queensland Brisbane


Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is a widespread recognition to the need of better manage municipal property in most cities in the world. Structural problems across regional, state, and territorial governments that have legal powers to own and maintain real property are similar, regardless of the level of development of each country. Start from a very basic level of property inventory records. The need for better manage to the local government owned property is the result of widespread decentralisation initiatives that often have devolved huge property portfolios from central to local governments almost “overnight”. At the same time municipal or regional governments were and continue to be unprepared to deal with multiple issues related to the role of property owners and managers. The lack of discussion of public asset management especially the elements that should be incorporated in the framework creates an important challenge to study the discipline of public asset management further. The aim of this paper is to study the practices of public asset management in developed countries, especially the elements of public asset management framework, and its transferability to developing countries. A case study was selected and conducted to achieve this aim. They involved interviews and a focus group. The study found that in public asset management framework, proper asset identification, public asset needs analysis, asset life cycle and performance measurements are an important element that should be incorporated in the framework. Those elements are transferable and applicable to developing countries’ local governments. Finally, findings from this study provide useful input for the local government policy makers, scholars and asset management practitioners to establish a public asset management framework toward more efficient and effective local governments in managing their assets as well as increasing public services quality.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Survival probability prediction using covariate-based hazard approach is a known statistical methodology in engineering asset health management. We have previously reported the semi-parametric Explicit Hazard Model (EHM) which incorporates three types of information: population characteristics; condition indicators; and operating environment indicators for hazard prediction. This model assumes the baseline hazard has the form of the Weibull distribution. To avoid this assumption, this paper presents the non-parametric EHM which is a distribution-free covariate-based hazard model. In this paper, an application of the non-parametric EHM is demonstrated via a case study. In this case study, survival probabilities of a set of resistance elements using the non-parametric EHM are compared with the Weibull proportional hazard model and traditional Weibull model. The results show that the non-parametric EHM can effectively predict asset life using the condition indicator, operating environment indicator, and failure history.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the global knowledge economy, knowledge-intensive industries and knowledge workers are extensively seen as the primary factors to improve the welfare and competitiveness of cities. To attract and retain such industries and workers, cities produce knowledge-based urban development strategies, and therefore such strategising has become an important development mechanism for cities and their economies. The paper discusses the critical connections between knowledge city foundations and integrated knowledge-based urban development mechanisms in both the local and regional level. In particular, the paper investigates Brisbane’s knowledge-based urban development strategies that support gentrification, attraction, and retention of investment and talent. Furthermore, the paper develops a knowledge-based urban development assessment framework to provide a clearer understanding of the local and regional policy frameworks, and relevant applications of Brisbane’s knowledge-based urban development experience, in becoming a prosperous knowledge city. The paper, with its knowledge-based urban development assessment framework, scrutinises Brisbane’s four development domains in detail: economy; society; institutional; built and natural environments. As part of the discussion of the case study findings, the paper describes the global orientation of Brisbane within the frame of regional and local level knowledge-based urban development strategies performing well. Although several good practices from Brisbane have already been internationally acknowledged, the research reveals that Brisbane is still in the early stages of its knowledge-based urban development implementation. Consequently, the development of a monitoring system for all knowledge-based urban development at all levels is highly crucial in accurately measuring the success and failure of specific knowledge-based urban development policies, and Brisbane’s progress towards a knowledge city transformation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Tourism development is a priority for rural and regional areas of Australia. The challenge is how to develop the tourism industry in a sustainable manner. As part of a larger project investigating community perceptions of opportunities, strategies and challenges in regional sustainable development, this article explores participant's views and opinions of tourism development. Through purposive sampling, 28 local community leaders and residents in the Darling Downs region in Queensland, Australia, participated in four semi-structured focus groups. This paper focuses on two of these focus groups, where tourism was a critical issue. Participants were generally positive about the tourism industry and its impacts on their community, although they expressed several triple bottom line concerns about economic, environmental and scoial issues. Four key themes emerged: appropriate land use management, limited resources and ageing/insufficient infrastructure, preservaation of community heritage and lifestyle, and regional conflict. Residents supported sustainable tourism development and wanted to be more actively involved in decision-making, demanding greater transparency - and true engagement - from local government.