186 resultados para BIM collaboration
Resumo:
This volume brings together a number of essays that seek to explore the nature of early modern scholarship, ostensibly with special regard to the themes of interdisciplinarity and collaboration. As one might expect, the essays thus cover a gamut of topics – political manoeuvring, philosophical debates, gift-giving and dramatic performance – and each study is important and useful in its own right. As a whole, however, this collection serves more as a starting point for an exploration of its themes, than as an authoritative overview of the subject at hand.
Resumo:
There appears no shortage of theorists for preservice teacher education; however many ideas are abandoned without practical applications. Indeed, it can take years for theories to materialise into practice, if they materialise at all. The quality of preservice teacher education is central for enhancing an education system, and mentors’ roles can assist to shape preservice teachers’ development within the school context. Yet mentoring can be haphazard without being underpinned by a theoretical framework. A mentoring model (personal attributes, system requirements, pedagogical knowledge, modelling, and feedback) has emerged from research and the literature to guide mentors’ practices. This qualitative study investigates mentors’ pedagogical knowledge as one factor crucial to the mentoring process. More specifically, this study involves a questionnaire and audio-recorded focus group meetings with experienced mentors (n=14) who deliberated on devising practical applications for mentoring pedagogical knowledge. Findings revealed that these experienced mentors pinpointed practical applications around a mentor’s role for providing pedagogical knowledge to the mentee. These strategies were varied and demonstrated that any one mentoring practice may be approached from a number of different angles. Nevertheless, there were core mentoring practices in pedagogical knowledge such as showing the mentee how to plan for teaching, articulating classroom management approaches, and talking about how to connect learning to assessment. Mentors may require education on current mentoring practices with practical strategies that are linked to theoretical underpinnings.
Resumo:
Emerging from the challenge to reduce energy consumption in buildings is the need for energy simulation to be used more effectively to support integrated decision making in early design. As a critical response to a Green Star case study, we present DEEPA, a parametric modeling framework that enables architects and engineers to work at the same semantic level to generate shared models for energy simulation. A cloud-based toolkit provides web and data services for parametric design software that automate the process of simulating and tracking design alternatives, by linking building geometry more directly to analysis inputs. Data, semantics, models and simulation results can be shared on the fly. This allows the complex relationships between architecture, building services and energy consumption to be explored in an integrated manner, and decisions to be made collaboratively.
Collaboration : developing integration in multi-purpose services in rural New South Wales, Australia
Resumo:
Introduction: The Multi-purpose Service (MPS) Program was introduced to rural Australia in 1991 as a solution to poor health outcomes in rural compared with metropolitan populations, difficulty in attracting healthcare staff and a lack of viability and range of health services in rural areas. The aim of this study was to describe the main concerns of participants involved in the development of multi-purpose services in rural New South Wales (NSW). This article is abstracted from a larger study and discusses the extent to which collaboration occurred within the new multi-purpose service. Methods: A constructivist grounded theory methodology was used. Participants were from 13 multi-purpose services in rural NSW and 30 in-depth interviews were conducted with 6 community members, 11 managers and 13 staff members who had been involved in the process of developing a multi-purpose service. Results: The main concern of all participants was their anticipation of risk. This anticipation of risk manifested itself in either trust or suspicion and explained their progression through a phase of collaborating. Participants who had trust in other stakeholders were more likely to embrace an integrated health service identity. Those participants, who were suspicious that they would lose status or power, maintained that the previous hospital services provided a better health service and described a coexistence of services within the multi-purpose service. Conclusions: This study provided an insight into the perceptions of community members, staff members and managers involved in the process of developing a multi-purpose service. It revealed that the anticipation of risk was intrinsic to a process of changing from a traditional hospital service to collaborating in a new model of health care provided at a multi-purpose service.
Resumo:
Many of the teaching elements in Civil and Environmental Engineering and Spatial Science/Surveying are strongly related to multidisciplinary real-world situations. Professionals in each discipline commonly work collaboratively, knowing each other’s professional and technical limitations and requirements. Replication of such real-world situations allows students to gain an insight and acquire knowledge of professional practice for both civil engineering and spatial science disciplines. However, replication of an authentic design project is not always possible in a single unit basis where empirical project situations are often created with controlled sets of constraints, inputs and outputs. A cross-disciplinary design-based project that is designed to promote active student learning, engagement and professional integration would be the preferred option. The central aim of this collaborative project was to create positive and inclusive environments to promote engaging learning opportunities that cater for a range of learning styles with a two-way linkage involving third-year civil engineering and spatial science (surveying) students. This paper describes the cross-disciplinary project developed and delivered in 2010 and 2011. A survey was conducted at completion of the project to assess the degree of improvement in student engagement and their learning experiences. Improvements were assessed in a range of dimensions including student motivation, learning by cross-disciplinary collaboration and learning by authentic design project experiences. In this specific cross-disciplinary linkage project, the study findings showed that teaching approaches utilised have been effective in promoting active student learning and increasing engagement.
