323 resultados para Client


Relevância:

10.00% 10.00%

Publicador:

Resumo:

A plethora of methods for procuring building projects are available to meet the needs of clients. Deciding what method to use for a given project is a difficult and challenging task as a client’s objectives and priorities need to marry with the selected method so as to improve the likelihood of the project being procured successfully. The decision as to what procurement system to use should be made as early as possible and underpinned by the client’s business case for the project. The risks and how they can potentially affect the client’s business should also be considered. In this report, the need for client’s to develop a procurement strategy, which outlines the key means by which the objectives of the project are to be achieved is emphasised. Once a client has established a business case for a project, appointed a principal advisor, determined their requirements and brief, then consideration as to which procurement method to be adopted should be made. An understanding of the characteristics of various procurement options is required before a recommendation can be made to a client. Procurement systems can be categorised as traditional, design and construct, management and collaborative. The characteristics of these systems along with the procurement methods commonly used are described. The main advantages and disadvantages, and circumstances under which a system could be considered applicable for a given project are also identified.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The construction industry is categorised as being an information-intensive industry and described as one of the most important industries in any developed country, facing a period of rapid and unparalleled change (Industry Science Resources 1999) (Love P.E.D., Tucker S.N. et al. 1996). Project communications are becoming increasingly complex, with a growing need and fundamental drive to collaborate electronically at project level and beyond (Olesen K. and Myers M.D. 1999; Thorpe T. and Mead S. 2001; CITE 2003). Yet, the industry is also identified as having a considerable lack of knowledge and awareness about innovative information and communication technology (ICT) and web-based communication processes, systems and solutions which may prove beneficial in the procurement, delivery and life cycle of projects (NSW Government 1998; Kajewski S. and Weippert A. 2000). The Internet has debatably revolutionised the way in which information is stored, exchanged and viewed, opening new avenues for business, which only a decade ago were deemed almost inconceivable (DCITA 1998; IIB 2002). In an attempt to put these ‘new avenues of business’ into perspective, this report provides an overall ‘snapshot’ of current public and private construction industry sector opportunities and practices in the implementation and application of web-based ICT tools, systems and processes (e-Uptake). Research found that even with a reserved uptake, the construction industry and its participating organisations are making concerted efforts (fortunately with positive results) in taking up innovative forms of doing business via the internet, including e-Tendering (making it possible to manage the entire tender letting process electronically and online) (Anumba C.J. and Ruikar K. 2002; ITCBP 2003). Furthermore, Government (often a key client within the construction industry),and with its increased tendency to transact its business electronically, undoubtedly has an effect on how various private industry consultants, contractors, suppliers, etc. do business (Murray M. 2003) – by offering a wide range of (current and anticipated) e-facilities / services, including e-Tendering (Ecommerce 2002). Overall, doing business electronically is found to have a profound impact on the way today’s construction businesses operate - streamlining existing processes, with the growth in innovative tools, such as e-Tender, offering the construction industry new responsibilities and opportunities for all parties involved (ITCBP 2003). It is therefore important that these opportunities should be accessible to as many construction industry businesses as possible (The Construction Confederation 2001). Historically, there is a considerable exchange of information between various parties during a tendering process, where accuracy and efficiency of documentation is critical. Traditionally this process is either paper-based (involving large volumes of supporting tender documentation), or via a number of stand-alone, non-compatible computer systems, usually costly to both the client and contractor. As such, having a standard electronic exchange format that allows all parties involved in an electronic tender process to access one system only via the Internet, saves both time and money, eliminates transcription errors and increases speed of bid analysis (The Construction Confederation 2001). Supporting this research project’s aims and objectives, researchers set to determine today’s construction industry ‘current state-of-play’ in relation to e-Tendering opportunities. The report also provides brief introductions to several Australian and International e-Tender systems identified during this investigation. e-Tendering, in its simplest form, is described as the electronic publishing, communicating, accessing, receiving and submitting of all tender related information and documentation via the internet, thereby replacing the traditional paper-based tender processes, and achieving a more efficient and effective business process for all parties involved (NT Governement 2000; NT Government 2000; NSW Department of Commerce 2003; NSW Government 2003). Although most of the e-Tender websites investigated at the time, maintain their tendering processes and capabilities are ‘electronic’, research shows these ‘eTendering’ systems vary from being reasonably advanced to more ‘basic’ electronic tender notification and archiving services for various industry sectors. Research also indicates an e-Tender system should have a number of basic features and capabilities, including: • All tender documentation to be distributed via a secure web-based tender system – thereby avoiding the need for collating paperwork and couriers. • The client/purchaser should be able to upload a notice and/or invitation to tender onto the system. • Notification is sent out electronically (usually via email) for suppliers to download the information and return their responses electronically (online). • During the tender period, updates and queries are exchanged through the same e-Tender system. • The client/purchaser should only be able to access the tenders after the deadline has passed. • All tender related information is held in a central database, which should be easily searchable and fully audited, with all activities recorded. • It is essential that tender documents are not read or submitted by