284 resultados para Secure and Resilient Infrastructure
Resumo:
As a result of rapid urbanisation, population growth, changes in lifestyle, pollution and the impacts of climate change, water provision has become a critical challenge for planners and policy-makers. In the wake of increasingly difficult water provision and drought, the notion that freshwater is a finite and vulnerable resource is increasingly being realised. Many city administrations around the world are struggling to provide water security for their residents to maintain lifestyle and economic growth. This chapter reviews the global challenge of providing freshwater to sustain lifestyles and economic growth, and the contributing challenges of climate change, urbanisation, population growth and problems in rainfall distribution. The chapter proceeds to evaluate major alternatives to current water sources such as conservation, recycling and reclamation, and desalination. Integrated water resource management is briefly looked at to explore its role in complementing water provision. A comparative study on alternative resources is undertaken to evaluate their strengths, weaknesses, opportunities and constraints, and the results are discussed.
Resumo:
In an age when escalating fuel prices, global warming and world resource depletion are of great concern, sustainable transport practices promise to define a new way of mobility into the future. With its comparatively minimal negative environmental impacts, non reliance on fuels and positive health effects, the simple bicycle ofers significant benefits to humankind. These benefits are evident worldwide where bicycles are successfully endorsed through improved infrastructure, supporting policies, public education and management. In Australia, the national, state and locall governments are introducing measures to improve and support green transport. This is necessary as current bicycle infrastructure is not always sufficient and the longstanding conflict with motorized transport still exists. The aim for the future is to implement sustainable hard and soft bicycle infrastructure globally; the challenges of such a task can be illustrated by the city of Brisbane, Australia.
Resumo:
In recent years, local government infrastructure management practices have evolved from conventional land use planning to more wide ranging and integrated urban growth and infrastructure management approaches. The roles and responsibilities of local government are no longer simply to manage daily operational functions of a city and provide basic infrastructure. Local governments are now required to undertake economic planning, manage urban growth; be involved in major infrastructure planning; and even engage in achieving sustainable development objectives. The Brisbane Urban Growth model has proven initially successful to ensure timely and coordinated delivery of urban infrastructure. This model may be the first step for many local governments to move toward an integrated, sustainable and effective infrastructure management.
Resumo:
Australia is just one of many developed countries facing the challenge of delivering value for money in the provision of a substantial infrastructure pipeline amidst severe construction and private finance constraints. To help address this challenge, this chapter focuses on developing an understanding of the determinants of value at key procurement decision points that range from the make-or-buy decision, to buying in the context of market structures, including the exchange relationship and contractual arrangement decision. This understanding is based on theoretical pluralism and illustrated by research in the field of construction and maintenance, and in public-private partnerships.
Resumo:
Delivering infrastructure projects involves many stakeholders. Their responsibilities and authorities vary over the course of the project lifecycle - from establishing the project parameters and performance requirements, to operating and maintaining the completed infrastructure. To ensure the successful delivery of infrastructure projects, it is important for the project management team to identify and manage the stakeholders and their requirements. This chapter discusses the management of stakeholders in delivering infrastructure projects, from their conception to completion. It includes managing the stakeholders for project selection and involving them to improve project constructability, operability and maintainability.
Resumo:
In an atmosphere where civilization is progressing and becoming more aware of the consequences of careless development decisions, rethinking sustainable development - particularly sustainable urban and infrastructure development - has become an inevitable necessity. ------ ----- Rethinking Sustainable Development: Urban Management, Engineering, and Design considers the role of urban, regional and infrastructure planning in achieving sustainable urban and infrastructure development, providing insights into overcoming the consequences of unsustainable development. This companion volume to Sustainable Urban and Regional Infrastructure: Technology, Planning and Management, overviews all aspects of sustainable urban and infrastructure development.
Resumo:
Leg ulcers affect 55000-90000 people, predominantly aged over 65, in the UK at any one time. Traditional care, delivered in people’s homes by district nurses or in GP clinics, is costly and often not effective, with slow healing rates and a high incidence of recurrence. A social model of leg ulcer clinics developed by the author has been shown to improve healing and reduce recurrence within a highly cost-effective framework that delivers genuine patient empowerment, public health education and social outreach. This paper outlines the rationale for the Leg Club, its clinical and social impact, and the infrastructure behind it. It also considers the challenges to establishing and running a Leg Club.
