263 resultados para Benefit-cost Analysis


Relevância:

40.00% 40.00%

Publicador:

Resumo:

As fossil fuel prices increase and environmental concerns gain prominence, the development of alternative fuels from biomass has become more important. Biodiesel produced from microalgae is becoming an attractive alternative to share the role of petroleum. Currently it appears that the production of microalgal biodiesel is not economically viable in current environment because it costs more than conventional fuels. Therefore, a new concept is introduced in this article as an option to reduce the total production cost of microalgal biodiesel. The integration of biodiesel production system with methane production via anaerobic digestion is proved in improving the economics and sustainability of overall biodiesel stages. Anaerobic digestion of microalgae produces methane and further be converted to generate electricity. The generated electricity can surrogate the consumption of energy that require in microalgal cultivation, dewatering, extraction and transesterification process. From theoretical calculations, the electricity generated from methane is able to power all of the biodiesel production stages and will substantially reduce the cost of biodiesel production (33% reduction). The carbon emissions of biodiesel production systems are also reduced by approximately 75% when utilizing biogas electricity compared to when the electricity is otherwise purchased from the Victorian grid. The overall findings from this study indicate that the approach of digesting microalgal waste to produce biogas will make the production of biodiesel from algae more viable by reducing the overall cost of production per unit of biodiesel and hence enable biodiesel to be more competitive with existing fuels.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper develops a dynamic model for cost-effective selection of sites for restoring biodiversity when habitat quality develops over time and is uncertain. A safety-first decision criterion is used for ensuring a minimum level of habitats, and this is formulated in a chance-constrained programming framework. The theoretical results show; (i) inclusion of quality growth reduces overall cost for achieving a future biodiversity target from relatively early establishment of habitats, but (ii) consideration of uncertainty in growth increases total cost and delays establishment, and (iii) cost-effective trading of habitat requires exchange rate between sites that varies over time. An empirical application to the red listed umbrella species - white-backed woodpecker - shows that the total cost of achieving habitat targets specified in the Swedish recovery plan is doubled if the target is to be achieved with high reliability, and that equilibrating price on a habitat trading market differs considerably between different quality growth combinations. © 2013 Elsevier GmbH.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Introduced predators can have pronounced effects on naïve prey species; thus, predator control is often essential for conservation of threatened native species. Complete eradication of the predator, although desirable, may be elusive in budget-limited situations, whereas predator suppression is more feasible and may still achieve conservation goals. We used a stochastic predator-prey model based on a Lotka-Volterra system to investigate the cost-effectiveness of predator control to achieve prey conservation. We compared five control strategies: immediate eradication, removal of a constant number of predators (fixed-number control), removal of a constant proportion of predators (fixed-rate control), removal of predators that exceed a predetermined threshold (upper-trigger harvest), and removal of predators whenever their population falls below a lower predetermined threshold (lower-trigger harvest). We looked at the performance of these strategies when managers could always remove the full number of predators targeted by each strategy, subject to budget availability. Under this assumption immediate eradication reduced the threat to the prey population the most. We then examined the effect of reduced management success in meeting removal targets, assuming removal is more difficult at low predator densities. In this case there was a pronounced reduction in performance of the immediate eradication, fixed-number, and lower-trigger strategies. Although immediate eradication still yielded the highest expected minimum prey population size, upper-trigger harvest yielded the lowest probability of prey extinction and the greatest return on investment (as measured by improvement in expected minimum population size per amount spent). Upper-trigger harvest was relatively successful because it operated when predator density was highest, which is when predator removal targets can be more easily met and the effect of predators on the prey is most damaging. This suggests that controlling predators only when they are most abundant is the "best" strategy when financial resources are limited and eradication is unlikely. © 2008 Society for Conservation Biology.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper reports on an Australian study that explored the costs and benefits of the National Assessment Programme, Literacy and Numeracy (NAPLAN) testing, both tangible and intangible, of Year 9 students in three Queensland schools. The study commenced with a review of pertinent studies and other related material about standardised testing in Australia, the USA and UK. Information about NAPLAN testing and reporting, and the pedagogical impacts of standardised testing were identified, however little about administrative costs to schools was found. A social constructivist perspective and a multiple case study approach were used to explore the actions of school managers and teachers in three Brisbane secondary schools. The study found that the costs of NAPLAN testing to schools fell into two categories: preparation of students for the testing; and administration of the tests. Whilst many of the costs could not be quantified, they were substantial and varied according to the education sector in which the school operated. The benefits to schools of NAPLAN testing were found to be limited. The findings have implications for governments, curriculum authorities and schools, leading to the conclusion that, from a school perspective, the benefits of NAPLAN testing do not justify the costs.