686 resultados para Training project
Resumo:
Purpose: Hyperactive platelets contribute to the thrombotic response in humans, and exercise transiently increases platelet function. Caffeine is routinely used by athletes as an ergogenic aid, but the combined effect of exercise and caffeine on platelet function has not been investigated. Methods: Twelve healthy males were randomly assigned to one of four groups and undertook four experimental trials of a high-intensity aerobic interval training (AIT) bout or rest with ingestion of caffeine (3 mg·kg-1) or placebo. AIT was 8 × 5 min at approximately 75% peak power output (approximately 80% V?O2peak) and 1-min recovery (approximately 40% peak power output, approximately 50% V?O2peak) intervals. Blood/urine was collected before, 60, and 90 min after capsule ingestion and analyzed for platelet aggregation/activation. Results: AIT increased platelet reactivity to adenosine diphosphate (placebo 30.3%, caffeine 13.4%, P < 0.05) and collagen (placebo 10.8%, caffeine 5.1%, P < 0.05) compared with rest. Exercise placebo increased adenosine diphosphate-induced aggregation 90 min postingestion compared with baseline (40.5%, P < 0.05), but the increase when exercise was combined with caffeine was small (6.6%). During the resting caffeine protocol, collagen-induced aggregation was reduced (-4.3%, P < 0.05). AIT increased expression of platelet activation marker PAC-1 with exercise placebo (P < 0.05) but not when combined with caffeine. Conclusion: A single bout of AIT increases platelet function, but caffeine ingestion (3 mg·kg) does not exacerbate platelet function at rest or in response to AIT. Our results provide new information showing caffeine at a dose that can elicit ergogenic effects on performance has no detrimental effect on platelet function and may have the potential to attenuate increases in platelet activation and aggregation when undertaking strenuous exercise.
Resumo:
Skeletal muscle is a malleable tissue capable of altering the type and amount of protein in response to disruptions to cellular homeostasis. The process of exercise-induced adaptation in skeletal muscle involves a multitude of signalling mechanisms initiating replication of specific DNA genetic sequences, enabling subsequent translation of the genetic message and ultimately generating a series of amino acids that form new proteins. The functional consequences of these adaptations are determined by training volume, intensity and frequency, and the half-life of the protein. Moreover, many features of the training adaptation are specific to the type of stimulus, such as the mode of exercise. Prolonged endurance training elicits a variety of metabolic and morphological changes, including mitochondrial biogenesis, fast-to-slow fibre-type transformation and substrate metabolism. In contrast, heavy resistance exercise stimulates synthesis of contractile proteins responsible for muscle hypertrophy and increases in maximal contractile force output. Concomitant with the vastly different functional outcomes induced by these diverse exercise modes, the genetic and molecular mechanisms of adaptation are distinct. With recent advances in technology, it is now possible to study the effects of various training interventions on a variety of signalling proteins and early-response genes in skeletal muscle. Although it cannot presently be claimed that such scientific endeavours have influenced the training practices of elite athletes, these new and exciting technologies have provided insight into how current training techniques result in specific muscular adaptations, and may ultimately provide clues for future and novel training methodologies. Greater knowledge of the mechanisms and interaction of exercise-induced adaptive pathways in skeletal muscle is important for our understanding of the aetiology of disease, maintenance of metabolic and functional capacity with aging, and training for athletic performance. This article highlights the effects of exercise on molecular and genetic mechanisms of training adaptation in skeletal muscle.
Resumo:
In this commentary the authors discuss the molecular basis of the training adaptation and review the role of several key signaling proteins important in the adaptation to endurance and resistance training.
