781 resultados para Infrastructure sustainability rating tool
Resumo:
Conditions of bridges deteriorate with age, due to different critical factors including, changes in loading, fatigue, environmental effects and natural events. In order to rate a network of bridges, based on their structural condition, the condition of the components of a bridge and their effects on behaviour of the bridge should be reliably estimated. In this paper, a new method for quantifying the criticality and vulnerability of the components of the railway bridges in a network will be introduced. The type of structural analyses for identifying the criticality of the components for carrying train loads will be determined. In addition to that, the analytical methods for identifying the vulnerability of the components to natural events whose probability of occurrence is important, such as, flood, wind, earthquake and collision will be determined. In order to maintain the practicality of this method to be applied to a network of thousands of railway bridges, the simplicity of structural analysis has been taken into account. Demand by capacity ratios of the components at both safety and serviceability condition states as well as weighting factors used in current bridge management systems (BMS) are taken into consideration. It will be explained what types of information related to the structural condition of a bridge is required to be obtained, recorded and analysed. The authors of this paper will use this method in a new rating system introduced previously. Enhancing accuracy and reliability of evaluating and predicting the vulnerability of railway bridges to environmental effects and natural events will be the significant achievement of this research.
Rating defence major project success : the role of personal attributes and stakeholder relationships
Resumo:
In this paper we develop and test a model of the associations between major project managers' personal attributes and project success in the context of the Australian Defence industry. In our model, emotional intelligence, cognitive flexibility and systemic thinking were hypothesised to relate to project success, mediated by internal and external stakeholder relationships. The model was tested in an online survey with 373 major project managers. Emotional intelligence and cognitive flexibility were found to be related to the development, quality and effectiveness of major project managers' relationships with both internal and external stakeholders; and these in turn were associated with their ratings of project success. Systemic thinking, however, had no relationship with either stakeholder relationships or project success. Additional research is needed to examine the contribution of a wider range of personal attributes to stakeholder relationships and project success, and to assess whether this model is applicable in other industries and types of projects.
Resumo:
This paper reflects on the wider potential of digital narratives as a useful tool for social work practitioners. Despite the multiple points of connection between narrative approaches and social work, the influence of narratives on practice remains limited. A case study of a digital storytelling (DST) process employed in a research project with a small group of lone mothers from refugee backgrounds is used to trigger discussion of broader applications of DST as part of everyday social work practice. The use of DST acknowledged women’s capacities for self-representation and agency, in line with participatory and strengths-based approaches inherent in contemporary social work. The benefits of using DST with lone mothers from refugee backgrounds illustrate how this method can act as a pathway to produce counter-narratives, both at the individual and broader community levels. Documenting life stories digitally provides the opportunity to construct narratives about experiences of relocation and settlement as tools for social advocacy, which can assist social workers to ensure meaningful outcomes for service-users. These propositions can serve to inform social work practices with people from refugee backgrounds and address some of the intricacies of working in diverse and challenging contexts.
Resumo:
Earthwork planning has been considered in this article and a generic block partitioning and modelling approach has been devised to provide strategic plans of various levels of detail. Conceptually this approach is more accurate and comprehensive than others, for instance those that are section based. In response to environmental concerns the metric for decision making was fuel consumption and emissions. Haulage distance and gradient are also included as they are important components of these metrics. Advantageously the fuel consumption metric is generic and captures the physical difficulties of travelling over inclines of different gradients, that is consistent across all hauling vehicles. For validation, the proposed models and techniques have been applied to a real world road project. The numerical investigations have demonstrated that the models can be solved with relatively little CPU time. The proposed block models also result in solutions of superior quality, i.e. they have reduced fuel consumption and cost. Furthermore the plans differ considerably from those based solely upon a distance based metric thus demonstrating a need for industry to reflect upon their current practices.
Resumo:
Government action is essential to increase the healthiness of food environments and reduce obesity, diet-related non-communicable diseases (NCDs), and their related inequalities. This paper proposes a monitoring framework to assess government policies and actions for creating healthy food environments. Recommendations from relevant authoritative organizations and expert advisory groups for reducing obesity and NCDs were examined, and pertinent components were incorporated into a comprehensive framework for monitoring government policies and actions. A Government Healthy Food Environment Policy Index (Food-EPI) was developed, which comprises a ‘policy’ component with seven domains on specific aspects of food environments, and an ‘infrastructure support’ component with seven domains to strengthen systems to prevent obesity and NCDs. These were revised through a week-long consultation process with international experts. Examples of good practice statements are proposed within each domain, and these will evolve into benchmarks established by governments at the forefront of creating and implementing food policies for good health. A rating process is proposed to assess a government's level of policy implementation towards good practice. The Food-EPI will be pre-tested and piloted in countries of varying size and income levels. The benchmarking of government policy implementation has the potential to catalyse greater action to reduce obesity and NCDs.