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Objective. To assess the cost-effectiveness of bone density screening programmes for osteoporosis. Study design. Using published and locally available data regarding fracture rates and treatment costs, the overall costs per fracture prevented, cost per quality of life year (QALY) saved and cost per year of life gained were estimated for different bone density screening and osteoporosis treatment programmes. Main outcome measures. Cost per fracture prevented, cost per QALY saved, and cost per year of life gained. Results. In women over the age of 50 years, the costs per fracture prevented of treating all women with hormone replacement therapy, or treating only if osteoporosis is demonstrated on bone density screening were £32,594 or £23,867 respectively. For alendronate therapy for the same groups, the costs were £171,067 and £14,067 respectively. Once the background rate of treatment with alendronate reaches 18%, bone density screening becomes cost-saving. Costs estimates per QALY saved ranged from £1,514 to £39,076 for osteoporosis treatment with alendronate following bone density screening. Conclusions. For relatively expensive medications such as alendronate, treatment programmes with prior bone density screening are far more cost effective than those without, and in some circumstances become cost-saving. Costs per QALY of life saved and per year of life gained for osteoporosis treatment with prior bone density screening compare favourably with treatment of hypertension and hypercholesterolemia.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

- Background Exercise referral schemes (ERS) aim to identify inactive adults in the primary-care setting. The GP or health-care professional then refers the patient to a third-party service, with this service taking responsibility for prescribing and monitoring an exercise programme tailored to the needs of the individual. - Objective To assess the clinical effectiveness and cost-effectiveness of ERS for people with a diagnosed medical condition known to benefit from physical activity (PA). The scope of this report was broadened to consider individuals without a diagnosed condition who are sedentary. - Data sources MEDLINE; EMBASE; PsycINFO; The Cochrane Library, ISI Web of Science; SPORTDiscus and ongoing trial registries were searched (from 1990 to October 2009) and included study references were checked. - Methods Systematic reviews: the effectiveness of ERS, predictors of ERS uptake and adherence, and the cost-effectiveness of ERS; and the development of a decision-analytic economic model to assess cost-effectiveness of ERS. - Results Seven randomised controlled trials (UK, n = 5; non-UK, n = 2) met the effectiveness inclusion criteria, five comparing ERS with usual care, two compared ERS with an alternative PA intervention, and one to an ERS plus a self-determination theory (SDT) intervention. In intention-to-treat analysis, compared with usual care, there was weak evidence of an increase in the number of ERS participants who achieved a self-reported 90-150 minutes of at least moderate-intensity PA per week at 6-12 months' follow-up [pooled relative risk (RR) 1.11, 95% confidence interval 0.99 to 1.25]. There was no consistent evidence of a difference between ERS and usual care in the duration of moderate/vigorous intensity and total PA or other outcomes, for example physical fitness, serum lipids, health-related quality of life (HRQoL). There was no between-group difference in outcomes between ERS and alternative PA interventions or ERS plus a SDT intervention. None of the included trials separately reported outcomes in individuals with medical diagnoses. Fourteen observational studies and five randomised controlled trials provided a numerical assessment of ERS uptake and adherence (UK, n = 16; non-UK, n = 3). Women and older people were more likely to take up ERS but women, when compared with men, were less likely to adhere. The four previous economic evaluations identified suggest ERS to be a cost-effective intervention. Indicative incremental cost per quality-adjusted life-year (QALY) estimates for ERS for various scenarios were based on a de novo model-based economic evaluation. Compared with usual care, the mean incremental cost for ERS was £169 and the mean incremental QALY was 0.008, with the base-case incremental cost-effectiveness ratio at £20,876 per QALY in sedentary people without a medical condition and a cost per QALY of £14,618 in sedentary obese individuals, £12,834 in sedentary hypertensive patients, and £8414 for sedentary individuals with depression. Estimates of cost-effectiveness were highly sensitive to plausible variations in the RR for change in PA and cost of ERS. - Limitations We found very limited evidence of the effectiveness of ERS. The estimates of the cost-effectiveness of ERS are based on a simple analytical framework. The economic evaluation reports small differences in costs and effects, and findings highlight the wide range of uncertainty associated with the estimates of effectiveness and the impact of effectiveness on HRQoL. No data were identified as part of the effectiveness review to allow for adjustment of the effect of ERS in different populations. - Conclusions There remains considerable uncertainty as to the effectiveness of ERS for increasing activity, fitness or health indicators or whether they are an efficient use of resources in sedentary people without a medical diagnosis. We failed to identify any trial-based evidence of the effectiveness of ERS in those with a medical diagnosis. Future work should include randomised controlled trials assessing the cinical effectiveness and cost-effectivenesss of ERS in disease groups that may benefit from PA. - Funding The National Institute for Health Research Health Technology Assessment programme.