Resumo:
Purpose The objectives of this study were to examine the effect of 4-week moderate- and high-intensity interval training (MIIT and HIIT) on fat oxidation and the responses of blood lactate (BLa) and rating of perceived exertion (RPE). Methods Ten overweight/obese men (age = 29 ±3.7 years, BMI = 30.7 ±3.4 kg/m2) participated in a cross-over study of 4-week MIIT and HIIT training. The MIIT training sessions consisted of 5-min cycling stages at mechanical workloads 20% above and 20% below 45%VO2peak. The HIIT sessions consisted of intervals of 30-s work at 90%VO2peak and 30-s rest. Pre- and post-training assessments included VO2max using a graded exercise test (GXT) and fat oxidation using a 45-min constant-load test at 45%VO2max. BLa and RPE were also measured during the constant-load exercise test. Results There were no significant changes in body composition with either intervention. There were significant increases in fat oxidation after MIIT and HIIT (p ≤ 0.01), with no effect of intensity. BLa during the constant-load exercise test significantly decreased after MIIT and HIIT (p ≤ 0.01), and the difference between MIIT and HIIT was not significant (p = 0.09). RPE significantly decreased after HIIT greater than MIIT (p ≤ 0.05). Conclusion Interval training can increase fat oxidation with no effect of exercise intensity, but BLa and RPE decreased after HIIT to greater extent than MIIT.
Resumo:
Defence projects are typically undertaken within a multi-project-management environment where a common agenda of project managers is to achieve higher project efficiency. This study adopted a multi-facet qualitative approach to investigate factors contributing to or impeding project efficiency in the Defence sector. Semi-structured interviews were undertaken to identify additional factors to those compiled from the literature survey. This was followed by a three-round Delphi study to examine the perceived critical factors of project efficiency. The results showed that project efficiency in the Defence sector went beyond its traditional internally focused scope to one that is externally focused. As a result, efforts are needed on not only those factors related to individual projects but also those factors related to project inter-dependencies and external customers. The management of these factors will help to enhance the efficiency of a project within the Defence sector.
Resumo:
Purpose - Cultural issues in the construction industry have attracted growing attention from both practitioners and academia. However, there are few studies on culture issues at the project level. The influence of project culture has not traditionally been on the research radar. This research aims to investigate the impacts of project culture on the performance of construction projects. Design/methodology/approach - A case study approach, utilising questionnaire surveys, in-depth interviews and review of project documents, was employed to investigate project culture and its associated impacts in two major hospital projects. Findings - The results indicated that project culture played an important role in achieving harmonious relationships between project participants and better project outcomes in terms of schedule, functionality, satisfaction with the process, satisfaction with the relationships, environmental issues addressed commercial success, further business opportunities and overall performance. Case 1 outperformed Case 2 in these performance indicators. Similarly, it became clear that the project’s culture should be developed from the outset and sustained during the project period. Furthermore, it was also highlighted that the project culture should be translated to all levels of the supply chain i.e. sub-contractors and suppliers. Practical implications – The findings enabled the client to understand the role of project culture and actively commit towards the development and maintenance of the project culture from very early on. It also helps project teams to understand how to deal with cultural issues at the project level. Originality/value- This study is one of limited empirical studies that offer in-depth insights of how project culture affects the performance of construction projects. It is also the first study of hospital projects on the research topic.
