540 resultados para Infrastructure Projects


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Nowadays, most of the infrastructure development projects undertaken are complex in nature. Practically, public clients who do not have a good understanding of the design and management may suffer severe losses, especially for infrastructure projects. There is a need for luring the right consultant to secure client's investment in infrastructure developments. Throughout the project life cycle, consultants play vital role from the inception to completion stage of a project. A few studies in Malaysia show that infrastructure projects involving irrigation and drainage have experience problems such as poor workmanship, delay and cost overrun due to the consultant's inability or the client incompetence of recruiting consultants in time. This highlights the need of aided decision making and an efficient system to select the best consultant by using Decision Support System (DSS). On the other hand, recent trends reveal that most DSS in construction only concentrate on decision model development. These models are impractical and unused as they are complicated or difficult for laymen such as project managers to utilize. Thus, this research attempts to develop an efficient DSS for consultant selection namely consultDeSS. Driven by the motivation and research aims, this study deployed Design Science Research Methodology (DSRM) dominant with a combination of case studies at the Malaysian Department of Irrigation and Drainage (DID). Two real projects involving irrigation and drainage infrastructure were used to design, implement and evaluate the artefact. The 3-tier consultDeSS was revised after the evaluation and the design was significantly improved based on user feedback. By developing desirable tools that fit client's needs will enhance the productivity and minimize conflict within groups and organisations. The tool is more usable and efficient compared to previous studies in construction. Thus, this research has demonstrated a purposeful artefact with a practical and valid structured development approach that is applicable in a variety of problems in construction discipline.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Road infrastructure has been considered as one of the most expensive and extensive infrastructure assets of the built environment globally. This asset also impacts the natural environment significantly during different phases of life e.g. construction, use, maintenance and end-of-life. The growing emphasis for sustainable development to meet the needs of future generations requires mitigation of the environmental impacts of road infrastructure during all phases of life e.g. construction, operation and end-of-life disposal (as required). Life-cycle analysis (LCA), a method of quantification of all stages of life, has recently been studied to explore all the environmental components of road projects due to limitations of generic environmental assessments. The LCA ensures collection and assessment of the inputs and outputs relating to any potential environmental factor of any system throughout its life. However, absence of a defined system boundary covering all potential environmental components restricts the findings of the current LCA studies. A review of the relevant published LCA studies has identified that environmental components such as rolling resistance of pavement, effect of solar radiation on pavement(albedo), traffic congestion during construction, and roadway lighting & signals are not considered by most of the studies. These components have potentially higher weightings for environment damage than several commonly considered components such as materials, transportation and equipment. This paper presents the findings of literature review, and suggests a system boundary model for LCA study of road infrastructure projects covering potential environmental components.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Funded by an Australian Research Council (ARC) Linkage grant over four years (2009–13), the Major Infrastructure Procurement project sought to find more effective and efficient ways of procuring and delivering the nation’s social and economic infrastructure by investigating constraints relating to construction capacity, competition, and finance in new public sector major infrastructure.1 The research team comprised researchers in construction economics and finance from Queensland University of Technology (QUT), Griffith University (GU), The University of Hong Kong (UHK), and The University of Newcastle (UoN). Project partners included state government departments and agencies responsible for infrastructure procurement and delivery from all Australian mainland states, and private sector companies and peak bodies in the infrastructure sector (see “Introduction” for complete list). There are a number of major outcomes from this research project. The first of these is a scientifically developed decisionmaking model for procurement of infrastructure that deploys a novel and state-of-the-art integration of dominant microeconomic theory (including theories developed by two Nobel Prize winners). The model has been established through empirical testing and substantial experiential evidence as a valid and reliable guide to configuring procurement of new major and mega infrastructure projects in pursuance of superior Valuefor- Money (VfM). The model specifically addresses issues of project size, bundling of contracts, and exchange relationships. In so doing, the model determines the suitability of adopting a Public-Private Partnership (PPP) mode.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

There is an increasing awareness of sustainability and climate change and its impact on infrastructure and engineering asset management in design, construction, and operations. Sustainability rating tools have been proposed and/or developed that provide ratings of infrastructure projects in differing phases of their life cycle on sustainability. This paper provides an overview of decision support systems using sustainability rating framework that can be used to prioritize or select tasks and activities within projects to enhance levels of sustainability outcomes. These systems can also be used to prioritize projects within an organization to optimize sustainability outcomes within an allocated budget.