68 resultados para Waste valorization


Relevância:

20.00% 20.00%

Publicador:

Resumo:

On the basis of the growing interest on the impact of airborne particles on human exposure as well as the strong debate in Western countries on the emissions of waste incinerators, this work reviewed existing literature to: (i) show the emission factors of ultrafine particles (particles with a diameter less than 100 nm) of waste incinerators, and; (ii) assess the contribution of waste incinerators in terms of ultrafine particles to exposure and dose of people living in the surrounding areas of the plants in order to estimate eventual risks. The review identified only a limited number of studies measuring ultrafine particle emissions, and in general they report low particle number concentrations at the stack (the median value was equal to 5.5×103 part cm-3), in most cases higher than the outdoor background value. The lowest emissions were achieved by utilization of the bag-house filter which has an overall number-based filtration efficiency higher than 99%. Referring to reference case, the corresponding emission factor is equal to 9.1×1012 part min-1, that is lower than one single high-duty vehicle. Since the higher particle number concentrations found in the most contributing microenvironments to the exposure (indoor home, transportation, urban outdoor), the contribution of the waste incinerators to the daily dose can be considered as negligible.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since 2003, Mainland China has been promoting the public–private partnership (PPP) procurement model in the waste-to-energy incineration sector to reduce the waste burying rate and improve environmental quality. Five critical risk factors (CRFs) that affect the construction and operation of waste-to-energy incineration projects have been identified from real-life risk events of 14 PPP waste-to-energy incineration plants through content analysis. These risk factors are insufficient waste supply, disposal of non-licensed waste, environmental risk, payment risk, and lack of supporting infrastructure. A recently completed PPP waste-to-energy incineration plant, the Shanghai Tianma project, was investigated to learn from the effective management of CRFs. First-hand data about the Shanghai Tianma project was collected, with a focus on project negotiation and concession agreement. Lessons learned about risk management were acquired. This paper presents a detailed study of the contractual structure, risk sharing scheme, risk response measures to CRFs, and project transfer of a PPP project. The study results will provide governments with management implications to prepare equitable concession agreements and benefit private investors by effectively mitigating and managing risks in future PPP waste-to-energy incineration projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Our predecessors taught us, ‘waste not, want not’ – if we did not waste anything we would always have enough. Unfortunately, we did not heed their sage advice. Over the last three centuries, human kind’s wastefulness, or lack of respect for the finite resources of this planet, has contributed to climate change and negatively impacted on ‘ecosystem services’ with a significant, irreversible loss of biodiversity...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Overprocessing waste occurs in a business process when effort is spent in a way that does not add value to the customer nor to the business. Previous studies have identied a recurrent overprocessing pattern in business processes with so-called "knockout checks", meaning activities that classify a case into "accepted" or "rejected", such that if the case is accepted it proceeds forward, while if rejected, it is cancelled and all work performed in the case is considered unnecessary. Thus, when a knockout check rejects a case, the effort spent in other (previous) checks becomes overprocessing waste. Traditional process redesign methods propose to order knockout checks according to their mean effort and rejection rate. This paper presents a more fine-grained approach where knockout checks are ordered at runtime based on predictive machine learning models. Experiments on two real-life processes show that this predictive approach outperforms traditional methods while incurring minimal runtime overhead.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Consumer driven food trends are nothing new. “Organics”, gluten-free, and more recently buying “local” have all captured consumers, encouraging supermarkets around the globe and in Australia to respond. But the next emerging European food trend that may have the biggest impact on what we buy each week is “ugly food”.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gas fermentation using acetogenic bacteria offers a promising route for the sustainable production of low carbon fuels and commodity chemicals from abundant, inexpensive C1 feedstocks including industrial waste gases, syngas, reformed methane or methanol. Clostridium autoethanogenum is a model gas fermenting acetogen that produces fuel ethanol and 2,3-butanediol, a precursor for nylon and rubber. Acetogens have already been used in large scale industrial fermentations, they are ubiquitous and known to play a prominent role in the global carbon cycle. Still, they are considered to live on the thermodynamic edge of life and potential energy constraints when growing on C1 gases pose a major challange for the commercial production of fuels and chemicals. We have developed a systematic platform to investigate acetogenic energy metabolism, exemplified here by experiments contrasting heterotrophic and autotrophic metabolism. The platform is built from complete omics technologies, augmented with genetic tools and complemented by a manually curated genome-scale mathematical model. Together the tools enable the design and development of new, energy efficient pathways and strains for the production of chemicals and advanced fuels via C1 gas fermentation. As a proof-of-platform, we investigated heterotrophic growth on fructose versus autotrophic growth on gas that demonstrate the role of the Rnf complex and Nfn complex in maintaining growth using the Wood–Ljungdahl pathway. Pyruvate carboxykinase was found to control the rate-limiting step of gluconeogenesis and a new specialized glyceraldehyde-3-phosphate dehydrogenase was identified that potentially enhances anabolic capacity by reducing the amount of ATP consumed by gluconeogenesis. The results have been confirmed by the construction of mutant strains.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

By examining corporate social responsibility (CSR) and power within the context of the food supply chain, this paper illustrates how food retailers claim to address food waste while simultaneously setting standards that result in the large-scale rejection of edible food on cosmetic grounds. Specifically, this paper considers the powerful role of food retailers and how they may be considered to be legitimately engaging in socially responsible behaviors to lower food waste, yet implement practices that ultimately contribute to higher levels of food waste elsewhere in the supply chain. Through interviews with key actors in the Australian fresh fruit and vegetable supply chain, we highlight the existence of a legitimacy gap in corporate social responsibility whereby undesirable behaviors are pushed elsewhere in the supply chain. It is argued that the structural power held by Australia’s retail duopoly means that supermarkets are able to claim virtuous and responsible behaviors, despite counter claims from within the fresh food industry that the food supermarkets’ private quality standards mean that fresh food is wasted. We argue that the supermarkets claim CSR kudos for reducing food waste at the expense of other supply chain actors who bear both the economic cost and the moral burden of waste, and that this is a consequence of supermarkets’ remarkable market power in Australia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction and demolition (C&D) waste have negative impacts on the environment. As a significant proportion of C&D waste is related to the design stage of a project, there is an opportunity for architects to reduce the waste. However, research suggests that many architects often do not understand the impact of their design on waste generation. Training and education are proposed by current researchers to improve architects’ knowledge; however, this has not been adequately validated as a viable approach to solving waste issues. This research investigates architects’ perceptions towards waste management in the design phase, and determines whether they feel they are adequately skilled in reducing C&D waste. Questionnaire surveys were distributed to architects from 98 architectural firms and 25 completed surveys were returned. The results show that while architects are aware of the relationship between design and waste, ‘extra time’ and ‘lack of knowledge’ are the key barriers to implementing waste reduction strategies. In addition, the majority of respondents acknowledge their lack of skill to reduce waste through design evaluation. Therefore, training programmes can be a viable strategy to enable them to address the pressing issue of C&D waste reduction.