Resumo:
Managing public sector projects in Malaysia is a unique challenge. This is because of the ethical issues involved during the project procurement process. These ethical issues need attention because they will have an impact on the quality, cost and time of the project itself. The ethical issues here include conflict of interest, bid shopping, collusive tendering, bid cutting, corruption and the payment game. In 2006, 17.3% of 417 Malaysian government contract projects were considered sick due to contractors' performances that failed to conduct the project according to the project plan. Some of the sick projects from these statistics are due to the ethical issues involved. These construction projects have low quality due to the selection of the contractors, done unethically due to personal relationships instead of professional qualifications. That is why it is important to govern the project procurement processes to ensure the accountability and transparency of the decision making process to ensure that these ethical issues can be avoided. Extensive research has been conducted on the ethical issues in the tendering process or the award phase of project management. There is a lack of studies looking at the role of clients, including the government client, in relation to unethical practice in project procurement in the public sector. It is important to understand that ethical issues not only involve the contractors and suppliers but also the clients. Even though there are codes of ethics in the public sectors, ethical issues still arise. Therefore, this research develops a project governance framework (PGEDM) for ethical decision making in the Malaysian public sectors. This framework combines the ethical decision making process together with the project governance principals in guiding the public sectors with ethical decision making in project procurement. A triangulation of questionnaire survey and Delphi study was employed in this research to collect required qualitative and quantitative data. A questionnaire survey was conducted among the public officials (the practitioners) who are currently working in the procurement area in the Malaysian public sectors, in identifying the ethical behaviours and factors influencing further ethical behaviour to occur. A Delphi study was also conducted with the assistance of a panel of experts consisting of practitioners that have expertise in the area of project governance and project procurement as well as academician, which further considered the relationship and the influence of the criteria and indicators of ethical decision making (EDM) and project governance (project criteria, organisational culture, contract award criteria, individual criteria, client's requirements, government procedures and professional ethics). Through the identification and integration of the factors and EDM criteria as well as the project governance criteria and EDM steps for ethical issues, a PGEDM framework was developed to promote, and drive consistent decision outcome in project procurement in the public sector. The framework contributes significantly to ethical decision making in the project procurement process. These findings not only give benefit to the people involved in project procurement but also to the public officials in guiding them to be more accountable in handling ethical issues in the future and to have a more transparent decision making process.
Resumo:
Nowadays, most of the infrastructure development projects undertaken are complex in nature. Practically, public clients who do not have a good understanding of the design and management may suffer severe losses, especially for infrastructure projects. There is a need for luring the right consultant to secure client's investment in infrastructure developments. Throughout the project life cycle, consultants play vital role from the inception to completion stage of a project. A few studies in Malaysia show that infrastructure projects involving irrigation and drainage have experience problems such as poor workmanship, delay and cost overrun due to the consultant's inability or the client incompetence of recruiting consultants in time. This highlights the need of aided decision making and an efficient system to select the best consultant by using Decision Support System (DSS). On the other hand, recent trends reveal that most DSS in construction only concentrate on decision model development. These models are impractical and unused as they are complicated or difficult for laymen such as project managers to utilize. Thus, this research attempts to develop an efficient DSS for consultant selection namely consultDeSS. Driven by the motivation and research aims, this study deployed Design Science Research Methodology (DSRM) dominant with a combination of case studies at the Malaysian Department of Irrigation and Drainage (DID). Two real projects involving irrigation and drainage infrastructure were used to design, implement and evaluate the artefact. The 3-tier consultDeSS was revised after the evaluation and the design was significantly improved based on user feedback. By developing desirable tools that fit client's needs will enhance the productivity and minimize conflict within groups and organisations. The tool is more usable and efficient compared to previous studies in construction. Thus, this research has demonstrated a purposeful artefact with a practical and valid structured development approach that is applicable in a variety of problems in construction discipline.
Resumo:
The Beyond Compliance project, which began in July 2011 with funding from the Standards and Trade Development Facility for 2 years, aims to enhance competency and confidence in the South East Asian sub-region by applying a Systems Approach for pest risk management. The Systems Approach involves the use of integrated measures, at least two of which are independent, that cumulatively reduce the risk of introducing exotic pests through trade. Although useful in circumstances where single measures are inappropriate or unavailable, the Systems Approach is inherently more complicated than single-measure approaches, which may inhibit its uptake. The project methodology is to take prototype decision-support tools, such as Control Point-Bayesian Networks (CP-BN), developed in recent plant health initiatives in other regions, including the European PRATIQUE project, and to refine them within this sub-regional context. Case studies of high-priority potential agricultural trade will be conducted by National Plant Protection Organizations of participating South East Asian countries in trials of the tools, before further modifications. Longer term outcomes may include: more robust pest risk management in the region (for exports and imports); greater inclusion of stakeholders in development of pest risk management plans; increased confidence in trade negotiations; and new opportunities for trade.