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The expectation to integrate sustainability aspects (social, environmental, and economic success) into the design, delivery, and operation of infrastructure assets is growing rapidly and globally. There are now several tools and frameworks available to benchmark and measure sustainable performance of infrastructure projects and assets. This paper briefly describes the infrastructure sustainability (IS) rating tool developed by the Australian Green Infrastructure Council (AGIC) that was launched in February 2012. This tool evaluates sustainability initiatives and potential environmental, social, and economic impacts of infrastructure projects and assets. The rating tool provides the following benefits to industry: a common national language for sustainability; a vehicle for consistent application and evaluation of sustainability in tendering processes; assists in scoping whole-of-life sustainability risks, enabling smarter solutions that reduce risks and costs; fosters resource efficiency and waste reduction, reducing costs; fosters innovation and continuous improvement in sustainability outcomes; and builds an organization’s credentials and reputation in its approach to sustainability. The infrastructure types covered by this tool include transport, energy, water, and communication. The key themes of sustainability evaluation will be briefly presented in this paper, and they include management and governance; use of resources; emissions, pollution, and waste; ecology; people and place; and innovation.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose Performance heterogeneity between collaborative infrastructure projects is typically examined by considering procurement systems and their governance mechanisms at static points in time. The literature neglects to consider the impact of dynamic learning capability, which is thought to reconfigure governance mechanisms over time in response to evolving market conditions. This conceptual paper proposes a new model to show how continuous joint learning of participant organisations improves project performance. Design/methodology/approach There are two stages of conceptual development. In the first stage, the management literature is analysed to explain the Standard Model of dynamic learning capability that emphasises three learning phases for organisations. This Standard Model is extended to derive a novel Circular Model of dynamic learning capability that shows a new feedback loop between performance and learning. In the second stage, the construction management literature is consulted, adding project lifecycle, stakeholder diversity and three organisational levels to the analysis, to arrive at the Collaborative Model of dynamic learning capability. Findings The Collaborative Model should enable construction organisations to successfully adapt and perform under changing market conditions. The complexity of learning cycles results in capabilities that are imperfectly imitable between organisations, explaining performance heterogeneity on projects. Originality/value The Collaborative Model provides a theoretically substantiated description of project performance, driven by the evolution of procurement systems and governance mechanisms. The Model’s empirical value will be tested in future research.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Partial evaluation of infrastructure investments have resulted in expensive mistakes, unsatisfactory outcomes and increased uncertainties for too many stakeholders, communities and economies in both developing and developed nations. "Complex Stakeholder Perception Mapping" (CSPM), is a novel approach that can address existing limitations by inclusively framing, capturing and mapping the spectrum of insights and perceptions using extended Geographic Information Systems. Maps generated in CSPM offer presentations of flexibly combined, complex perceptions of stakeholders on multiple aspects of development. CSPM extends the applications of GIS software in non-spatial mapping and of Multi-Criteria Analysis with a multidimensional evaluation platform and augments decision science capabilities in addressing complexities. Application of CSPM can improve local and regional economic gains from infrastructure projects and aid any multi-objective and multi-stakeholder decision situations.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Green infrastructure is considered as a strategic approach to address the ecological and social impacts of urban sprawl. The main elements of green infrastructure have been well established and include a series of multifunctional ecological systems, such as green urban space, green road infrastructure and the links between these systems. However, it should be noted that the elements of green road infrastructure have only been briefly mentioned in isolated life cycle stages, e.g. design, procurement, construction, maintenance and operation. The definition of green road infrastructure and the elements in green road infrastructure projects remain largely unknown. To explore the elements in green road infrastructure, a critical review was adopted. As the development of green road infrastructure projects is guided by rating systems, a comparison of three major green roads rating systems, including GreenroadsTM, EnvisionTM and Infrastructure Sustainability Rating Tool—IS, was conducted. The comparison reveals that green roads can be defined as road projects that have superior performance in economic, social and environmental sustainability. The sustainability features in green roads mainly include environmental sustainability, social sustainability, economic sustainability, quality, pavement technology and innovation. The results will contribute to an increased understanding of green roads and will be useful to improve the performance of road projects on these sustainability features.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose: This chapter discusses the opportunity of Islamic project financing implementation for public infrastructure development in Indonesia. Design/Methodology/Approach: This chapter, firstly, reviewed existing literature on Islamic finance to explore the applicability of Islamic financing in infrastructure development. Interviews were conducted as the first stage of Delphi method approach. This was then followed by reviewing Indonesia’s government policies and regulations in infrastructure industry and Islamic financing. Findings: This chapter enlightens the implementation of Islamic financing on infrastructure project financing in Indonesia. The findings indicate that the government policies and regulations on both infrastructure investment and Islamic financing support the implementation of Islamic project financing, whereas, an improvement is still needed in order to overarch infrastructure business and Islamic financing investment. Research: Financing framework development for Indonesia infrastructure projects. Limitations/Implications: The result reported comprises the preliminary study of Islamic project paper written based on published research papers and interviews. Furthermore, the data collected for the study are limited to the case of Indonesian infrastructure projects. Practical Implication: Islamic financing in Indonesia infrastructure projects development has not been optimally implemented. Therefore, this chapter serves as a catalyst to explore alternative financial scheme such as Islamic financing for infrastructure development. Originality/Value: This chapter highlights possibilities and obstacles in applying Islamic scheme to infrastructure project financing. This provides a framework to analyse the steps to implement Islamic financing successfully in infrastructure development.