Resumo:
Building Information Modeling (BIM) is a modern approach to the design, documentation, delivery, and life cycle management of buildings through the use of project information databases coupled with object-based parametric modeling. BIM has the potential to revolutionize the Architecture, Engineering and Construction (AEC) industry in terms of the positive impact it may have on information flows, working relationships between project participants from different disciplines and the resulting benefits it may achieve through improvements to conventional methods. This chapter reviews the development of BIM, the extent to which BIM has been implemented in Australia, and the factors which have affected the up-take of BIM. More specifically, the objectives of this chapter are to investigate the adoption of BIM in the Australian AEC industry and factors that contribute towards the uptake (or non uptake) of BIM. These objectives are met by a review of the related literature in the first instance, followed by the presentation of the results of a 2007 postal questionnaire survey and telephone interviews of a random sample of professionals in the Australian AEC industry. The responses suggest that less than 25 percent of the sample had been involved in BIM – rather less than might be expected from reading the literature. Also, of those who have been involved with BIM, there has been very little interdisciplinary collaboration. The main barriers impeding the implementation of BIM widely across the Australian AEC industry are also identified. These were found to be primarily a lack of BIM expertise, lack of awareness and resistance to change. The benefits experienced as a result of using BIM are also discussed. These include improved design consistency, better coordination, cost savings, higher quality work, greater productivity and increased speed of delivery. In terms of conclusion, some suggestions are made concerning the underlying practical reasons for the slow up-take of BIM and the successes for those early adopters. Prospects for future improvement are discussed and proposals are also made for a large scale worldwide comparative study covering industry-wide participants
Resumo:
In cross-organizational, distributed environments, Business Process Management requires collaborative technologies to facilitate the process of discovering, modeling, and improving business processes across geographical and organizational boundaries. This paper provides a comprehensive understanding of collaborative business process modeling that is based on a review of literature and a case study of three selected modelling tools. The application of the framework reveals that current process modeling tools consider different perspectives on collaboration, and that the included features are orthogonal. This paper informs practitioners about the state of the art in tool support for collaborative process modelling. It also informs vendors about opportunities to enhance the technology support. For research, our paper paper informs social aspects of BPM technology through its explicit focus on the collaboration of BPM stakeholders in the process of distributed modeling.
Resumo:
Reports of increasing numbers of obese Australian children and adolescents have raised the alarm to be proactive in reducing this so called epidemic. It has evoked a call for greater emphasis on teaching physical education in schools, as a measure for attaining fitness not only with obese students but for all students. This paper emphasises how preservice teachers need to be a key target for implementing physical education (PE) reform in schools, as many primary teachers will be generalists and may not be confident enough to implement PE effectively. Through a review of existing literature, teaching practices essential for the effective promotion and implementation of PE were identified under six broad categories: personal-professional skills development, addressing system requirements, pedagogical practices, managing student behaviour, providing feedback to students, and reflecting on practice. Subsequently, the development of these practices in preservice teachers is considered in the context of a university-school collaboration where preservice teachers taught physical education to primary school students for one day per week over a four week period. These authentic teaching experiences provided the preservice teachers with vital opportunities to put theory into practice and interact with “real-world” students. Self-evaluative data from 38 of these preservice teachers, in the form of a five-part Likert scale survey and extended response survey, demonstrated that they were able to develop the majority of the essential teaching practices identified by literature. In particular, the preservice teachers developed self efficacy, enthusiasm, and motivation for teaching PE, facets which are often found to be lacking in generalist primary teachers and yet are essential if children’s perceptions and habits regarding physical activity are to be changed.
Resumo:
Wikis have proved to be very effective collaboration and knowledge management tools in large variety of fields thanks to their simplicity and flexible nature. Another important development for the internet is the emergence of powerful mobile devices supported by fast and reliable wireless networks. The combination of these developments begs the question of how to extend wikis on mobile devices and how to leverage mobile devices' rich modalities to supplement current wikis. Realizing that composing and consuming through auditory channel is the most natural and efficient way for mobile device user, this paper explores the use of audio as the medium of wiki. Our work, as the first step towards this direction, creates a framework called Mobile Audio Wiki which facilitates asynchronous audio-mediated collaboration on the move. In this paper, we present the design of Mobile Audio Wiki. As a part of such design, we propose an innovative approach for a light-weight audio content annotation system for enabling group editing, versioning and cross-linking among audio clips. To elucidate the novel collaboration model introduced by Mobile Audio Wiki, its four usage modes are identified and presented in storyboard format. Finally, we describe the initial design for presentation and navigation of Mobile Audio Wiki.