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Australia, road crash trauma costs the nation A$15 billion annually whilst the US estimates an economic impact of around US$ 230 billion on its network. Worldwide economic cost of road crashes is estimated to be around US$ 518 billion each year. Road accidents occur due to a number of factors including driver behaviour, geometric alignment, vehicle characteristics, environmental impacts, and the type and condition of the road surfacing. Skid resistance is considered one of the most important road surface characteristics because it has a direct effect on traffic safety. In 2005, Austroads (the Association of Australian and New Zealand Road Transport and Traffic Authorities) published a guideline for the management of skid resistance and Queensland Department of Main Roads (QDMR) developed a skid resistance management plan (SRMP). The current QDMR strategy is based on rationale analytical methodology supported by field inspection with related asset management decision tools. The Austroads’s guideline and QDMR's skid resistance management plan have prompted QDMR to review its skid resistance management practice. As a result, a joint research project involving QDMR, Queensland University of Technology (QUT) and the Corporative Research Centre for Integrated Engineering Asset Management (CRC CIEAM) was formed. The research project aims at investigating whether there is significant relationship between road crashes and skid resistance on Queensland’s road networks. If there is, the current skid resistance management practice of QDMR will be reviewed and appropriate skid resistance investigatory levels will be recommended. This paper presents analysis results in assessing the relationship between wet crashes and skid resistance on Queensland roads. Attributes considered in the analysis include surface types, annual average daily traffic (AADT), speed and seal age.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Studies indicate project success should be viewed from the different perspectives of the individual stakeholders. Project managers are owner’s agents. In order to allow early corrective actions to take place in case a project is diverted from plan, to accurately report perceived success of the stakeholders by project managers is essential, though there has been little systematic research in this area. The aim of this paper is to report the findings of an empirical study that compares the level of alignment between project managers and key stakeholders on a list of project performance indicators. A telephone survey involving 18 complex project managers and various key project stakeholder groups was conducted in this study. Krippendorff’s Kappa alpha reliability test was used to assess the alignment levels between project managers and stakeholders. Despite the overall agreement level between project manager and stakeholders is only medium; results have also identified 12 performance indicators that have significant level of agreement between project managers and stakeholders.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The need to better understand and deal with workplace stress has major implications for the construction industry, especially on a project level, because of its potential to directly impact on site productivity and safety, and ultimately, the achievement of project objectives. While there has been some understanding of the effect of workplace stress within the construction industry, the majority of these studies have explored individual determinants of workplace stress among construction professionals such as architects, engineers, quantity surveyors etc. To date, very little research has focused on workplace stress as encountered by construction site operatives. This is an important research deficiency as construction site operatives typically make up a significant percentage of on-site workforce and contribute most directly to project success. To address this imbalance in research, this paper proposes a theoretical framework to better understand site operatives’ experience of stress from a cultural perspective on three levels: individual, project and organizational which has been largely neglected in previous studies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Report for City Design, for Environment and Parks, within the Brisbane City Council. Context of this Project A Conservation Study for the Old Brisbane Botanic Gardens, formerly called the Brisbane City Botanic Gardens, was finalised in 1995 and prepared by Jeannie Sim for the Landscape Section of Brisbane City Council, the same author of the present report. This unpublished report was the first conservation plan prepared for the place and it was recommended that it be reviewed in five years time. That time has arrived finally with the preparation of the 2005 Review. The present project was commissioned by City Design on behalf of Environment and Parks Section of Brisbane City Council. The author has purposely chosen to call the study site the 'Old Brisbane Botanic Gardens' (OBBG) to differentiate it from the Brisbane Botanic Gardens, Mt. Coot-tha (BBG-MC), and to maintain the claim for this original garden to remain as a botanic garden for Brisbane. This name immediately brings to mind an association with history, as in the precedent set by the naming of the nearby 'Old Government House' at Gardens Point.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report uses data from the first two years of the CAUSEE study and focuses on the role of family in new business start-ups. While CAUSEE was not designed specifically to probe deeply into family matters the study does reveal interesting information on family orientated aspects including parental role models, family involvement on the start-up team, and family as a source of funding and advice. These findings can also be related to other information gathered as part of the comprehensive phone interviews that are used to gather the research data for CAUSEE. Furthermore we are also able to compare firm founders and 'Regular' nascent firm and young firm start-ups with their 'High Potential' counterparts in terms of their degrees of family involvement. Unless otherwise stated any differences or effects we comment on are 'statistically significant' at the five per cent level - that is, they are likely to reflect true differences or effects in the entire population of Australian start-ups.