63 resultados para Payment
Resumo:
This report summarises the findings of a case study on Queensland’s New Generation Rollingstock (NGR) Project carried out as part of SBEnrc Project 2.34 Driving Whole-of-life Efficiencies through BIM and Procurement. This case study is one of three exemplar projects studied in order to leverage academic research in defining indicators for measuring tangible and intangible benefits of Building Information Modelling (BIM) across a project’s life-cycle in infrastructure and buildings. The NGR is an AUD 4.4 billion project carried out under an Availability Payment Public-Private Partnership (PPP) between the Queensland Government and the Bomabardier-led QTECTIC consortium comprising Bombardier Transportation, John Laing, ITOCHU Corporation and Aberdeen Infrastructure Investments. BIM has been deployed on the project from conceptual stages to drive both design and the currently ongoing construction at the Wulkuraka Project Site. This case study sourced information from a series of semi-structured interviews covering a cross-section of key stakeholders on the project. The present research identified 25 benefits gained from implementing BIM processes and tools. Some of the most prominent benefits were those leading to improved outcomes and higher customer satisfaction such as improved communications, data and information management, and coordination. There were also a number of expected benefits for future phases such as: • Improved decision making through the use of BIM for managing assets • Improved models through BIM maturity • Better utilisation of BIM for procurement on similar future projects • New capacity to specify the content of BIM models within contracts There were also three benefits that were expected to have been achieved but were not realised on the NGR project. These were higher construction information quality levels, better alignment in design teams as well as project teams, and capability improvements in measuring the impact of BIM on construction safety. This report includes individual profiles describing each benefit as well as the tools and processes that enabled them. Four key BIM metrics were found to be currently in use and six more were identified as potential metrics for the future. This case study also provides insights into challenges associated with implementing BIM on a project of the size and complexity of the NGR. Procurement aspects and lessons learned for managers are also highlighted, including a list of recommendations for developing a framework to assess the benefits of BIM across the project life-cycle.
Resumo:
In Lupker v Shine Lawyers Pty Ltd [2015] QSC 278 Bond J considered the implications for a law practice in relation to its entitlement to recovery of its professional fees when the client terminates a no win no fee retainer.
Resumo:
We study the effect of affirmative action on effort in an experiment conducted in high schools in socioeconomically disadvantaged areas in Queensland, Australia. All participating schools have a large representation of indigenous Australians, a population group that is frequently targeted by affirmative action. Our participants perform a simple real-effort task in a competitive setting. Those ranked in the top third receive a high piece-rate payment and all the others receive a low payment. We introduce affirmative action by providing the lowest (bottom third) performers with a positive handicap increasing their chances to achieve the high payment target. Our findings show that the policy increases effort of those that it aims to favour, without discouraging effort of those who are indirectly penalized by affirmative action.