169 resultados para Construction and demolition waste


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background: Anecdotal evidence from the infrastructure and building sectors highlights issues of alcohol and other drugs (AODs) and its association with safety risk on construction sites. Currently, there is no clear evidence on the prevalence and risk of AOD use among Australian construction workers and there is limited evidential guidance regarding how to effectively address such an issue. Aims: The current research aims to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce. A nationally consistent and collaborative approach across the workforce will be adopted. Methods: A national assessment of the use of AODs was conducted in participating organisations across three states. The World Health Organisation’s Alcohol Use Disorders Identification Test (AUDIT) was used to measure alcohol use. Illicit drug use, ‘readiness to change’, impediments to reducing impairment, feasibility of proposed interventions, and employee attitudes and knowledge regarding AOD was also measured through a combination of survey items and interviews. Through an educative approach and consultation with employers, employees, union groups and leaders in applied AOD research, this assessment was used to inform and support cultural change management of AOD use in the industry. Results: Results (n=494) indicate that as in the general population, a proportion of those sampled in the construction sector may be at risk of hazardous alcohol consumption. A total of 286 respondents (58%) scored above the cut-off cumulative score for risky or hazardous alcohol use. Other drug use was also identified as a major issue. Interview responses and input from all project partners is presented within a guiding principle framework for cultural change. Conclusions: Results support the need for evidence-based, comprehensive and tailored responses in the workplace. This paper will discuss the final results in the context of facilitating cultural change in the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the increasing popularity and adoption of building information modeling (BIM), the amount of digital information available about a building is overwhelming. Enormous challenges remain however in identifying meaningful and required information from a complex BIM model to support a particular construction management (CM) task. Detailed specifications of information required by different construction domains and expressive and easy-to-use BIM reasoning mechanisms are seen as an important means in addressing these challenges. This paper analyzes some of the characteristics and requirements of component-specific construction knowledge in relation to the current work practice and BIM-based applications. It is argued that domain ontologies and information extraction approaches, such as queries could significantly bring much needed support for knowledge sharing and integration of information between design, construction and facility management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is increasing concern about the impact of employees’ alcohol and other drug (AOD) consumption on workplace safety, particularly within the construction industry. No known study has scientifically evaluated the relationship between the use of drugs and alcohol and safety impacts in construction, and there has been only limited adoption of nationally coordinated strategies, supported by employers and employees to render it socially unacceptable to arrive at a construction workplace with impaired judgment from AODs. This research aims to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce. Using the Alcohol Use Disorders Identification Test (AUDIT), the study will adopt both quantitative and qualitative methods to evaluate the extent of general AOD use in the industry. Results indicate that a proportion of the construction sector may be at risk of hazardous alcohol consumption. A total of 286 respondents (58%) scored above the cut-off score for risky alcohol use with 43 respondents (15%) scoring in the significantly ‘at risk’ category. Other drug use was also identified as a major issue that must be addressed. Results support the need for evidence-based, preventative educational initiatives that are tailored specifically to the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Australia is currently experiencing a resources boom and jobs in the male dominated fields of construction and engineering are at a premium. Employment in the construction industry, historically and today, is overwhelmingly male and, with an ageing population this predominately older male workforce will be retiring in greater numbers in the coming decade. Despite more that 25 years of anti- discrimination legislation and equal opportunity legislation these industries still employ few women in operational roles. This paper investigates the issue of the low representation of women in the construction industry. Our investigation involves the analysis of 95 organisation progress reports on the equal opportunity strategic programs in the construction industry. Findings indicate that this industry is not engaging with equal employment opportunity programs and further that equity outcomes for women in the industry are not evident.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry has an obligation to respond to sustainability expectations of our society. Solutions that integrate innovative, intelligent and sustainability deliverables are vital for us to meet new and emerging challenges. Industrialised Building Systems (IBS), or known otherwise as prefabrication, employs a combination of ready-made components in the construction of buildings. They promote quality of production, enhance simplification of construction processes and minimise waste. The unique characteristics of this construction method respond well to sustainability. Despite the promises however, IBS has yet to be effectively implemented in Malaysia. There are often misconceptions among key stakeholders about IBS applications. The existing rating schemes fail to assess IBS against sustainability measures. To ensure the capture of full sustainability potential in buildings developed, the critical factors and action plans agreeable to all participants in the development processes need to be