Resumo:
Purpose: The purpose of this paper is to clarify how end-users’ tacit knowledge can be captured and integrated in an overall business process management (BPM) approach. Current approaches to support stakeholders’ collaboration in the modelling of business processes envision an egalitarian environment where stakeholders interact in the same context, using the same languages and sharing the same perspectives on the business process. Therefore, such stakeholders have to collaborate in the context of process modelling using a language that some of them do not master, and have to integrate their various perspectives. Design/methodology/approach: The paper applies the SECI knowledge management process to analyse the problems of traditional top-down BPM approaches and BPM collaborative modelling tools. Besides, the SECI model is also applied to Wikipedia, a successful Web 2.0-based knowledge management environment, to identify how tacit knowledge is captured in a bottom-up approach. Findings – The paper identifies a set of requirements for a hybrid BPM approach, both top-down and bottom-up, and describes a new BPM method based on a stepwise discovery of knowledge. Originality/value: This new approach, Processpedia, enhances collaborative modelling among stakeholders without enforcing egalitarianism. In Processpedia tacit knowledge is captured and standardised into the organisation’s business processes by fostering an ecological participation of all the stakeholders and capitalising on stakeholders’ distinctive characteristics.
Resumo:
This report discusses findings of a case study into "CADD, BIM and IPD" undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. This case study investigated the evolution that has taken place in the Queensland Department of Public Works Division of Project Services during the last 20 years from: the initial implementation of computer aided design and documentation(CADD); to the experimentation with building information modelling (BIM) from the mid 2000’s; embedding integrated practice (IP); to current steps towards integrated project delivery (IPD) with the integration of contractors in the design/delivery process. This case study should be read in conjunction with Part 1 of this suite of reports.
Resumo:
Collaborative user-led content creation by online communities, or produsage (Bruns 2008), has generated a variety of useful and important resources and other valuable outcomes, from open source software through the Wikipedia to a variety of smaller-scale, specialist projects. These are often seen as standing in an inherent opposition to commercial interests, and attempts to develop collaborations between community content creators and commercial partners have had mixed success rates to date. However, such tension between community and commerce is not inevitable, and there is substantial potential for more fruitful exchanges and collaboration. This article contributes to the development of this understanding by outlining the key underlying principles of such participatory community processes and exploring the potential tensions which could arise between these communities and their potential external partners. It also sketches out potential approaches to resolving them.
Resumo:
Monitoring environmental health is becoming increasingly important as human activity and climate change place greater pressure on global biodiversity. Acoustic sensors provide the ability to collect data passively, objectively and continuously across large areas for extended periods. While these factors make acoustic sensors attractive as autonomous data collectors, there are significant issues associated with large-scale data manipulation and analysis. We present our current research into techniques for analysing large volumes of acoustic data efficiently. We provide an overview of a novel online acoustic environmental workbench and discuss a number of approaches to scaling analysis of acoustic data; online collaboration, manual, automatic and human-in-the loop analysis.
Resumo:
The goal of this research project is to develop specific BIM objects for temporary construction activities which are fully integrated with object design, construction efficiency and safety parameters. Specifically, the project will deliver modularised electronic scaffolding and formwork objects that will allow designers to easily incorporate them into BIM models to facilitate smarter and safer infrastructure and building construction. This research first identified there is currently a distinct lack of BIM objects for temporary construction works resulting in productivity loss during design and construction, and opportunities for improved consideration of safety standards and practices with the design of scaffolding and formwork. This is particularly relevant in Australia, given the “harmonisation” of OHS legislation across all states and territories from 1 January 2012, meaning that enhancements to Queensland practices will have direct application across Australia. Thus, in conjunction with government and industry partners in Queensland, Australia, the research team developed a strategic three-phase research methodology: (1) the preliminary review phase on industrial scaffolding and formwork practices and BIM implementation; (2) the BIM object development phase with specific safety and productivity functions; and (3) the Queensland-wide workshop phase for product dissemination and training. This paper discusses background review findings, details of the developed methodology, and expected research outcomes and their contributions to the Australian construction industry.