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Various countries have been introducing sustainable assessment tools for real estate design to produce integrated sustainability components not just for the building, but also the landscape component of the development. This paper aims to present the comparison between international and local assessment tools of landscape design for housing estate developments in Bangkok Metropolitan Region (BMR), Thailand. The methodologies used are to review, then compare and identify discrepancy indicators among the tools. This paper will examine four international tools; LEED for Neighbourhood Development (LEED – ND) of United State of America (USA), EnviroDevelopment standards of Australia, Residential Landscape Sustainability of United Kingdom (UK) and Green Mark for Infrastructure of Singapore; and three BMR’s existing tools; Land Subdivision Act B.E. 2543, Environmental Impact Assessment Monitoring Awards (EIA-MA) and Thai’s Rating for Energy and Environmental Sustainability of New construction and major renovation (TREES-NC). The findings show that there are twenty two elements of three categories which are neighbourhood design, community management, and environmental condition. Moreover, only one element in neighbourhood designs different between the international and local tools. The sustainable assessment tools have existed in BMR but they are not complete in only one assessment tool. Thus, the development of new comprehensive assessment tool will be necessary in BMR; however, it should meet the specific environment and climate condition for housing estate development at BMR.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The use of feedback technologies, in the form of products such as Smart Meters, is increasingly seen as the means by which 'consumers' can be made aware of their patterns of resource consumption, and to then use this enhanced awareness to change their behaviour to reduce the environmental impacts of their consumption. These technologies tend to be single-resource focused (e.g. on electricity consumption only) and their functionality defined by persons other than end-users (e.g. electricity utilities). This paper presents initial findings of end-users' experiences with a multi-resource feedback technology, within the context of sustainable housing. It proposes that an understanding of user context, supply chain management and market diffusion issues are important design considerations that contribute to technology 'success'.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry plays a substantial role in a country’s national economy, irrespective of the country’s levels of economic development. The Malaysian Government has given a much needed boost to the country’s construction projects under the 9th Malaysian Plan where a total of 880 projects worth RM15billion (US$48billion) is to be tendered (The Star, 2006). However, Malaysia has not escaped the problems of project failure. In 2005, 17.3% of 417 Malaysian government contracts projects were considered “sick”. Project procurement is one of the most important stages of project delivery. Even though ethics in project procurement has been identified as one of the contributors to project failure, it has not been systematically studied before from the perspective of client in Malaysia. The aim of this paper is to present an exploration to the ethical issues in project procurement in Malaysian public sector projects. By exploring ethical issues from client perspective, this could provide an ethical standpoint for the project life cycle and could maintain a good affiliation between the clients and the customers. It is expected that findings from this review will be somewhat representative of other developing countries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper provides an overview of the current QUT Spatial Science undergraduate program based in Brisbane, Queensland, Australia. It discusses the development and implementation of a broad-based educational model for the faculty of built environment and engineering courses and specifically to the course structure of the new Bachelor of Urban Development (Spatial Science) study major. A brief historical background of surveying courses is discussed prior to the detailing of the three distinct and complementary learning themes of the new course structure with a graphical course matrix. Curriculum mapping of the spatial science major has been undertaken as the course approaches formal review in late 2010. Work-integrated learning opportunities have been embedded into the curriculum and a brief outline is presented. Some issues relevant to the tertiary surveying/ spatial sector are highlighted in the context of changing higher education environments in Australia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Polarising the issue of governance is the increasingly acknowledged role of airports in regional economic development, both as significant sources of direct employment and as attractants of commerce through enhanced mobility (Vickerman, Spiekermann & Wegener 1999; Hakfoort, Poot & Rietveld 2001). Most airports were once considered spatially removed from their cities, but as cities have expanded their airports no longer sit distinct of the urban environment. This newfound spatial proximity means that decisions for land use and development on either city or airport land are likely to have impacts that affect one another in either or both the short- or long-term (Stevens, Baker and Freestone 2007). These impacts increase the demand for decision making to find ways of integrating strategies for future development to ensure that airport developments do not impede the sustainable growth of its city, and likewise that city developments do not impede the sustainable growth of its airport (Gillen 2006). However questions of how, under what conditions, and to what extent decision making integration might be suitable for “airport regions” are yet to be explored let alone answered.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.