606 resultados para GSI (Grid Security Infrastructure)
Resumo:
Organizations generally are not responding effectively to rising IT security threats because people issues receive inadequate attention. The stark example of IT security is just the latest strategic IT priority demonstrating deficient IT leadership attention to the social dimension of IT. Universities in particular, with their devolved people organization, diverse adoption of IT, and split central/local federated approach to governance and leadership of IT, demand higher levels of interpersonal sophistication and strategic engagement from their IT leaders. An idealized model for IT leaders for the 21st century university is proposed to be developed as a framework for further investigation. The testing of this model in an action research study is proposed.
Resumo:
Identity-based cryptography has become extremely fashionable in the last few years. As a consequence many proposals for identity-based key establishment have emerged, the majority in the two party case. We survey the currently proposed protocols of this type, examining their security and efficiency. Problems with some published protocols are noted.
Resumo:
Supervisory Control And Data Acquisition (SCADA) systems are widely used in the management of critical infrastructure such as electricity and water distrubution systems. Currently there is little understanding of how to best protect SCADA systems from malicious attacks. We review the constraints and requirements for SCADA security and propose a suitable architecture (SKMA) for secure SCADA communications. The architecture includes a proposed key management protocol (SKMP). We compare the architecture with a previous proposal from Sandia Labs.
Resumo:
Access All was performance produced following a three-month mentorship in web-based performance that I was commissioned to conduct for the performance company Igneous. This live, triple-site performance event for three performers in three remote venues was specifically designed for presentation at Access Grid Nodes - conference rooms located around the globe equipped with a high end, open source computer teleconferencing technology that allowed multiple nodes to cross-connect with each other. Whilst each room was setup somewhat differently they all deployed the same basic infrastructre of multiple projectors, cameras, and sound as well as a reconfigurable floorspace. At that time these relatively formal setups imposed a clear series of limitations in terms of software capabilities and basic infrastructure and so there was much interest in understanding how far its capabilities might be pushed.----- Numerous performance experiments were undertaken between three Access Grid nodes in QUT Brisbane, VISLAB Sydney and Manchester Supercomputing Centre, England, culminating in the public performance staged simultaneously between the sites with local audiences at each venue and others online. Access All was devised in collaboration with interdisciplinary performance company Bonemap, Kelli Dipple (Interarts curator, Tate Modern London) and Mike Stubbs British curator and Director of FACT (Liverpool).----- This period of research and development was instigated and shaped by a public lecture I had earlier delivered in Sydney for the ‘Global Access Grid Network, Super Computing Global Conference’ entitled 'Performance Practice across Electronic Networks'. The findings of this work went on to inform numerous future networked and performative works produced from 2002 onwards.
Resumo:
Most departmental computing infrastructure reflects the state of networking technology and available funds at the time of construction, which converge in a preconceived notion of homogeneity of network architecture and usage patterns. The DMAN (Digital Media Access Network) project, a large-scale server and network foundation for the Hong Kong Polytechnic University's School of Design was created as a platform that would support a highly complex academic environment while giving maximum freedom to students, faculty and researchers through simplicity and ease of use. As a centralized multi-user computation backbone, DMAN faces an extremely hetrogeneous user and application profile, exceeding implementation and maintenance challenges of typical enterprise, and even most academic server set-ups. This paper sumarizes the specification, implementation and application of the system while describing its significance for design education in a computational context.
Resumo:
Urban infrastructure development in Korea has recently shifted from an old paradigm of conventional infrastructure planning to a new paradigm of intelligent infrastructure provision. This new paradigm, so called ubiquitous infrastructure, is based on a combination of urban infrastructure, information and communication technologies and digital networks. Ubiquitous infrastructure basically refers to an urban infrastructure where any citizen could access any infrastructure and services via any electronic device regardless of time and location. This paper introduces this new paradigm of intellectual infrastructure planning and its design schemes. The paper also examines the ubiquitous infrastructure development in Korea and discusses the positive effects of ubiquitous infrastructure on sustainable urban development.
Resumo:
Resulting from a series of student-run 'Edge' conferences that have been held in Australia and New Zealand (beginning at RMIT in 1983), The Mesh Book is a collection of essays grouped into themes of Invisible Infrastructures (systems of belief), Immanent Infrastructures (natural systems) and Present Infrastructures (roads and services). Ranging from esoteric discussions to analytical case studies, the book assembles a broad spectrum of ideas on the landscape within the context of Australia and a contemporary study of place.