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We present the first detailed application of Meadows’s cost-based modelling framework to the analysis of JFK, an Internet key agreement protocol. The analysis identifies two denial of service attacks against the protocol that are possible when an attacker is willing to reveal the source IP address. The first attack was identified through direct application of a cost-based modelling framework, while the second was only identified after considering coordinated attackers. Finally, we demonstrate how the inclusion of client puzzles in the protocol can improve denial of service resistance against both identified attacks.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The firm is faced with a decision concerning the nature of intra-organizational exchange relationships with internal human resources and the nature or inter-organizational exchange relationships with market firms. In both situations, the firm can develop an exchange that ranges from a discrete exchange to a relational exchange. Transaction Cost Economics (TCE) and the Resource Dependency View (RDV) represent alternative efficiency-based explanations fo the nature of the exchange relationship. The aim of the paper is to test these two theories in respect of air conditioning maintenance in retail centres. Multiple sources of information are genereated from case studies of Australian retail centres to test these theories in respoect of internalized operations management (concerning strategic aspects of air conditioning maintenance) and externalized planned routine air conditioning maintenance. The analysis of the data centres on pattern matching. It is concluded that the data supports TCE - on the basis of a development in TCE's contractual schema. Further research is suggested towards taking a pluralistic stance and developing a combined efficiency and power hypothesis - upon which Williamson has speculated. For practice, the conclusions also offer a timely cautionary note concerning the adoption of one approach in all exchange relationships.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Catheter-related bloodstream infections are a serious problem. Many interventions reduce risk, and some have been evaluated in cost-effectiveness studies. We review the usefulness and quality of these economic studies. Evidence is incomplete, and data required to inform a coherent policy are missing. The cost-effectiveness studies are characterized by a lack of transparency, short time-horizons, and narrow economic perspectives. Data quality is low for some important model parameters. Authors of future economic evaluations should aim to model the complete policy and not just single interventions. They should be rigorous in developing the structure of the economic model, include all relevant economic outcomes, use a systematic approach for selecting data sources for model parameters, and propagate the effect of uncertainty in model parameters on conclusions. This will inform future data collection and improve our understanding of the economics of preventing these infections.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The availability of innumerable intelligent building (IB) products, and the current dearth of inclusive building component selection methods suggest that decision makers might be confronted with the quandary of forming a particular combination of components to suit the needs of a specific IB project. Despite this problem, few empirical studies have so far been undertaken to analyse the selection of the IB systems, and to identify key selection criteria for major IB systems. This study is designed to fill these research gaps. Two surveys: a general survey and the analytic hierarchy process (AHP) survey are proposed to achieve these objectives. The first general survey aims to collect general views from IB experts and practitioners to identify the perceived critical selection criteria, while the AHP survey was conducted to prioritize and assign the important weightings for the perceived criteria in the general survey. Results generally suggest that each IB system was determined by a disparate set of selection criteria with different weightings. ‘Work efficiency’ is perceived to be most important core selection criterion for various IB systems, while ‘user comfort’, ‘safety’ and ‘cost effectiveness’ are also considered to be significant. Two sub-criteria, ‘reliability’ and ‘operating and maintenance costs’, are regarded as prime factors to be considered in selecting IB systems. The current study contributes to the industry and IB research in at least two aspects. First, it widens the understanding of the selection criteria, as well as their degree of importance, of the IB systems. It also adopts a multi-criteria AHP approach which is a new method to analyse and select the building systems in IB. Further research would investigate the inter-relationship amongst the selection criteria.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This document provides an overview of the differences and similarities in the objectives and implementation frameworks of the training and employment policies applying to public construction projects in Western Australia and Queensland. The material in the document clearly demonstrates the extent to which approaches to the pursuit of training objectives in particular have been informed by the experiences of other jurisdictions. The two State governments now have very similar approaches to the promotion of training with the WA government basing a good part of its policy approach on the “Queensland model”. As the two States share many similar economic and other characteristics, and have very similar social and economic goals, this similarity is to be expected. The capacity to benefit from the experiences of other jurisdictions is to be welcomed. The similarity in policy approach also suggests