Resumo:
Research in structural dynamics has received considerable attention due to problems associated with emerging slender structures, increased vulnerability of structures to random loads and aging infrastructure. This paper briefly describes some such research carried out on i) dynamics of composite floor structure, ii) dynamics of cable supported footbridge, iii) seismic mitigation of frame-shear wall structure using passive dampers and iv) development of a damage assessment model for use in structural health modelling.
Resumo:
Overloaded truck traffic is a significant problem on highways around the world. Developing countries in particular, overloaded truck traffic causes large amounts of unexpected expenditure in terms of road maintenance because of premature pavement damage. Overloaded truck traffic is a common phenomenon in developing countries, because of inefficient road management and monitoring systems. According to the available literature, many developing countries are facing the same problem, which is economic loss caused by the existence of overloaded trucks in the traffic stream. This paper summarizes the available literature, news reports, journal articles and traffic research regarding overloaded traffic. It examines the issue of overloading and the strategies and legislation used in developed countries.
Resumo:
This paper draws upon the Australian case to argue that the case for support for cultural production and cultural infrastructure has been strengthened overall by its alignment to economic policy goals. In this respect, the rise of creative industries policy discourses is consistent with trends in thinking about cultural policy that have their roots in the Creative Nation strategies of the early 1990s. In terms of the earlier discussion, cultural policy is as much driven by Schumpeterian principals as it is by Keynesian ones. Such an approach is not without attendant risks, and two stand out. The first is the risk of marginalizing the arts, through a policy framework that gives priority to developing the digital content industries, and viewing the creative industries as primarily an innovation platform. The second is that other trends in the economy, such as the strong Australian dollar resulting from the mining boom, undercuts the development of cultural production in the sections of the creative industries where international trade and investment is most significant, such as the film industry and computer games. Nonetheless, after over a decade of vibrant debate, this focus on linking the cultural and economic policy goals of the creative industries has come to be consistent with broader international trends in the field.
Resumo:
Historically, cities as urban forms have been critical to human development. In 1950, 30% of the world’s population lived in major cities. By the year 2000 this had increased to 47% with further expected growth to 50% by the end of 2007. Projections suggest that city-based densities will edge towards 60% of the global total by 2030. Such rapidly increasing urbanisation, in both developed and developing economies, challenges options for governance and planning, as well as crisis and disaster management. A common issue to the livability of cities as urban forms through time has been access to clean and reliable water supply. This is an issue that is particularly important in countries with arid ecosystems, such as Australia. This paper examines preliminary aspects, and theoretical basis, of a study into the resilience of the (potable) water supply system in Southeast Queensland (SEQ), an area with one of the most significant urban growth rates in Australia. The first stage will be to assess needs and requirements for gauging resilience characteristics of a generic water supply system, consisting of supply catchment, storage reservoir/s and treatment plant/s. The second stage will extend the analysis to examine the resilience of the SEQ water supply system incorporating specific characteristics of the SEQ water grid made increasingly vulnerable due to climate variability and projected impacts on rainfall characteristics and compounded by increasing demands due to population growth. Longer-term findings will inform decision making based on the application of the concept of resilience to designing and operating stand-alone and networked water supply infrastructure systems as well as its application to water resource systems more generally.
Resumo:
Teaching awards, grants and fellowships are strategies used to recognise outstanding contributions to learning and teaching, encourage innovation, and to shift learning and teaching from the edge to centre stage. Examples range from school, faculty and institutional award and grant schemes to national schemes such as those offered by the Australian Learning and Teaching Council (ALTC), the Carnegie Foundation for the Advancement of Teaching in the United States, and the Fund for the Development of Teaching and Learning in higher education in the United Kingdom. The Queensland University of Technology (QUT) has experienced outstanding success in all areas of the ALTC funding since the inception of the Carrick Institute for Learning and Teaching in 2004. This paper reports on a study of the critical factors that have enabled sustainable and resilient institutional engagement with ALTC programs. As a lens for examining the QUT environment and practices, the study draws upon the five conditions of the framework for effective dissemination of innovation developed by Southwell, Gannaway, Orrell, Chalmers and Abraham (2005, 2010): 1. Effective, multi-level leadership and management 2. Climate of readiness for change 3. Availability of resources 4. Comprehensive systems in institutions and funding bodies 5. Funding design The discussion on the critical factors and practical and strategic lessons learnt for successful university-wide engagement offer insights for university leaders and staff who are responsible for learning and teaching award, grant and associated internal and external funding schemes.