Resumo:
Australia’s civil infrastructure assets of roads, bridges, railways, buildings and other structures are worth billions of dollars. Road assets alone are valued at around A$ 140 billion. As the condition of assets deteriorate over time, close to A$10 billion is spent annually in asset maintenance on Australia's roads, or the equivalent of A$27 million per day. To effectively manage road infrastructures, firstly, road agencies need to optimise the expenditure for asset data collection, but at the same time, not jeopardise the reliability in using the optimised data to predict maintenance and rehabilitation costs. Secondly, road agencies need to accurately predict the deterioration rates of infrastructures to reflect local conditions so that the budget estimates could be accurately estimated. And finally, the prediction of budgets for maintenance and rehabilitation must provide a certain degree of reliability. A procedure for assessing investment decision for road asset management has been developed. The procedure includes: • A methodology for optimising asset data collection; • A methodology for calibrating deterioration prediction models; • A methodology for assessing risk-adjusted estimates for life-cycle cost estimates. • A decision framework in the form of risk map
Resumo:
Both in developed and developing economies, major public funding is invested in civil infrastructure assets. Efficiency and comfort level of expected and demanded living standards are largely dependant on the management strategies of these assets. Buildings are one of the major & vital assets, which need to be maintained primarily to ensure its functionality by effective & efficient delivery of services and to optimize economic benefits. Not withstanding, public building infrastructure is not considered in Infrastructure report card published by Australian Infrastructure Report Card Alliance Partners (2001). The reason appears to be not having enough data to rate public building infrastructure. American Infrastructure Report Card (2001) gave “School Buildings” ‘d-’ rating, which is below ‘poor’. For effective asset management of building infrastructure, a need emerged to optimise the budget for managing assets, to cope up with increased user expectations, to response effectively to possible asset failures, to deal with ageing of assets and aging populations and to treat other scenarios including technology advancement and non-asset solutions. John (Asset Management, 2001) suggests that in the area of asset management worldwide, UK, Australia and New Zealand are leading.
Resumo:
Risks and uncertainties are inevitable in engineering projects and infrastructure investments. Decisions about investment in infrastructure such as for maintenance, rehabilitation and construction works can pose risks, and may generate significant impacts on social, cultural, environmental and other related issues. This report presents the results of a literature review of current practice in identifying, quantifying and managing risks and predicting impacts as part of the planning and assessment process for infrastructure investment proposals. In assessing proposals for investment in infrastructure, it is necessary to consider social, cultural and environmental risks and impacts to the overall community, as well as financial risks to the investor. The report defines and explains the concept of risk and uncertainty, and describes the three main methodology approaches to the analysis of risk and uncertainty in investment planning for infrastructure, viz examining a range of scenarios or options, sensitivity analysis, and a statistical probability approach, listed here in order of increasing merit and complexity. Forecasts of costs, benefits and community impacts of infrastructure are recognised as central aspects of developing and assessing investment proposals. Increasingly complex modelling techniques are being used for investment evaluation. The literature review identified forecasting errors as the major cause of risk. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. For risks that cannot be readily quantified, assessment techniques commonly include classification or rating systems for likelihood and consequence. The report outlines the system used by the Australian Defence Organisation and in the Australian Standard on risk management. After each risk is identified and quantified or rated, consideration can be given to reducing the risk, and managing any remaining risk as part of the scope of the project. The literature review identified use of risk mapping techniques by a North American chemical company and by the Australian Defence Organisation. This literature review has enabled a risk assessment strategy to be developed, and will underpin an examination of the feasibility of developing a risk assessment capability using a probability approach.
Resumo:
This report presents a summary of the research conducted by the research team of the CRC project 2002-005-C, “Decision support tools for concrete infrastructure rehabilitation”. The project scope, objectives, significance and innovation and the research methodology is outlined in the introduction, which is followed by five chapters covering different aspects of the research completed. Major findings of a review of literature conducted covering both use of fibre reinforced polymer composites in rehabilitation of concrete bridge structures and decision support frameworks in civil infrastructure asset management is presented in chapter two. Case study of development of a strengthening scheme for the “Tenthill Creek bridge” is covered in the third chapter, which summarises the capacity assessment, traditional strengthening solution and the innovative solution using FRP composites. The fourth chapter presents the methodology for development of a user guide covering selection of materials, design and application of FRP in strengthening of concrete structures, which were demonstrated using design examples. Fifth chapter presents the methodology developed for evaluating whole of life cycle costing of treatment options for concrete bridge structures. The decision support software tool developed to compare different treatment options based on reliability based whole of life cycle costing will be briefly described in this chapter as well. The report concludes with a summary of findings and recommendations for future research.