756 resultados para Construction set
Resumo:
The microbial mediated production of nitrous oxide (N2O) and its reduction to dinitrogen (N2) via denitrification represents a loss of nitrogen (N) from fertilised agro-ecosystems to the atmosphere. Although denitrification has received great interest by biogeochemists in the last decades, the magnitude of N2lossesand related N2:N2O ratios from soils still are largely unknown due to methodical constraints. We present a novel 15N tracer approach, based on a previous developed tracer method to study denitrification in pure bacterial cultures which was modified for the use on soil incubations in a completely automated laboratory set up. The method uses a background air in the incubation vessels that is replaced with a helium-oxygen gas mixture with a 50-fold reduced N2 background (2 % v/v). This method allows for a direct and sensitive quantification of the N2 and N2O emissions from the soil with isotope-ratio mass spectrometry after 15N labelling of denitrification N substrates and minimises the sensitivity to the intrusion of atmospheric N2 at the same time. The incubation set up was used to determine the influence of different soil moisture levels on N2 and N2O emissions from a sub-tropical pasture soil in Queensland/Australia. The soil was labelled with an equivalent of 50 μg-N per gram dry soil by broadcast application of KNO3solution (4 at.% 15N) and incubated for 3 days at 80% and 100% water filled pore space (WFPS), respectively. The headspace of the incubation vessel was sampled automatically over 12hrs each day and 3 samples (0, 6, and 12 hrs after incubation start) of headspace gas analysed for N2 and N2O with an isotope-ratio mass spectrometer (DELTA V Plus, Thermo Fisher Scientific, Bremen, Germany(. In addition, the soil was analysed for 15N NO3- and NH4+ using the 15N diffusion method, which enabled us to obtain a complete N balance. The method proved to be highly sensitive for N2 and N2O emissions detecting N2O emissions ranging from 20 to 627 μN kg-1soil-1hr-1and N2 emissions ranging from 4.2 to 43 μN kg-1soil-1hr-1for the different treatments. The main end-product of denitrification was N2O for both water contents with N2 accounting for 9% and 13% of the total denitrification losses at 80% and 100%WFPS, respectively. Between 95-100% of the added 15N fertiliser could be recovered. Gross nitrification over the 3 days amounted to 8.6 μN g-1 soil-1 and 4.7 μN g-1 soil-1, denitrification to 4.1 μN g-1 soil-1 and 11.8 μN g-1 soil-1at 80% and 100%WFPS, respectively. The results confirm that the tested method allows for a direct and highly sensitive detection of N2 and N2O fluxes from soils and hence offers a sensitive tool to study denitrification and N turnover in terrestrial agro-ecosystems.
Resumo:
In the global construction context, the Best Value or Most Economically Advantageous Tender is becoming a widespread approach for contractor selection, as an alternative to other traditional awarding criteria such as the Lowest Price. In these multi-attribute tenders, the owner or auctioneer solicits proposals containing both a price bid and additional technical features. Once the proposals are received, each bidder's price bid is given an economic score according to a scoring rule, generally called an Economic Scoring Formula (ESF) and a technical score according to pre-specified criteria. Eventually, the contract is awarded to the bidder with the highest weighted overall score (economic + technical). However, Economic Scoring Formula selection by auctioneers is invariably and paradoxically a highly intuitive process in practice, involving few theoretical or empirical considerations, despite having being considered traditionally and mistakenly as objective, due to its mathematical nature. This paper provides a taxonomic classification of a wide variety of ESF and Abnormally Low Bid Criteria (ALBC) gathered in several countries with different tendering approaches. Practical implications concern the optimal design of price scoring rules in construction contract tenders, as well as future analyses of the effects of ESF and ALBC on competitive bidding behaviour.
Resumo:
How can obstacles to innovation be overcome in road construction? Using a focus group methodology, and based on two prior rounds of empirical work, the analysis in this chapter generates a set of four key solutions to two main construction innovation obstacles: (1) restrictive tender assessment and (2) disagreement over who carries the risk of new product failure. The four key solutions uncovered were: 1) pre-project product certification; 2) past innovation performance assessment; 3) earlier involvement of product suppliers and road asset operators; and 4) performance-based specifications. Additional research is suggested in order to illicit deeper insights into possible solutions to construction innovation obstacles, and should emphasise furthering the theoretical interpretation of empirical phenomena.