Resumo:
Scooter and moped sales have increased at a faster rate than motorcycle sales over the last decade in countries such as Australia, Canada and the United States. This may be particularly evident in jurisdictions where moped riding is permitted for car license holders and a motorcycle license is not required, such as in Queensland, Australia. Having historically comprised only a small proportion of powered two-wheelers (PTWs) outside of Europe and Asia, the safety of scooters and mopeds has received relatively little focused research attention. However, the recent trends in sales and crash involvement have stimulated greater interest in these PTW types. The current paper examines differences and similarities between scooters (over 50cc), mopeds (up to 50cc) and motorcycles in crash involvement and crash characteristics through analyses of crash and registration data from Queensland, Australia. The main findings include that moped and scooter riders are similar in terms of usage patterns, but the evidence suggests superior skills, greater experience and safer behaviour among scooter riders than moped riders. The requirement in Queensland for scooter riders but not moped riders to hold a motorcycle license, usually obtained through competency-based training and assessment, may help to explain some of this difference. Findings also suggest that scooter riders are safer than motorcycle riders in some respects, despite both being subject to the same licensing requirements which encourage participation in rider training. Safer attitudes and motivations rather than superior skills and knowledge may therefore underlie the differences between scooter and motorcycle riders. In summary, riders of larger scooters exhibit a combination of skills and behavior suggestive of safer riding than both their moped and motorcycle riding counterparts. It is reasonable to expect that mopeds and scooters will remain popular and that their usage may increase further, along with that of motorcycles. This research therefore has important practical implications regarding pathways to improved PTW safety. Future policy and planning should consider options for encouraging moped riders to acquire better riding skills and greater safety awareness, as apparent among scooter riders, including rider training, education and licensing. As is noted in recent literature and reflected in some contemporary rider training programs, motorcycle safety may be improved by addressing rider attitudes more comprehensively in addition to developing skills and knowledge.
Resumo:
Defining success in mega projects has been a challenging exercise for Australian Defence. The inherent conflict between nation capability building and cost efficiency raises questions about how to appropriately define mega project success. Contrary to the traditional output-focused project methodology, the value creation perspective argues for the importance of creating new knowledge, processes, and systems for suppliers and customers. Stakeholder involvement is important in this new perspective, as the balancing of competing needs of stakeholders in mega projects becomes a major challenge in managing the value co-creation process. In our earlier study reported interview data from three Australian defence mega projects and reported that those senior executives have a more complex understanding of project success than traditional iron triangle measures. In these mega defence projects, customers and other stakeholders actively engage in the value creation process, and over time both content and process value are created to increase defence and national capability. Value created and captured during and post projects are the key to true success. We aim to develop a comprehensive theoretical model the capture the value co-creation process as a way of re-conceptualising success in mega projects. We propose a new framework redefine project value as multi-dimensional, contextual and temporal construct that emerges from the interactions among multiple stake holders over the complete project life cycle. The framework distinguishes between exploitation and exploration types of projects, and takes into consideration the requisite governance structures.
Resumo:
In this paper, we develop two stakeholder relationships scales. These scales assess project managers’ perceived competence in establishing and maintaining high quality, effective relationships with people internal to the project as well as those stakeholders who are external to the project. We developed the scales using an online survey study of three hundred and seventy three complex project managers from a sub-set of the Australian Defence Industry. Both the internal stakeholder relationships’ scale and the external stakeholder relationships’ scale demonstrated validity and reliability. This research has implications for the interpersonal work relationships’ literature and the stakeholder management literature. We recommend future research tests these scales with multiple samples, across different project types and project industries. The stakeholder relationships’ scales should be versatile enough to be applied to project management generally but are best suited to large-scale complex project environments.