unauthorised parties. • Users of the e-Tender system are to be properly identified and registered via controlled access. In simple terms, security has to be as good as if not better than a manual tender process. Data is to be encrypted and users authenticated by means such as digital signatures, electronic certificates or smartcards. • All parties must be assured that no 'undetected' alterations can be made to any tender. • The tenderer should be able to amend the bid right up to the deadline – whilst the client/purchaser cannot obtain access until the submission deadline has passed. • The e-Tender system may also include features such as a database of service providers with spreadsheet-based pricing schedules, which can make it easier for a potential tenderer to electronically prepare and analyse a tender. Research indicates the efficiency of an e-Tender process is well supported internationally, with a significant number, yet similar, e-Tender benefits identified during this investigation. Both construction industry and Government participants generally agree that the implementation of an automated e-Tendering process or system enhances the overall quality, timeliness and cost-effectiveness of a tender process, and provides a more streamlined method of receiving, managing, and submitting tender documents than the traditional paper-based process. On the other hand, whilst there are undoubtedly many more barriers challenging the successful implementation and adoption of an e-Tendering system or process, researchers have also identified a range of challenges and perceptions that seem to hinder the uptake of this innovative approach to tendering electronically. A central concern seems to be that of security - when industry organisations have to use the Internet for electronic information transfer. As a result, when it comes to e-Tendering, industry participants insist these innovative tendering systems are developed to ensure the utmost security and integrity. Finally, if Australian organisations continue to explore the competitive ‘dynamics’ of the construction industry, without realising the current and future, trends and benefits of adopting innovative processes, such as e-Tendering, it will limit their globalising opportunities to expand into overseas markets and allow the continuation of international firms successfully entering local markets. As such, researchers believe increased knowledge, awareness and successful implementation of innovative systems and processes raises great expectations regarding their contribution towards ‘stimulating’ the globalisation of electronic procurement activities, and improving overall business and project performances throughout the construction industry sectors and overall marketplace (NSW Government 2002; Harty C. 2003; Murray M. 2003; Pietroforte R. 2003). Achieving the successful integration of an innovative e-Tender solution with an existing / traditional process can be a complex, and if not done correctly, could lead to failure (Bourn J. 2002).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This project aims to assess the extent of economic sustainability of working in international markets by Australian construction design-related firms. This investigation also identified barriers and success factors firms experience, which ultimately increases or reduces their exposure to financial risk. This study explored new research territory by developing a detailed understanding of the way three successful firms have maintained their longevity in various international markets. The firms are not considered to be large firms by international standards. The manner in which the firms achieve long term sustainability, deal with problems and barriers in international markets and develop successful strategies rely upon being adaptable to different markets and changes within markets. A model was developed based upon a critical analysis of the literature. An adaptive performance framework for sustainability was developed which had three key areas; internationalisation process, market knowledge and design management. The sustainable business model is underpinned by the management of non-economic factors, which include social, cultural and intellectual capital. The ultimate aim of any firm and the ultimate indicator of success is financial capital. Firms typically develop their own highly sophisticated financial measures themselves however have only an implicit understanding of other softer and less tangible factors that impact upon sustainability. Adaptive performance is the firm’s continual adaptivity of business practices to respond to and thereby achieve client satisfaction by a combination of self, market and project needs assessment.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This project aims to assess the extent of economic sustainability of working in international markets by Australian construction design-related firms. This investigation also identified barriers and success factors firms experience, which ultimately increases or reduces their exposure to financial risk. This study explored new research territory by developing a detailed understanding of the way three successful firms have maintained their longevity in various international markets. The firms are not considered to be large firms by international standards. The manner in which the firms achieve long term sustainability, deal with problems and barriers in international markets and develop successful strategies rely upon being adaptable to different markets and changes within markets. A model was developed based upon a critical analysis of the literature. An adaptive performance framework for sustainability was developed which had three key areas; internationalisation process, market knowledge and design management. The sustainable business model is underpinned by the management of non-economic factors, which include social, cultural and intellectual capital. The ultimate aim of any firm and the ultimate indicator of success is financial capital. Firms typically develop their own highly sophisticated financial measures themselves however have only an implicit understanding of other softer and less tangible factors that impact upon sustainability. Adaptive performance is the firm’s continual adaptivity of business practices to respond to and thereby achieve client satisfaction by a combination of self, market and project needs assessment.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Partnering has been defined in many ways. It can be considered as an individual project mechanism or can be considered as a long term strategy. Alliancing is normally assumed to be a long term business strategy linking together client, contractor and supply chain. Relational contracting goes further than this and brings in the whole philosophy of the value chain and the linking of the interdependent parts within the construction project as a key business objective. This document aims to review existing definitions of these three concepts and present and overview of the current state of-the-art in terms of their use and implementation. The document should be useful for all of those project team members looking to sharpen their understanding of the various concepts and will also provide a platform for debating the current state of the definitions and implementations being used in Main Roads and Public Works Departments.