Resumo:
The construction industry has long been considered to have unacceptably high injury and fatality rates. Previous research has shown that small construction companies sustain higher injury rates than large companies. However, despite the industry being dominated by a very large number of such small companies, little is known of their occupational health and safety (OHS) needs, practices and constraints. This paper takes a first step in aiming to identify the principal barriers that affect good OHS performance of small construction companies so that effective OHS practices can be developed to improve this in future. The contents of the literature are first summarised, in which three critical barriers to good OHS practice in small construction firms are proposed. They are : cost, time, lack of safety awareness and concern. The results of a questionnaire survey carried out with South East Queensland construction personnel are presented, which largely confirm what is suggested by the literature research and also succeed in providing an indication of their ranking in terms of importance and suggestions for overcoming these barriers. The research results provide a better understanding of the issues that restrict good OHS practice in small construction companies and potential measures for improvement.
Resumo:
Purpose Traditional construction planning relies upon the critical path method (CPM) and bar charts. Both of these methods suffer from visualization and timing issues that could be addressed by 4D technology specifically geared to meet the needs of the construction industry. This paper proposed a new construction planning approach based on simulation by using a game engine. Design/methodology/approach A 4D automatic simulation tool was developed and a case study was carried out. The proposed tool was used to simulate and optimize the plans for the installation of a temporary platform for piling in a civil construction project in Hong Kong. The tool simulated the result of the construction process with three variables: 1) equipment, 2) site layout and 3) schedule. Through this, the construction team was able to repeatedly simulate a range of options. Findings The results indicate that the proposed approach can provide a user-friendly 4D simulation platform for the construction industry. The simulation can also identify the solution being sought by the construction team. The paper also identifies directions for further development of the 4D technology as an aid in construction planning and decision-making. Research limitations/implications The tests on the tool are limited to a single case study and further research is needed to test the use of game engines for construction planning in different construction projects to verify its effectiveness. Future research could also explore the use of alternative game engines and compare their performance and results. Originality/value The authors proposed the use of game engine to simulate the construction process based on resources, working space and construction schedule. The developed tool can be used by end-users without simulation experience.
Resumo:
Construction industry contributes significantly to environmental degradation, and governments in many countries which are endeavouring to address the situation. Malaysia is no exception. This paper examines the path towards green construction project delivery in Malaysia, focusing on current green policies and initiatives by governments. The historical waves in Malaysian approaches to tackling environmental issues are described, starting from the early 20th century, through the 1990s to the present, and the influence of these approaches on construction practices is analysed. Based on the findings of policy review, essential green construction practices aimed at mitigating the adverse effects of construction activities on the environment in Malaysia were identified. This paper paves the way for future studies in construction and sustainability in Malaysia, especially for the Southeast Asian region where sustainability practices are urgently needed.
Resumo:
With the current emerging development pattern in Malaysia, Malaysian government has enthusiastically promoted green procurement approach that will help the construction project being green. Previous studies highlighted that the concept of green procurement is still very new to the Malaysian construction industry, and this increases the needs for further research in this area. This paper addresses the needs of guidelines for stakeholders to procure environmentally-friendly construction. Currently, there is a limited practical guideline for stakeholders to procure green projects. This paper discusses the progress to date of a research project aimed at developing a green procurement framework for construction projects in the Malaysian construction industry. This framework will guide the stakeholders to plan the green procurement implementation to procure a construction projects. Through literature and expert opinion, this paper explores the list of green practices within procurement practices which becomes the basis to develop a survey instrument that will be used in the later part of this study. The paper will shed useful information for construction researchers and practitioners in exploring the green procurement concept for construction industry in Malaysia.
Resumo:
Construction projects have a negative impact on the environment. As Malaysia is planning more construction projects to cater for its current and future development needs, practitioners are urged to undertake greener approaches to construction. One of the efforts is the introduction of green procurement, which is promoted under the Malaysian Government’s MyHijau initiative. Construction procurement is recognised as a tool to shift the construction business into a greener industry. However, the implementation of green procurement in Malaysia is still in its infancy and faces a number of challenges, such as the lack of knowledge. A significant gap has been found between policy formulation and actual project delivery as there are no practical guidelines for stakeholders to procure environmental-friendly construction projects. To address this problem, the present research (as part of an ongoing PhD project) aims to develop a green procurement framework that guides stakeholders in procuring green projects in Malaysia. This article highlights the concept of green procurement in Malaysia, the work carried out to date to achieve the research objectives and the preliminary framework that has been established. It is hoped that this research will help academics and practitioners to further explore the potential of green procurement to improve sustainability in the current construction industry practices.