Enhancing people capabilities for the promotion of sustainability in facilities management practices
Resumo:
Sustainability has become an important principle to be pursued throughout the life-cycles of project development. Facility managers are in a commanding position to maximise the potential of sustainability. Sustainability endeavours in facility management (FM) practices will not only contribute to reducing energy consumption and waste, but will also help increase organisational productivity, financial returns and standing in the community. At the forefront of sustainable practices, FM professionals can exercise a great deal of influence through operational and strategic management and they should be empowered with the necessary knowledge and capabilities. However, literature studies suggest that there is a gap between the level of awareness and knowledge and the necessary skills required to promote sustainability endeavours in the FM profession. Therefore, it is worthwhile to reflect on people capability issues since it is considered as the key enabler in managing the sustainability agenda as well as being central to the improvement of competency and innovation in an organization. This paper aims to identify the critical factors for enhancing people capabilities in promoting the sustainability agenda in the FM sector. To achieve this objective, a total of 60 factors were identified through a comprehensive literature review and then a questionnaire survey with 52 respondents was conducted to collect the perceived importance of these factors. The survey analysis revealed 23 critical factors as significantly important. These critical factors will serve as the basis for the establishment of a mechanism to equip facility managers with the right knowledge, to continue education and training and to develop new mind-sets to enhance the implementation of sustainability measures in FM practices.
Resumo:
Custom designed for display on the Cube Installation situated in the new Science and Engineering Centre (SEC) at QUT, the ECOS project is a playful interface that uses real-time weather data to simulate how a five-star energy building operates in climates all over the world. In collaboration with the SEC building managers, the ECOS Project incorporates energy consumption and generation data of the building into an interactive simulation, which is both engaging to users and highly informative, and which invites play and reflection on the roles of green buildings. ECOS focuses on the principle that humans can have both a positive and negative impact on ecosystems with both local and global consequence. The ECOS project draws on the practice of Eco-Visualisation, a term used to encapsulate the important merging of environmental data visualization with the philosophy of sustainability. Holmes (2007) uses the term Eco-Visualisation (EV) to refer to data visualisations that ‘display the real time consumption statistics of key environmental resources for the goal of promoting ecological literacy’. EVs are commonly artifacts of interaction design, information design, interface design and industrial design, but are informed by various intellectual disciplines that have shared interests in sustainability. As a result of surveying a number of projects, Pierce, Odom and Blevis (2008) outline strategies for designing and evaluating effective EVs, including ‘connecting behavior to material impacts of consumption, encouraging playful engagement and exploration with energy, raising public awareness and facilitating discussion, and stimulating critical reflection.’ Consequently, Froehlich (2010) and his colleagues also use the term ‘Eco-feedback technology’ to describe the same field. ‘Green IT’ is another variation which Tomlinson (2010) describes as a ‘field at the juncture of two trends… the growing concern over environmental issues’ and ‘the use of digital tools and techniques for manipulating information.’ The ECOS Project team is guided by these principles, but more importantly, propose an example for how these principles may be achieved. The ECOS Project presents a simplified interface to the very complex domain of thermodynamic and climate modeling. From a mathematical perspective, the simulation can be divided into two models, which interact and compete for balance – the comfort of ECOS’ virtual denizens and the ecological and environmental health of the virtual world. The comfort model is based on the study of psychometrics, and specifically those relating to human comfort. This provides baseline micro-climatic values for what constitutes a comfortable working environment within the QUT SEC buildings. The difference between the ambient outside temperature (as determined by polling the Google Weather API for live weather data) and the internal thermostat of the building (as set by the user) allows us to estimate the energy required to either heat or cool the building. Once the energy requirements can be ascertained, this is then balanced with the ability of the building to produce enough power from green energy sources (solar, wind and gas) to cover its energy requirements. Calculating the relative amount of energy produced by wind and solar can be done by, in the case of solar for example, considering the size of panel and the amount of solar radiation it is receiving at any given time, which in turn can be estimated based on the temperature and conditions returned by the live weather API. Some of these variables can be altered by the user, allowing them to attempt to optimize the health of the building. The variables that can be changed are the budget allocated to green energy sources such as the Solar Panels, Wind Generator and the Air conditioning to control the internal building temperature. These variables influence the energy input and output variables, modeled on the real energy usage statistics drawn from the SEC data provided by the building managers.