513 resultados para Public Research


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Wynne and Schaffer (2003) have highlighted both the strong growth of gambling activity in recent years, and the revenue streams this has generated for governments and communities. Gambling activities and the revenues derived from them have, unsurprisingly, therefore also been seen as a way in which to increase economic development in deprived areas (Jinkner-Lloyd, 1996). Consequently, according to Brown et al (2003), gambling is now a large taxation revenue earner for many western governments, at both federal and state levels, worldwide (for example UK, USA, Australia). In size and importance, the Australian gambling industry in particular has grown significantly over the last three decades, experiencing a fourfold increase in real gambling turnover. There are, however, also concerns expressed about gambling and Electronic Gaming in particular, as illustrated in economic, social and ethical terms in Oddo (1997). There are also spatial aspects to understanding these issues. Marshall’s (1998) study, for example, highlights that benefits from gambling are more likely to accrue at the macro as opposed to the local level, because of centralised tax gathering and spending of tax revenues, whilst localities may suffer from displacement of activities with higher multipliers than the institutions with EGMs that replace them. This also highlights a regional context of costs, where benefits accrue to the centre, but the costs accrue to the regions and localities, as simultaneously resources leave those communities through both the gambling activities themselves (in the form of revenue for the EGM owners), and the government (through taxes).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this research is to capture and interpret the stories of “outsider” managers who make the transition to the public sector. These experiences are considered in the context of efforts to shift public management culture in a direction consistent with meeting contemporary demands placed on public sector organisations. It is often noted that an important strategy for changing culture is the infusion of outsiders. Outsiders are thought to bring new perspectives that, through a dialectical process (Van de Ven 1995), create the potential for change. While there have been cross-sector comparisons (Broussine 1990; Silfvast 1994; Redman 1997), little attention has been given to the experience of those who make the transition in the context of efforts to reform public sector management culture. Not only is the infusion of private sector managers into the public sector a potential culture change strategy, it is also a personal experience for those who make the transition. Boundary crossing is typically an anxiety provoking experience (Van Maanen & Schein 1979) and the quality of this experience influences decisions to commit, engage, disengage or exit. The quality of the experience is likely to be affected by how the public organisation responds to people making this transition, that is, their investment in people processing (Saks 2007). The cost of recruitment and selection processes at middle and senior management levels warrants a greater research focus on this transition. In this paper we argue that the experiences of those who make the transition from private to public sectors has much to tell us about the traps that transition managers experience in making this change, the implications for injecting outsider managers as a strategy for achieving public management culture change, and how reform-oriented public organisations can manage the transitions of outsider managers into the public sector in order that best value might be achieved for both the individual and organisational change goals.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The paper explores the efficacy of public agencies using their contracting relationships with private firms to affect training outcomes in the construction industry. It develops a theoretical perspective on this issue by extending a framework that was originally developed by Hart, Schleifer and Vishny (1997) to study privatisation. This paper shows how their framework can also be applied to situations where the provision of public works is already privatised and the government is attempting to regulate training outcomes via a contracting arrangement. An empirical study of two training policies of the Western Australian government complements this theoretical discussion. We report the results of an analysis of data drawn from the government’s Tender Registration System between 1997 & 2006. As such we use a unique and comprehensive resource to examine the possible effects of new training policies on an important segment of the construction ‘market’.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Work environments have previously been studied to identify the strategies, structures and processes which increase the likelihood of creativity, innovation and collaboration for productive workplaces. A number of perspectives have emerged which identify social and cognitive factors known to contribute to or to restrict innovation and collaboration. Recently more attention has been given to designing physical environments to encourage processes relevant to innovation such as creativity (McCoy & Evans, 2002) knowledge sharing (Hemlin, Allwood & Martin, 2008) and collaboration (Bozeman & Corley, 2004). Some attention has been given specifically to research and development environments (Boutellier et al, 2008) but little integration of this research has occurred. In the context of the construction of new purpose-built premises which will bring together under one roof separate public sector agencies engaged in research and development in agriculture, natural resource systems and the environment, this paper examines the extant literature and develops initial propositions for research relevant to the transition, collaboration and performance of research and development in new organizational environments where traditional boundaries have been redrawn.