Resumo:
Employees’ safety climate perceptions dictate their safety behavior because individuals act based on their perceptions of reality. Extensive empirical research in applied psychology has confirmed this relationship. However, rare efforts have been made to investigate the factors contributing to a favorable safety climate in construction research. As an initial effort to address the knowledge gap, this paper examines factors contributing to a psychological safety climate, an operationalization of a safety climate at the individual level, and, hence, the basic element of a safety climate at higher levels. A multiperspective framework of contributors to a psychological safety climate is estimated by a structural equation modeling technique using individual questionnaire responses from a random sample of construction project personnel. The results inform management of three routes to psychological safety climate: a client’s proactive involvement in safety management, a workforce-friendly workplace created by the project team, and transformational supervisors’ communication about safety matters with the workforce. This paper contributes to the field of construction engineering and management by highlighting a broader contextual influence in a systematic formation of psychological safety climate perceptions.
Resumo:
The design-build (DB) delivery method has been widely used in the United States due to its reputed superior cost and time performance. However, rigorous studies have produced inconclusive support and only in terms of overall results, with few attempts being made to relate project characteristics with performance levels. This paper provides a larger and more finely grained analysis of a set of 418 DB projects from the online project database of the Design-Build Institute of America (DBIA), in terms of the time-overrun rate (TOR), early start rate (ESR), early completion rate (ECR) and cost overrun rate (COR) associated with project type (e.g., commercial/institutional buildings and civil infrastructure projects), owners (e.g., Department of Defense and private corporations), procurement methods (e.g., ‘best value with discussion’ and qualifications-based selection), contract methods (e.g., lump sum and GMP) and LEED levels (e.g., gold and silver). The results show ‘best value with discussion’ to be the dominant procurement method and lump sum the most frequently used contract method. The DB method provides relatively good time performance, with more than 75% of DB projects completed on time or before schedule. However, with more than 50% of DB projects cost overrunning, the DB advantage of cost saving remains uncertain. ANOVA tests indicate that DB projects within different procurement methods have significantly different time performance and that different owner types and contract methods significantly affect cost performance. In addition to contributing to empirical knowledge concerning the cost and time performance of DB projects with new solid evidence from a large sample size, the findings and practical implications of this study are beneficial to owners in understanding the likely schedule and budget implications involved for their particular project characteristics.
Resumo:
The construction industry accounts for a significant portion of the material consumption of our industrialised societies. That material consumption comes at an environmental cost, and when buildings and infrastructure projects are demolished and discarded, after their useful lifespan, that environmental cost remains largely unrecovered. The expected operational lifespan of modern buildings has become disturbingly short as buildings are replaced for reasons of changing cultural expectations, style, serviceability, locational obsolescence and economic viability. The same buildings however are not always physically or structurally obsolete; the materials and components within them are very often still completely serviceable. While there is some activity in the area of recycling of selected construction materials, such as steel and concrete, this is almost always in the form of down cycling or reprocessing. Very little of this material and component resource is reuse in a way that more effectively captures its potential. One significant impediment to such reuse is that buildings are not designed in a way that facilitates easy recovery of materials and components; they are designed and built for speed of construction and quick economic returns, with little or no consideration of the longer term consequences of their physical matter. This research project explores the potential for the recovery of materials and components if buildings were designed for such future recovery; a strategy of design for disassembly. This is not a new design philosophy; design for disassembly is well understood in product design and industrial design. There are also some architectural examples of design for disassembly; however these are specialist examples and there is no significant attempt to implement the strategy in the main stream construction industry. This paper presents research into the analysis of the embodied energy in buildings, highlighting its significance in comparison with operational energy. Analysis at material, component, and whole-of-building levels shows the potential benefits of strategically designing buildings for future disassembly to recover this embodied energy. Careful consideration at the early design stage can result in the deconstruction of significant portions of buildings and the recovery of their potential through higher order reuse and upcycling.
Resumo:
The importance of developing effective disaster management strategies has significantly grown as the world continues to be confronted with unprecedented disastrous events. Factors such as climate instability, recent urbanization along with rapid population growth in many cities around the world have unwittingly exacerbated the risks of potential disasters, leaving a large number of people and infrastructure exposed to new forms of threats from natural disasters such as flooding, cyclones, and earthquakes. With disasters on the rise, effective recovery planning of the built environment is becoming imperative as it is not only closely related to the well-being and essential functioning of society, but it also requires significant financial commitment. In the built environment context, post-disaster reconstruction focuses essentially on the repair and reconstruction of physical infrastructures. The reconstruction and rehabilitation efforts are generally performed in the form of collaborative partnerships that involve multiple organisations, enabling the restoration of interdependencies that exist between infrastructure systems such as energy, water (including wastewater), transport, and telecommunication systems. These interdependencies are major determinants of vulnerabilities and risks encountered by critical infrastructures and therefore have significant implications for post-disaster recovery. When disrupted by natural disasters, such interdependencies have the potential to promote the propagation of failures between critical infrastructures at various levels, and thus can have dire consequences on reconstruction activities. This paper outlines the results of a pilot study on how elements of infrastructure interdependencies have the potential to impede the post-disaster recovery effort. Using a set of unstructured interview questionnaires, plausible arguments provided by seven respondents revealed that during post-disaster recovery, critical infrastructures are mutually dependent on each other’s uninterrupted availability, both physically and through a host of information and communication technologies. Major disruption to their physical and cyber interdependencies could lead to cascading failures, which could delay the recovery effort. Thus, the existing interrelationship between critical infrastructures requires that the entire interconnected network be considered when managing reconstruction activities during the post-disaster recovery period.