identified. Through questionnaire survey, eighteen critical factors relevant to IBS sustainability were identified and encapsulated into a conceptual framework to coordinate a systematic IBS decision making approach. Five categories were used to separate the critical factors into: ecological performance; economic value; social equity and culture; technical quality; and implementation and enforcement. This categorisation extends the "Triple Bottom Lines" to include social, economic, environmental and institutional dimensions. Semi-structured interviews help identify strategies of actions and solutions of potential problems through a SWOT analysis framework. These tools help the decision-makers maximise the opportunities by using available strengths, avoid weaknesses, and diagnose possible threats in the examined issues. The recommendations formed an integrated action plan to present information on what and how to improve sustainability through tackling each critical factor during IBS development. It can be used as part of the project briefing documents for IBS designers. For validation and finalisation the research deliverables, three case studies were conducted. The research fills a current gap by responding to IBS project scenarios in developing countries. It also provides a balanced view for designers to better understand sustainability potential and prioritize attentions to manage sustainability issues in IBS applications.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The number of office building retrofit projects is increasing. These projects are characterised by processes which have a close relationship with waste generation and therefore demand a high level of waste management. In a preliminary study reported separately, we identified seven critical factors of on-site waste generation in office building retrofit projects. Through semi-structured interviews and Interpretive Structural Modelling, this research further investigated the interrelationships among these critical waste factors, to identify each factor’s level of influence on waste generation and propose effective solutions for waste minimization. “Organizational commitment” was identified as the fundamental issue for waste generation in the ISM system. Factors related to plan, design and construction processes were found to be located in the middle levels of the ISM model but still had significant impacts on the system as a whole. Based on the interview findings and ISM analysis results, some practical solutions were proposed for waste minimization in building retrofit projects: (1) reusable and adaptable fit-out design; (2) a system for as-built drawings and building information; (3) integrated planning for retrofitting work process and waste management; and (4) waste benchmarking development for retrofit projects. This research will provide a better understanding of waste issues associated with building retrofit projects and facilitate enhanced waste minimization.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Safety has long been a problem in the construction industry. Repair, maintenance, alteration and addition (RMAA) sector has emerged to play an important role in the construction industry. It accounted for 53% of the total construction market in Hong Kong in 2007. Safety performance of the RMAA words has been alarming. Statistics indicate that the percentage of fatal industrial accidents arising from RMAA work in Hong Kong was over 56% in 2006 while the remaining 44% was from new works. Effective safety measures to address the safety problems and improve safety performance of the RMAA sector are urgently needed. Unsafe behaviour has been attributed to one of the major causes of accidents. Traditional cost-benefit analysis of workers' safety behaviour seems to be inadequate. This paper proposes to adopt a game theoretical approach to analyse safety behaviour of RMAA workers. Game theory is concerned with the decision-making process in situations where outcomes depend upon choices made by one or more players. A game theoretical model between contractor and worker has been proffered. Mathematical analysis of this game model has been done and implications of the analysis have been discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Lean construction and building information modeling (BIM) are quite different initiatives, but both are having profound impacts on the construction industry. A rigorous analysis of the myriad specific interactions between them indicates that a synergy exists which, if properly understood in theoretical terms, can be exploited to improve construction processes beyond the degree to which it might be improved by application of either of these paradigms independently. Using a matrix that juxtaposes BIM functionalities with prescriptive lean construction principles, 56 interactions have been identified, all but four of which represent constructive interaction. Although evidence for the majority of these has been found, the matrix is not considered complete but rather a framework for research to explore the degree of validity of the interactions. Construction executives, managers, designers, and developers of information technology systems for construction can also benefit from the framework as an aid to recognizing the potential synergies when planning their lean and BIM adoption strategies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conceptually, the management of safety at roadworks can be seen in a three level framework. At the regulatory level, roadworks operate at the interface between the work environment, governed by workplace health and safety regulations, and the road environment, which is subject to road traffic regulations and practices. At the organizational level, national, state and local governments plan and purchase road construction and maintenance which are then delivered in-house or tendered out to large construction companies who often subcontract multiple smaller companies to supply services and labor. At the operational level, roadworks are difficult to isolate from the general public, hindering effective occupational health and safety controls. This study, from the State of Queensland, Australia, examines how well this tripartite framework functions. It includes reviews of organizational policy and procedures documents; interviews with 24 subject matter experts from various road construction and maintenance organizations, and on-site interviews with 66 road construction personnel. The study identified several factors influencing the translation of safety policies into practice including the cost of safety measures in the context of competitive tendering, lack of firm evidence of the effectiveness of safety measures, and pressures to minimize disruption to the travelling public.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