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Brisbane Water (BW), a commercialised business arm of Brisbane City Council (BCC) entered into an alliance with a number of organisations from the private sector in order to design, construct, commission and undertake upgrades to three existing wastewater treatment plants located at Sandgate, Oxley Creek, and Wacol in Brisbane. The alliance project is called the Brisbane Water Environmental Alliance (BWEA). This report details the efforts of a team of researchers from the School of Management at Queensland University of Technology to investigate this alliance. This is the second report on this project, and is called Stage 2 of the research. At the time that Stage 2 of the research project was conducted, the BWEA project was nearing completion with a further 8 months remaining before project completion. The aim of this report is to explore individuals’ perceptions of the effectiveness and functioning of the BWEA project in the latter stages of the project. The second aim of this report is to analyse the longitudinal findings of this research project by integrating the findings from Stage 1 and Stage 2 of the project. This long-term analysis of the functioning and effectiveness of the alliance is important because at the current time, researchers have little knowledge of the group developmental processes that occur in large-scale alliances over time. Stage 2 of this research project has a number of aims including assessing performance of the BWEA project from the point of view of a range of stakeholders including the alliance board and alliance management team, alliance staff, and key stakeholders from the client organisation (Brisbane Water). Data were collected using semi-structured interviews with 18 individuals including two board members, one external facilitator, and four staff members from the client organisation. Analysis involved coding the interview transcripts in terms of the major issues that were reported by interviewees.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The purpose of this document is to introduce non-specialists to the discipline and practice of public policy, particularly in relation to the construction sector in Australia. In order to do this, a brief overview of Australia’s government structure, and some of the main approaches to public policy analysis are outlined. Reference to construction related examples are provided to ensure issues discussed are relevant and understandable to construction professionals. Government is a significant player in the construction industry, and has multiple roles: adjudicator, regulator, constructor, purchaser and client of construction projects. Moreover there are many spheres of government that are typically engaged in construction projects at multiple stages. The machinery of government can be difficult to understand, even for long term public servants. Demystifying the processes within government can help to improve communication and therefore performance in the industry. A better understanding of how policy-making and government policies affect the construction industry will enhance communication and assist construction professionals and academics to understand and work with government. Additionally the document will provide an opportunity to demonstrate the relevance of policy analysis to inquiries of construction policies and regulation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Thirty-five clients who had received counselling completed a letter to a friend describing in as much detail as possible what they had learned from counselling. The participants' written responses were analysed and classified using the Structure of Learning Outcomes (SOLO) taxonomy. The results suggested that an expanded SOLO offers a promising and exciting way to view the outcomes of counselling within a learning framework. If the SOLO taxonomy is found to be stable in subsequent research, and clients are easily able to be classified using the taxonomy, then this approach may have implications for the process of counselling. To maximise the learning outcomes, counsellors could use strategies and techniques to enhance their clients' learning.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Objective: To describe the extent and nature of demonstrated professional partnerships between occupational therapists and Aboriginal health workers in rural and remote communities of North Queensland. The study identifies ways in which professional partnerships improve client services and enhance occupational therapy outcomes through exploring the aspects of communication, collaboration and bridging cultural boundaries.---------- Design: Data collected via in-depth, semistructured telephone interviews. ---------- Setting: Aboriginal and mainstream health and human service organisations in rural and remote North Queensland. Rural and remote areas were identified using the Accessibility and Remoteness Index of Australia codes. ---------- Participants: Seven participants working in rural and remote areas of North Queensland, comprising four occupational therapists and three Aboriginal health workers. All participants were female. ---------- Results: Participants identified five core themes when describing the extent and nature of professional partnerships between occupational therapists and Aboriginal health workers. Themes include: professional interaction; perception of professional roles; benefits to the client; professional interdependence; and significance of Aboriginal culture. According to participants, when partnerships between occupational therapists and Aboriginal health workers were formed, clients received a more culturally appropriate service, were more comfortable in the presence of the occupational therapist, obtained a greater understanding of occupational therapy assessment and intervention, and felt valued in the health care process. ---------- Conclusions: This study substantiates the necessity for the formation of professional partnerships between occupational therapists and Aboriginal health workers. The findings suggest that participation in professional partnerships has positive implications for occupational therapists working with Aboriginal clients and Aboriginal health workers in rural and remote regions of North Queensland.