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The design-build (DB) delivery method has been widely used in the United States due to its reputed superior cost and time performance. However, rigorous studies have produced inconclusive support and only in terms of overall results, with few attempts being made to relate project characteristics with performance levels. This paper provides a larger and more finely grained analysis of a set of 418 DB projects from the online project database of the Design-Build Institute of America (DBIA), in terms of the time-overrun rate (TOR), early start rate (ESR), early completion rate (ECR) and cost overrun rate (COR) associated with project type (e.g., commercial/institutional buildings and civil infrastructure projects), owners (e.g., Department of Defense and private corporations), procurement methods (e.g., ‘best value with discussion’ and qualifications-based selection), contract methods (e.g., lump sum and GMP) and LEED levels (e.g., gold and silver). The results show ‘best value with discussion’ to be the dominant procurement method and lump sum the most frequently used contract method. The DB method provides relatively good time performance, with more than 75% of DB projects completed on time or before schedule. However, with more than 50% of DB projects cost overrunning, the DB advantage of cost saving remains uncertain. ANOVA tests indicate that DB projects within different procurement methods have significantly different time performance and that different owner types and contract methods significantly affect cost performance. In addition to contributing to empirical knowledge concerning the cost and time performance of DB projects with new solid evidence from a large sample size, the findings and practical implications of this study are beneficial to owners in understanding the likely schedule and budget implications involved for their particular project characteristics.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Typically only a limited number of consortiums are able to competitively bid for Public Private Partnership (PPP) projects. Consequently, this may lead to oligopoly pricing constraints and ineffective competition, thus engendering ex ante market failure. In addressing this issue, this paper aims to determine the optimal number of bidders required to ensure a healthy level of competition is available to procure major infrastructure projects. The theories of Structure-Conduct-Performance (SCP) paradigm; Game Theory and Auction Theory and Transaction Cost Economics are reviewed and discussed and used to produce an optimal level of competition for major infrastructure procurement, that prevents market failure ex ante (lack of competition) and market failure ex post (due to asymmetric lock-in).

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Project evaluation is a process of measuring costs, benefits, risks and uncertainties for the purpose of decision-making by estimating and assessing impacts of the project to the community. The effects of impacts of toll roads are similar but different from the general non-tolled roads. Project evaluation methodologies are extensively studied and applied to various transport infrastructure projects. However, there is no definitive methodology to evaluate toll roads. This review discusses the impacts of toll roads then reviews the limitations of existing project evaluation methodologies when evaluating toll road impacts. The review identified gaps of knowledge of toll evaluations. First, the treatment of toll in project evaluation, particularly in Cost-Benefit Analysis requires further study to explore the appropriate methodology. Secondly, the project evaluation methodology needs to place strong emphasis on empirically based risk and uncertainty assessment. Addressing the limitations of the existing project evaluation methodologies leads to improvements of the methodology in practical level as well as fills the gap of knowledge of project evaluation for toll roads with respect to net impacts to the community.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Project evaluation is a process of measuring costs, benefits, risks and uncertainties for the purpose of decision-making by estimating and assessing impacts of the project to the community. The effects of impacts of toll roads are similar but different from the general non-tolled roads. Project evaluation methodologies are extensively studied and applied to various transport infrastructure projects. However, there is no definitive methodology to evaluate toll roads. This review discusses the impacts of toll roads then reviews the limitations of existing project evaluation methodologies when evaluating toll road impacts. The review identified gaps of knowledge of toll evaluations. First, the treatment of toll in project evaluation, particularly in Cost-Benefit Analysis requires further study to explore the appropriate methodology. Secondly, the project evaluation methodology needs to place strong emphasis on empirically based risk and uncertainty assessment. Addressing the limitations of the existing project evaluation methodologies leads to improvements of the methodology in practical level as well as fills the gap of knowledge of project evaluation for toll roads with respect to net impacts to the community.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A trip was undertaken to look at concerns of Public Works and Main Roads Departments of Queensland. David Paterson and Wayne Ganther from CSIRO travelled to the Sunshine Coast with Alan Carse of Queensland Department of Main Roads and Michael Ball of Queensland Department of Public Works. We were also joined for part of the visits by Ed Bowers of QBuild which is a commercial unit of Public Works responsible for maintenance of Public Works. During the trip we visited a bridge on the David Low Way at Sunrise Beach near Noosa. This bridge was in a serve marine environment with high salt content in the concrete and corrosion of the galvanised guardrails and barriers. Also the foreshore at Coolum was visited and the use of stainless steel was examined. This is discussed in this report. Most problems stemmed from incorrect specification due to lack of awareness of the severity of the environment. The companion report Visit to Schools Report 2002-059-B No 7. covers the visit to four schools north of Caloundra.