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The decision as to which procurement system to adopt is a complex and challenging task for clients of construction projects. Despite a plethora of tools and techniques available for selecting a procurement method, clients are still uncertain about what method to adopt for a given construction project to achieve success. This paper examines ‘how and why’ procurement methods are selected by public sector clients in Queensland (QLD) and Western Australia (WA). Findings from workshops with senior managers in procurement selection revealed that traditional lump sum methods (TLS) are preferred even though alternative forms could be better suited for a given project. Participants of the workshops agreed that alternative procurement forms should be considered for projects but an embedded culture of uncertainty avoidance meant the selection of TLS methods. It was perceived that only a limited number of contractors operating in the marketplace have the resources and experience to deliver projects using the non-traditional methods.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Non-motorized public transport (NMPT), especially three-wheeler cycle rickshaws, has a long history in East Asia; and has long been a major transport planning issue. Policy measures to restrict or eliminate NMPT have already been implemented in many developing cities with mixed success. However given the economic, social and cultural significance of NMPT, its environmental benefits, and the magnitude of its role in sustaining the mobility needs of citizens, it is timely to reconsider the future role of NMPT. Rather than pursuing policies to eliminate NMPT, a better approach may be to integrate motorized and non-motorized vehicles as complementary rather than competitive forces. With this backdrop and given the international significance of the problem, this paper examines the current role and significance of NMPT using Dhaka as a case study, and sets a research agenda for the future of NMPT in a sustainable transport system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Community awareness and the perception on the traffic noise related health impacts have increased significantly over the last decade resulting in a large volume of public inquiries flowing to Road Authorities for planning advice. Traffic noise management in the urban environment is therefore becoming a “social obligation”, essentially due to noise related health concerns. Although various aspects of urban noise pollution and mitigation have been researched independently, an integrated approach by stakeholders has not been attempted. Although the current treatment and mitigation strategies are predominantly handled by the Road Agencies, a concerted effort by all stakeholders is becoming mandatory for effective and tangible outcomes in the future. A research project is underway a RMIT University, Australia, led by the second author to consider the use of “hedonic pricing” for alternative noise amelioration treatments within the road reserve and outside the road reserve. The project aims to foster a full range noise abatement strategy encompassing source, path and noise receiver. The benefit of such a study would be to mitigate the problem where it is most effective and would defuse traditional “authority” boundaries to produce the optimum outcome. The project is conducted in collaboration with the Department of Main Roads Queensland, Australia and funded by the CRC for Construction Innovation. As part of this study, a comprehensive literature search is currently underway to investigate the advancements in community health research, related to environmental noise pollution, and the advancements in technical and engineering research in mitigating the issue. This paper presents the outcomes of this work outlining state of the art, national and international good practices and gap analysis to identify major anomalies and developments.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Multi-outcomes Construction Policies research project, funded by the Cooperative Research Centre for Construction Innovation (Project 2006-036-A), sought to explore the costs and benefits of leveraging social outcomes on public construction contracts. The context of the research project was the trend towards the contracting out of public construction works and the attempts that have been made to use new contractual arrangements with construction companies to construction achieve a wide range of social outcomes. In federal and state jurisdictions it is now common for governments to impose a range of additional requirements on public works contractors that relate to broad social/community objectives. These requirements include commitments to train apprentices and trainees; to provide local and/or indigenous employment opportunities; to buy local materials; and to include art works. The cost and benefits of using public construction contracts to achieve social/community goals have, to our knowledge, not been thoroughly researched in an Australian context. This is likely to reflect in large part the relatively short history of contracting out public works. As Jensen and Stonecash (2004) explain, most previous empirical studies of contracting out have attempted to measure the cost savings achieved through privatization, as this was the focus of policy debate in the 1980s and 1990s. Relatively few studies have addressed the ability of contracting arrangements to ensure the delivery of desired ‘quality’ outcomes1, or the costs of achieving these outcomes via contracting arrangements. One of the potential costs of attempting to leverage social/community outcomes on public construction projects is a reduction in the amount of competition for these projects, with obvious consequences for average bid prices and choice. In jurisdictions, such as Western Australia and Queensland, where currently construction market conditions are already

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: The determination of the most appropriate procurement system for a capital works project is a challenging task for public sector clients considering the array of assessment criteria that are considered and the procurement methods that are available. This is particularly pertinent to the Western Australian public sector where they have had a propensity to use traditional lump sum as the default procurement solution despite knowing that the selection of an inappropriate procurement method may lead to cost and time overruns, claims, and disputes’ on projects. This paper presents a six step procurement method evaluation approach that requires public sector agencies to consider in detail an array of options so as to obtain value for money. Design/methodology/approach: A procurement evaluation approach is developed and is examined using a focus group of 12 participants comprising of a public sector client, project team and key stakeholders. The focus group was used to examine the developed approach in the context of a real-life capital works project. Findings: The procurement method evaluation approach was deemed to be pragmatic and enabled decision-makers to re-evaluate outcomes from previous steps in the process. All focus group participants stated the six step process enabled a recommendation that was grounded in reflection and detailed evaluation. Practical implications: The developed procurement approach has enabled the public sector client evaluate the way in which they view procurement method selection and examine how they obtain ‘value for money’. Originality/value: The six step procurement approach makes use of quantitative and qualitative techniques and is reliant on discourse and reflection in making a procurement method recommendation. Consequently, the approach enables public sector clients to account for the complexities often associated with procurement selection.