Resumo:
Determination of the placement and rating of transformers and feeders are the main objective of the basic distribution network planning. The bus voltage and the feeder current are two constraints which should be maintained within their standard range. The distribution network planning is hardened when the planning area is located far from the sources of power generation and the infrastructure. This is mainly as a consequence of the voltage drop, line loss and system reliability. Long distance to supply loads causes a significant amount of voltage drop across the distribution lines. Capacitors and Voltage Regulators (VRs) can be installed to decrease the voltage drop. This long distance also increases the probability of occurrence of a failure. This high probability leads the network reliability to be low. Cross-Connections (CC) and Distributed Generators (DGs) are devices which can be employed for improving system reliability. Another main factor which should be considered in planning of distribution networks (in both rural and urban areas) is load growth. For supporting this factor, transformers and feeders are conventionally upgraded which applies a large cost. Installation of DGs and capacitors in a distribution network can alleviate this issue while the other benefits are gained. In this research, a comprehensive planning is presented for the distribution networks. Since the distribution network is composed of low and medium voltage networks, both are included in this procedure. However, the main focus of this research is on the medium voltage network planning. The main objective is to minimize the investment cost, the line loss, and the reliability indices for a study timeframe and to support load growth. The investment cost is related to the distribution network elements such as the transformers, feeders, capacitors, VRs, CCs, and DGs. The voltage drop and the feeder current as the constraints are maintained within their standard range. In addition to minimizing the reliability and line loss costs, the planned network should support a continual growth of loads, which is an essential concern in planning distribution networks. In this thesis, a novel segmentation-based strategy is proposed for including this factor. Using this strategy, the computation time is significantly reduced compared with the exhaustive search method as the accuracy is still acceptable. In addition to being applicable for considering the load growth, this strategy is appropriate for inclusion of practical load characteristic (dynamic), as demonstrated in this thesis. The allocation and sizing problem has a discrete nature with several local minima. This highlights the importance of selecting a proper optimization method. Modified discrete particle swarm optimization as a heuristic method is introduced in this research to solve this complex planning problem. Discrete nonlinear programming and genetic algorithm as an analytical and a heuristic method respectively are also applied to this problem to evaluate the proposed optimization method.
Resumo:
Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and simultaneously delivering Value for Money (VfM). As background to this challenge, a brief review is given of current practice in the selection of major public sector infrastructure in Australia, along with a review of the related literature concerning the Multi-Attribute Utility Approach (MAUA) and the effect of MAUA on the role of risk management in procurement selection. To contribute towards addressing the key weaknesses of MAUA, a new first-order procurement decision making model is mentioned. A brief summary is also given of the research method and hypothesis used to test and develop the new procurement model and which uses competition as the dependent variable and as a proxy for VfM. The hypothesis is given as follows: When the actual procurement mode matches the theoretical/predicted procurement mode (informed by the new procurement model), then actual competition is expected to match optimum competition (based on actual prevailing capacity vis-à-vis the theoretical/predicted procurement mode) and subject to efficient tendering. The aim of this paper is to report on progress towards testing this hypothesis in terms of an analysis of two of the four data components in the hypothesis. That is, actual procurement and actual competition across 87 road and health major public sector projects in Australia. In conclusion, it is noted that the Global Financial Crisis (GFC) has seen a significant increase in competition in public sector major road and health infrastructure and if any imperfections in procurement and/or tendering are discernible, then this would create the opportunity, through the deployment of economic principles embedded in the new procurement model and/or adjustments in tendering, to maintain some of this higher level post-GFC competition throughout the next business cycle/upturn in demand including private sector demand. Finally, the paper previews the next steps in the research with regard to collection and analysis of data concerning theoretical/predicted procurement and optimum competition.
Resumo:
Subtropical south-east Queensland’s expanding population is expected to lead to a demand for an additional 754,000 dwellings by 2031. A legacy of poor housing design, minimal building regulations, an absence of building performance evaluation and various social and market factors has lead to a high and growing penetration of, and reliance on, air conditioners to provide comfort in this relatively benign climate. This reliance impacts on policy goals to adapt to and mitigate against global warming, electricity infrastructure investment and household resilience. Based on the concept of bioclimatic design, this field study scrutinizes eight non-air conditioned homes to develop a deeper understanding of the role of contemporary passive solar architecture in the delivery of thermally comfortable and resilient homes in the subtropics. These homes were found to provide inhabitants with an acceptable level of thermal comfort (18-28oC) for 77 – 97% of the year. Family expectations and experiences of comfort, and the various design strategies utilized were compared against the measured performance outcomes. This comparison revealed issues that limited quantification and implementation of design intent and highlighted factors that constrained system optimisation.