3D printing (3Dp) has long been used in the manufacturing sector as a way to automate, accelerate production and reduce waste materials. It is able to build a wide variety of objects if the necessary specifications are provided to the printer and no problems are presented by the limited range of materials available. With 3Dp becoming cheaper, more reliable and, as a result, more prevalent in the world at large, it may soon make inroads into the construction industry. Little is known however, of 3Dp in current use the construction industry and its potential for the future and this paper seeks to rectify this situation by providing a review of the relevant literature. In doing this, the three main 3Dp methods of contour crafting, concrete printing and D-shape 3Dp are described which, as opposed to the traditional construction method of cutting materials down to size, deliver only what is needed for completion, vastly reducing waste. Also identified is 3Dp’s potential to enable buildings to be constructed many times faster and with significantly reduced labour costs. In addition, it is clear that construction 3Dp can allow the further inclusion of Building Information Modelling into the construction process - streamlining and improving the scheduling requirements of a project. However, current 3Dp processes are known to be costly, unsuited to large-scale products and conventional design approaches, and have a very limited range of materials that can be used. Moreover, the only successful examples of construction in action to date have occurred in controlled laboratory environments and, as real world trials have yet to be completed, it is yet to be seen whether it can be it equally proficient in practical situations. Key Words: 3D Printing; Contour Crafting; Concrete Printing; D-shape; Building Automation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This workshop comprised a diverse group of African construction experts, ranging far wider than RSA. Each of the attendees had attended the annual ASOCSA conference and was additionally provided with a short workshop pre-brief. The aim was to develop a view of their 15-20 year vision of construction improvement in RSA and the steps necessary to get there. These included sociological, structural, technical and process changes. Whilst some suggestions are significantly challenging, none are impossible, given sufficient collaboration between government, industry, academia and NGOs. The highest priority projects (more properly, programmes) were identified and further explored. These are: 1. Information Hub (‘Open Africa’). Aim – to utilise emerging trends in Open Data to provide a force for African unity. 2. Workforce Development. Aim – to rebuild a competent, skilled construction industry for RSA projects and for export. 3. Modular DIY Building. Aim – to accelerate the development of sustainable, cost-efficient and desirable housing for African economic immigrants and others living in makeshift and slum dwellings. Open Data is a maturing theme in different cities and governments around the world and the workshop attendees were very keen to seize such a possibility to assist in developing an environment where Africans can share information and foster collaboration. It is likely that NGOs might be keen to follow up such an initiative. There are significant developments taking place around the world in the construction sector currently, with comparatively large savings being made for taxpayers (20% plus in the UK). Not all of these changes would be easy to transplant to RSA (even more so to much of the rest of Africa). Workforce development was a keen plea amongst the attendees, who seemed concerned that expertise has leaked away and is not being replaced with sufficient intensity. It is possible today to develop modular buildings in such a way that even unskilled residents can assist in their construction, and even their appropriate design. These buildings can be sited nearly autonomously from infrastructures, thus relieving the tensions on cities and townships, whilst providing humane accommodation for the economically disadvantaged. Development of suitable solutions could either be conducted with other similarly stressed countries or developed in-country and the expertise exported. Finally, it should be pointed out that this was very much a first step. Any opportunity to collaborate from an Australian, QUT or CIB perspective would be welcomed, whilst acknowledging that the leading roles belong to RSA, CSIR, NRF, ASOCSA and the University of KwaZulu-Natal.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since 2003, Mainland China has been promoting the public–private partnership (PPP) procurement model in the waste-to-energy incineration sector to reduce the waste burying rate and improve environmental quality. Five critical risk factors (CRFs) that affect the construction and operation of waste-to-energy incineration projects have been identified from real-life risk events of 14 PPP waste-to-energy incineration plants through content analysis. These risk factors are insufficient waste supply, disposal of non-licensed waste, environmental risk, payment risk, and lack of supporting infrastructure. A recently completed PPP waste-to-energy incineration plant, the Shanghai Tianma project, was investigated to learn from the effective management of CRFs. First-hand data about the Shanghai Tianma project was collected, with a focus on project negotiation and concession agreement. Lessons learned about risk management were acquired. This paper presents a detailed study of the contractual structure, risk sharing scheme, risk response measures to CRFs, and project transfer of a PPP project. The study results will provide governments with management implications to prepare equitable concession agreements and benefit private investors by