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: Choosing the appropriate procurement system for construction projects is a complex and challenging task for clients particularly when professional advice has not been sought. To assist with the decision making process, a range of procurement selection tools and techniques have been developed by both academic and industry bodies. Public sector clients in Western Australia (WA) remain uncertain about the pairing of procurement method to bespoke construction project and how this decision will ultimately impact upon project success. This paper examines ‘how and why’ a public sector agency selected particular procurement methods. · Methodology/Approach: An analysis of two focus group workshops (with 18 senior project and policy managers involved with procurement selection) is reported upon · Findings: The traditional lump sum (TLS) method is still the preferred procurement path even though alternative forms such as design and construct, public-private-partnerships could optimize the project outcome. Paradoxically, workshop participants agreed that alternative procurement forms should be considered, but an embedded culture of uncertainty avoidance invariably meant that TLS methods were selected. Senior managers felt that only a limited number of contractors have the resources and experience to deliver projects using the nontraditional methods considered. · Research limitations/implications: The research identifies a need to develop a framework that public sector clients can use to select an appropriate procurement method. A procurement framework should be able to guide the decision-maker rather than provide a prescriptive solution. Learning from previous experiences with regard to procurement selection will further provide public sector clients with knowledge about how to best deliver their projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper uses the case study of a hybrid public-private strategic alliance as data to complement and contrast with the traditional views on knowledge transfer and learning between alliance partners. In particular, the paper explores whether the concept of competitive collaboration conceptualized by Hamel (1991) in his seminal work holds true for all forms of strategic alliances. Conceptualizing the knowledge boundaries of organisations in alliances as a ‘collaborative membrane’, we focus attention on the permeability of these boundaries rather than the actual location of the boundaries. In this vein, we present a case study of a major public sector organization that illustrates how these principles have allowed it to start rebuilding its internal capabilities adopting a more collaborative stance and ensuring their knowledge boundaries are highly porous as they move more major projects into hybrid public private alliance contracts.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Introduction: Schools provide the opportunity to reach a large number of adolescents in a systematic way however there are increasing demands on curriculum providing challenges for health promotion activities. This paper will describe the research processes and strategies used to design an injury prevention program.----- Methods: A multi-stage process of data collection included: (1) Surveys on injury-risk behaviours to identify targets of change (examining behaviour and risk/ protective factors among more than 4000 adolescents); (2) Focus groups (n= 30 high-risk adolescents) to understand and determine risk situations; (3) Hospital emergency outpatients survey to understand injury types/ situations; (4) Workshop (n= 50 teachers/ administrators) to understand the target curriculum and experiences with injury-risk behaviours; (5) Additional focus groups (students and teachers) regarding draft material and processes.----- Results: Summaries of findings from each stage are presented particularly demonstrating the design process. The baseline data identified target risk and protective factors. The following qualitative study provided detail about content and context and with the hospital findings assisted in developing ways to ensure relevance and meaning (e.g. identifying high risk situations and providing insights into language, culture and development). School staff identified links to school processes with final data providing feedback on curriculum fit, feasibility and appropriateness of resources. The data were integrated into a program which demonstrated reduced injury.----- Conclusions: A comprehensive research process is required to develop an informed and effective intervention. The next stage of a cluster randomised control trial is a major task and justifies the intensive and comprehensive development.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Despite the size and growth of the computer and video gaming industry – as well as the increasing use of the medium for the placement of advertising and product placement – researchers have neglected this area. By drawing on existing literature and research in similar and related areas of film product placement, sponsorship and interactivity, the authors present a conceptual overview and identify areas for research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Despite their increasing size and ease of access, the pornography and erotica industries have received scant attention from academics in the business disciplines. This paper examines what little research has been conducted and offers background material drawn from other disciplines on historical social approaches to pornography. These areas include sumptuary law and approaches to moral issues generally. The paper concludes with a suggested approach to determining a research agenda for this much neglected area.