Resumo:
This workshop comprised a diverse group of African construction experts, ranging far wider than RSA. Each of the attendees had attended the annual ASOCSA conference and was additionally provided with a short workshop pre-brief. The aim was to develop a view of their 15-20 year vision of construction improvement in RSA and the steps necessary to get there. These included sociological, structural, technical and process changes. Whilst some suggestions are significantly challenging, none are impossible, given sufficient collaboration between government, industry, academia and NGOs. The highest priority projects (more properly, programmes) were identified and further explored. These are: 1. Information Hub (‘Open Africa’). Aim – to utilise emerging trends in Open Data to provide a force for African unity. 2. Workforce Development. Aim – to rebuild a competent, skilled construction industry for RSA projects and for export. 3. Modular DIY Building. Aim – to accelerate the development of sustainable, cost-efficient and desirable housing for African economic immigrants and others living in makeshift and slum dwellings. Open Data is a maturing theme in different cities and governments around the world and the workshop attendees were very keen to seize such a possibility to assist in developing an environment where Africans can share information and foster collaboration. It is likely that NGOs might be keen to follow up such an initiative. There are significant developments taking place around the world in the construction sector currently, with comparatively large savings being made for taxpayers (20% plus in the UK). Not all of these changes would be easy to transplant to RSA (even more so to much of the rest of Africa). Workforce development was a keen plea amongst the attendees, who seemed concerned that expertise has leaked away and is not being replaced with sufficient intensity. It is possible today to develop modular buildings in such a way that even unskilled residents can assist in their construction, and even their appropriate design. These buildings can be sited nearly autonomously from infrastructures, thus relieving the tensions on cities and townships, whilst providing humane accommodation for the economically disadvantaged. Development of suitable solutions could either be conducted with other similarly stressed countries or developed in-country and the expertise exported. Finally, it should be pointed out that this was very much a first step. Any opportunity to collaborate from an Australian, QUT or CIB perspective would be welcomed, whilst acknowledging that the leading roles belong to RSA, CSIR, NRF, ASOCSA and the University of KwaZulu-Natal.
Resumo:
The Australian construction industry is often criticized for its comparatively low productivity. The most significant future productivity gains are predicted to arise from improvement in the firm’s project management. Information Communication Technologies (ICTs) are thought to offer such improvement. ICT adoption is particularly poor among Small and Medium Enterprises (SMEs). Existing studies provide only a general overview of adoption and diffusion of ICTs in SMEs, with no previous research measuring their readiness to adopt ICT. This paper outlines a theoretical approach to address this gap, exploring how to improve ICT adoption in Australian construction SMEs. A review of literature is undertaken to address the research question ‘What is the best conceptual approach to understanding ICT adoption in SMEs?’ The results emphasize the efficacy of a novel Technology Readiness and Acceptance Model (TRAM) to assess SMEs’ ICT implementation readiness. The proposed model consists of four major constructs to measure readiness comprising: - (1) optimism, - (2) innovativeness, - (3) discomfort and - (4) insecurity; two major constructs to measure technological acceptance comprising: - (1) perceived ease of use and - (2) perceived usefulness; and two extension variables comprising: - (1) self-efficacy and - (2) facilitating conditions. A limitation is that the performance of the conceptual model is yet to be tested empirically. Such research is planned in the coming year by the authors.
Resumo:
Workplace stress has been an increasing concern in the construction industry. Workers are working longer hours and construction managers’ responsibilities are becoming more complex and complicated due to reduced resources and widespread stakeholder involvements. These additional pressures potentially trigger workplace stress and impact on project performance. The purpose of this study is to examine and advance understanding of stress and its impact relationships that support holistic and strategic stress management. 17 key stress sources are identified with their impact relationships on different stress types examined. Based on the research findings, this paper concludes with a Stressor-Stress-Performance relationships map.