196 resultados para mechanical damages


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A diagnostic method based on Bayesian Networks (probabilistic graphical models) is presented. Unlike conventional diagnostic approaches, in this method instead of focusing on system residuals at one or a few operating points, diagnosis is done by analyzing system behavior patterns over a window of operation. It is shown how this approach can loosen the dependency of diagnostic methods on precise system modeling while maintaining the desired characteristics of fault detection and diagnosis (FDD) tools (fault isolation, robustness, adaptability, and scalability) at a satisfactory level. As an example, the method is applied to fault diagnosis in HVAC systems, an area with considerable modeling and sensor network constraints.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Molecular dynamics (MD) simulations have been carried out to investigate the defect’s effect on the mechanical properties of single-crystal copper nanowire with different surface defects, under torsion deformation. The torsional rigidity is found insensitive to the surface defects and the critical angle appears an obvious decrease due to the surface defects, the largest decrease is found for the nanowire with surface horizon defect. The deformation mechanism appears different degrees of influence due to surface defects. The surface defects play a role of dislocation sources. Comparing with single intrinsic stacking faults formation for the perfect nanowire, much affluent deformation processes have been activated because of surface defects, for instance, we find the twins formation for the nanowire with a surface 45o defect.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Zheng v Cai (2009) 261 ALR 481 the High Court had to determine whether voluntary payments made to the appellant by a third party were to be taken into account when assessing a claim for damages for personal injury.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Gagner Pty t/as Indochine Café v Canturi Corporation Pty Ltd (2009) 262 ALR 691, the assessment of damages awarded for the rectification work to the premises of the respondent was in issue. The appellant operated a restaurant above the respondent’s jewellery store in Sydney. When the kitchen of the restaurant flooded, water escaped causing damage to the jewellery store’s fit-out. The escape of the water was held to be due to the negligence of persons for whom the appellant was vicariously liable. The trial judge awarded damages, measured by the amount required to return the premises as close as was possible to the condition prior to the flood damage as well as an allowance for interruption to the business for 10 days. The 10 day allowance reflected the number of days the store would have been closed for if it was to be returned to its previous condition. The evidence was that the flooding has only affected approximately 10% of the floor area of the store. However, instead of having work carried out to bring the premises back to its condition as before the water damage, the respondent closed the business for 29 working days for a complete internal refurbishment – at a cost substantially more than simple rectification. On appeal it was argued that the trial judge had assessed the damages incorrectly as by undertaking a complete refurbishment had the effect that the respondent did not suffer any loss as a consequence of the negligence in relation to the fit-out. It was asserted that the claim for damages was in the circumstances a claim for betterment. It was also argued that the damages should not include a component for GST. Campbell JA gave reasons, with Macfarlan JA and Sackville AJA agreeing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Project Management Company No 2 Pty Ltd v Cushway Blackford & Associates Pty Ltd [2011] QCA 102 the appellant sought leave to join its parent company party (Project Management Company No 1) as a plaintiff to the proceedings and to amend its statement of claim. It was argued that the parent company had suffered the loss claimed in the proceedings, rather than the appellant. Rule 69(1)(b)(ii) of the Uniform Civil Procedure Rules 1999 (Qld) allows a court at any stage of the proceeding to order that ‘a person whose presence before the court would be desirable, just and convenient to enable the court to adjudicate effectually and completely on all matters in dispute connected with the proceeding’ be include as a party. To determine this issue, the Court of Appeal had to review the law relevant to the proceedings – a claim in negligence for pure economic loss, in particular, the principles espoused by the High Court in Bryan v Maloney(1995) 182 CLR 609 and Woolcock Street Investments Pty Ltd v CDG Pty Ltd (2004) 216 CLR 515.