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Australia has no nationally accepted building products life cycle inventory (LCI) database for use in building Ecologically Sustainable Development (ESD) assessment (BEA) tools. More information about the sustainability of the supply chain is limited by industry’s lack of real capacity to deliver objective information on process and product environmental impact. Recognition of these deficits emerged during compilation of a National LCI database to inform LCADesign, a prototype 3 dimensional object oriented computer aided design (3-D CAD) commercial building design tool. Development of this Australian LCI represents 24 staff years of effort here since 1995. Further development of LCADesign extensions is proposed as being essential to support key applications demanded from a more holistic theoretical framework calling for modules of new building and construction industry tools. A proposed tool, conceptually called LCADetails, is to serve the building product industries own needs as well as that of commercial building design amongst other industries’ prospective needs. In this paper, a proposition is examined that the existing national LCI database should be further expanded to serve Australian building product industries’ needs as well as to provide details for its client-base from a web based portal containing a module of practical supply and procurement applications. Along with improved supply chain assessment services, this proposed portal is envisaged to facilitate industry environmental life cycle improvement assessment and support decision-making to provide accredited data for operational reporting capabilities, load-based reasoning as well as BEA applications. This paper provides an overview of developments to date, including a novel 3-D CAD information and communications technology (ICT) platform for more holistic integration of existing tools for true cost assessment. Further conceptualisation of future prospects, based on a new holistic life cycle assessment framework LCADevelop, considering stakeholder relationships and their need for a range of complementary tools leveraging automated function off such ICT platforms to inform dimensionally defined operations for such as automotive, civil, transport and industrial applications are also explored.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

IT professionals work in an environment which is under continual innovation, exerts a global influence and yet is relatively young. In such a context, how can professionals be effectively supported in their ethical practice? IT professional ethics has predominantly focussed on external standards or internal reasoning. However, attention also has to be paid to professionals’ experience of ethics, which influences how they interpret standards and construct reasoning. A comprehensive experience of ethics will embrace the professional’s inner circle, their employer, their client and humanity. In order to promote such a comprehensive view, we need to re-conceptualise a) the IT discipline, focussing on information users; b) professional ethics, adopting other-centred attitudes; and c) professional development, pursuing a change in lived experience. This book is written for those interested in professional ethics (practitioners, educators, professional bodies and employers), especially in the computing field.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Aboriginal women are treated differently by non-indigenous health care providers based on perceptions of Aboriginality and skin colour and white race privilege within health care environments. The experiences shared below are from some of the Aboriginal woman respondents in a research project undertaken within Rockhampton, a regional area in Central Queensland (Fredericks, 2003). The experiences give an insight into how the Aboriginal women interviewed felt and their observations of how other Aboriginal women were treated within health care settings based on skin colour and perceptions of Aboriginality. A number of the women demonstrated a personal in-depth analysis of the issues surrounding place, skin colour and Aboriginality. For example, one of the women, who I named Kay, identified one particular health service organisation and stated that, ‘it is a totally white designed space. There is nothing that identifies me to that place. I just won’t go there as a client because I don’t feel they cater for me as a black woman’. Kay’s words give us an understanding of the reality experienced by Aboriginal women as they move in and out of places within health environments and broader society. Some of these experiences are examples of direct racism, whilst other examples are subtle and demonstrate how whiteness manifests and plays out within places. I offer acknowledgement and honour to the Aboriginal women who shared their stories and gave me a glimpse of their realities in the research project from which the findings presented in this chapter are taken. It is to this research project that is the subject of this chapter.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose: The determination of the most appropriate procurement system for a capital works project is a challenging task for public sector clients considering the array of assessment criteria that are considered and the procurement methods that are available. This is particularly pertinent to the Western Australian public sector where they have had a propensity to use traditional lump sum as the default procurement solution despite knowing that the selection of an inappropriate procurement method may lead to cost and time overruns, claims, and disputes’ on projects. This paper presents a six step procurement method evaluation approach that requires public sector agencies to consider in detail an array of options so as to obtain value for money. Design/methodology/approach: A procurement evaluation approach is developed and is examined using a focus group of 12 participants comprising of a public sector client, project team and key stakeholders. The focus group was used to examine the developed approach in the context of a real-life capital works project. Findings: The procurement method evaluation approach was deemed to be pragmatic and enabled decision-makers to re-evaluate outcomes from previous steps in the process. All focus group participants stated the six step process enabled a recommendation that was grounded in reflection and detailed evaluation. Practical implications: The developed procurement approach has enabled the public sector client evaluate the way in which they view procurement method selection and examine how they obtain ‘value for money’. Originality/value: The six step procurement approach makes use of quantitative and qualitative techniques and is reliant on discourse and reflection in making a procurement method recommendation. Consequently, the approach enables public sector clients to account for the complexities often associated with procurement selection.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.