a potential for ongoing collaborations between the State governments on research aimed at further improving training and employment outcomes via public construction projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This document outlines a framework that could be used by government agencies in assessing policy interventions aimed at achieving social outcomes from government construction contracts. The framework represents a rational interpretation of the information gathered during the multi-outcomes construction policies project. The multi-outcomes project focused on the costs and benefits of using public construction contracts to promote the achievement of training and employment and public art objectives. The origin of the policy framework in a cost-benefit appraisal of current policy interventions is evidenced by its emphasis on sensitivity to policy commitment and project circumstances (especially project size and scope).The quantitative and qualitative analysis conducted in the multi-outcomes project highlighted, first, that in the absence of strong industry commitment to policy objectives, policy interventions typically result in high levels of avoidance activity, substantial administrative costs and very few benefits. Thus, for policy action on, for example, training or local employment to be successful compliance issues must be adequately addressed. Currently it appears that pre-qualification schemes (similar to the Priority Access Scheme) and schemes that rely on measuring, for example, the training investments of contractors within particular projects do not achieve high levels of compliance and involve significant administrative costs. Thus, an alternative is suggested in the policy framework developed here: a levy on each public construction project – set as a proportion of the total project costs. Although a full evaluation of this policy alternative was beyond the scope of the multi-outcomes construction policies project, it appears to offer the potential to minimize the transaction costs on contractors whilst enabling the creation of a training agency dedicated to improving the supply of skilled construction labour. A recommendation is thus made that this policy alternative be fully researched and evaluated. As noted above, the outcomes of the multi-outcomes research project also highlighted the need for sensitivity to project circumstances in the development and implementation of polices for public construction projects. Ideally a policy framework would have the flexibility to respond to circumstances where contractors share a commitment to the policy objectives and are able to identify measurable social outcomes from the particular government projects they are involved in. This would involve a project-by-project negotiation of goals and performance measures. It is likely to only be practical for large, longer term projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Resolving insurance disputes can focus only on quantum. Where insurers adopt integrative solutions they can enjoy cost savings and higher customer satisfaction. An integratively managed process can expand the negotiation options. The potential inherent in plaintiff’s emotions to resolve matters on an emotional basis, rather than an economic one, is explored. Using research, the author demonstrates how mediations are more likely to obtain integrative outcomes than unmediated conferences. Using a combination of governmental reports, published studies and academic publications, the paper demonstrates how mediation is more likely to foster an environment where the parties communicate and cooperate. Research is employed to demonstrate where mediators can reduce hostilities, in circumstances where negotiating parties alone would likely fail. Generally the paper constructs an argument to support the proposition that mediation can offer insurers an effective mechanism to reduce costs and increase customer satisfaction. INTRODUCTION Mediation can offer insurers an effective mechanism to reduce costs and increase customer satisfaction. This paper will first demonstrate the differences between distributive and integrative outcomes. It is argued insurer’s interest can be far better served through obtaining an integrative solution. The paper explains how the mediator can assist both parties to obtain an integrative outcome. Simultaneously the paper explores the extreme difficulties conference participants face in obtaining an integrative outcome without a mediator in an adversarial climate. The mediator’s ability to assist in the facilitation of integrative information exchange, defuse hostilities and reality check expectations is discussed. The mediator’s ability to facilitate in this area is compared to the inability of conference participants to achieve similar results. This paper concludes, the potential financial benefit offered by integrative solutions, combined with the ability of mediation to deliver such outcomes where unmediated conferences cannot deliver, leads to the recommendation that insurers opt for a mediation to best serve their commercial interests.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An estimation of costs for maintenance and rehabilitation is subject to variation due to the uncertainties of input parameters. This paper presents the results of an analysis to identify input parameters that affect the prediction of variation in road deterioration. Road data obtained from 1688 km of a national highway located in the tropical northeast of Queensland in Australia were used in the analysis. Data were analysed using a probability-based method, the Monte Carlo simulation technique and HDM-4’s roughness prediction model. The results of the analysis indicated that among the input parameters the variability of pavement strength, rut depth, annual equivalent axle load and initial roughness affected the variability of the predicted roughness. The second part of the paper presents an analysis to assess the variation in cost estimates due to the variability of the overall identified critical input parameters.