effectively mitigating and managing risks in future PPP waste-to-energy incineration projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The study of the organisational culture in the construction industry is still in the stage of debate (Oney-Yazıcı et al., 2007). Despite the complexities involved in measuring the culture of the construction industry (Tijhuis and Fellows, 2012), this culture is regarded as being worthy of research, especially in relation to the organisational culture needed to support quality management systems (Koh and Low, 2008; Watson and Howarth, 2011) and to improve organisational effectiveness, and therefore, organisational performance (Coffey, 2010; Cheung et al., 2011). A number of recent studies have examined the construction companies’ organisational culture within the context of the use of Cameron and Quinn’s Competing Value Framework (CVF), as well as the use of their Organizational Culture Assessment Instrument (OCAI) as the conceptual paradigm for the analyses (Thomas et al., 2002; Nummelin, 2006; Oney- Yazıcı et al., 2007; Koh and Low, 2008). However, there has been little research based on the use of Cameron and Quinn’s CVF-OCAI tool for identifying types of construction companies’ organisational culture and their influences on the implementation of QMS-ISO 9001. Research output and information is also very limited relating to the strength of the companies’ organisational culture driving an effective QMS-ISO 9001 implementation, affecting the companies’ effectiveness. To rectify these research gaps, the research has been aimed to study organisational culture types (based on CVF) and their influences on the implementation of QMS-ISO 9001:2008 principles and elements, which eventually lead to improved companies’ quality performance. In order to fully examine the status of the QMS being implemented, the research has studied the relationships of the barriers of QMS implementation with the implementation of QMS-ISO 9001:2008 principles and elements and with the business performance of the companies, as well as the examination of the relationships of the implementation of QMS-ISO 9001:2008 principles and elements with the companies’ business performance. The research output has been the development of fundamental and original studies on the study topics, to provide the knowledge for improvements in Indonesian construction companies’ quality performance and quality outcomes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the early 1990's the University of Salford was typical of most pre-1992 Universities in that whilst students provided much of it's income, little attention was paid to pedagogy. As Warren Piper (1994) observed, University teachers were professional in their subject areas but generally did not seek to acquire a pedagogy of HE. This was the case in Alsford. Courses were efficiently run but only a minority of staff were engaged in actively considering learning and teaching issues. Instead staff time was spent on research and commercial activity.----- In the mid-1990's the teaching environment began to change significantly. As well as Dearing, the advent of QAA and teaching quality reviews, Salford was already experiencing changes in the characteristics of its student body. Wideing access was on our agenda before it was so predominant nationally. With increasing numbers and heterogeneity of students as well as these external factors, new challenges were facing the University and teaching domain.----- This paper describes how a culture which values teaching, learning and pedagogic inquiry is being created in the university. It then focuses on parts of this process specific to the Faculty of Business and Informatics, namely the Faculty's Learning and Teaching Research Network and the establishment of the Centre for Construction Education in the School of Construction and Property Management.----- The Faculty of Business and Informatics' Learning and Teaching Research Network aims to raise the profile, quality and volume of pedagogic research across the five schools in the faculty. The initiative is targeted at all academics regardless of previous research experience. We hope to grow and nurture research potential where it exists and to acknowledge and use the existing expertise of subject-based researchers in collaborative ventures. We work on the principle that people are deliged to share what they know but need appreciation and feedback for doing so. A further ain is to surface and celebrate the significant amount of tacit knowledge in the area of pedagogy evidenced by the strength of student and employer feedback in many areas of the faculty's teaching.----- The Faculty embraces generic and core management expertise but also includes applied management disciplines in information systems and construction and property management where internationally leading research activities and networked centres of excellence have been established. Drawing from this experience, and within the context of the Faculty network, a Centre for Construction Education is being established with key international external partners to develop a sustainable business model of an enterprising pedagogic centre that can undertake useful research to underpin teaching in the Faculty whilst offering sustainable business services to allow it to benefit from pump-priming grant funding.----- Internal and external networking are important elements in our plans and ongoing work. Key to this are our links with the LTSN subject centres (BEST and CEBE) and the LTSN generic centre. The paper discusses networking as a concept and gives examples of practices which have proved useful in this context.----- The academic influences on our approach are also examined. Dixon’s (2000) work examining how a range of companies succeed through internal knowledge sharing has provided a range of transferable practices. We also examine the notion of dialogue in this context, defined by Ballantyne (1999) as ‘The interactive human process of reasoning together which comes into being through interactions based on spontaneity or need and is enabled by trust’ Social constructionist principles of Practical Authorship (Shotter, 1993, Pavlica, Holman and Thorpe, 1998)) have also proved useful in developing our perspective on learning and knowledge creation within our community of practice.