Resumo:
The use of hedonic models to estimate the effects of various factors on house prices is well established. This paper examines a number of international hedonic house price models that seek to quantify the effect of infrastructure charges on new house prices. This work is an important factor in the housing affordability debate, with many governments in high growth areas having user-pays infrastructure charging policies operating in tandem with housing affordability objectives, with no empirical evidence on the impact of one on the other. This research finds there is little consistency between existing models and the data sets utilised. Specification appears dependent upon data availability rather than sound theoretical grounding. This may lead to a lack of external validity with model specification dependent upon data availability rather than sound theoretical grounding.
Resumo:
OBJECTIVE: To assess the long term effect of a nutrition program in a remote Aboriginal community (Minjilang). DESIGN: Evaluation of nutritional outcomes over the three years before and the three years after a health and nutrition program that ran from June 1989 to June 1990. Turnover of food items at the community store was used as a measure of dietary intake at Minjilang and a comparison community. SETTING: A community of about 150 Aboriginal people live at Minjilang on Croker Island, 240 km north-east of Darwin. A similar community of about 300 people on another island was used as the comparison. RESULTS: The program produced lasting improvements in dietary intake of most target foods (including fruit, vegetables and wholegrain bread) and nutrients (including folate, ascorbic acid and thiamine). Sugar intake fell in both communities before the program, but the additional decrease in sugar consumption during the program at Minjilang "rebounded" in the next year. Dietary improvements in the comparison community were delayed and smaller than at Minjilang. CONCLUSIONS: The success of the program at Minjilang was linked to an ongoing process of social change, which in turn provided a stimulus for dietary improvement in the comparison community. When Aboriginal people themselves control and maintain ownership of community-based intervention programs, nutritional improvements can be initiated and sustained.
Resumo:
Objective This investigation utilised the expertise of allied members of multidisciplinary teams working in emergency care settings to develop and validate a Rapid Assessment Prioritisation and Referral Tool (RAPaRT). This instrument is intended for use among patients (with non-life threatening acuity) presenting to emergency care settings to indicate when referral to an allied member of the multidisciplinary team is warranted. Method This three stage instrument development and validation study included: a Delphi panel process to determine key criteria to guide instrument development and identify potential items to be carried forward for testing (stage 1); a prospective cohort of consecutive admissions (n=153) to investigate item sensitivity and specificity and retain only the most suitable items (stage 2); then final consultation with the Delphi panel to ensure the final instrument was clinically amenable (stage 3). Results 23 potential items were identified following stage 1. At the completion of item sensitivity and specificity analysis and in consultation with the Delphi panel, seven items were retained in the instrument. Area under the receiver operating characteristic curve was 0.803 for these seven items in predicting when a referral was warranted. Final consultation with the Delphi panel members also resulted in the addition of an open ended (eighth) item to allow description of any infrequent, but important, reason for referral. Conclusions The RAPaRT has demonstrated substantial promise as an efficient clinically amenable instrument to assist multidisciplinary teams in emergency care settings. Further research to investigate the wider implementation of the RAPaRT is warranted.
Resumo:
Purpose Most barriers and enablers of sustainable projects are related to procurement. This study proposes a framework for evaluating green procurement practices throughout the lifecycle of road construction projects and demonstrates its application through an Australian case study. Design/methodology/approach The study is based on linking the phases of road construction with incentive mechanisms for proactively motivating behavioural change. A holistic view on utilised and potential incentives is attempted with a literature review and a state-of-practice review. The latter is based on interviews and 90 policy and procurement documents across five Australian states. Findings An evaluation framework with seven procurement stages is suggested to describe current state green procurement incentives throughout the delivery lifecycle of road construction projects. The Australian case study was found to provide useful data to identify gaps and strong points of the different states regarding their level of integration of sustainability and greenhouse gas emissions GHG) reduction elements in their procurement practices. This understanding was used to draw recommendations on future advancement of green procurement. Originality/value: Government entities across the globe can impact considerably the achievement of sustainability and GHG targets, by using their procurement practices and requirements to create incentives for contractors and suppliers to engage in more GHG conscious practices. The present study provides a systematic account of how green procurement practices can be underpinned using the Australian road construction industry as a case study, and distinguish between strong and weak links in the green procurement chain to draw recommendations for future initiatives.
Resumo:
The diagnostics of mechanical components operating in transient conditions is still an open issue, in both research and industrial field. Indeed, the signal processing techniques developed to analyse stationary data are not applicable or are affected by a loss of effectiveness when applied to signal acquired in transient conditions. In this paper, a suitable and original signal processing tool (named EEMED), which can be used for mechanical component diagnostics in whatever operating condition and noise level, is developed exploiting some data-adaptive techniques such as Empirical Mode Decomposition (EMD), Minimum Entropy Deconvolution (MED) and the analytical approach of the Hilbert transform. The proposed tool is able to supply diagnostic information on the basis of experimental vibrations measured in transient conditions. The tool has been originally developed in order to detect localized faults on bearings installed in high speed train traction equipments and it is more effective to detect a fault in non-stationary conditions than signal processing tools based on spectral kurtosis or envelope analysis, which represent until now the landmark for bearings diagnostics.
Resumo:
The signal processing techniques developed for the diagnostics of mechanical components operating in stationary conditions are often not applicable or are affected by a loss of effectiveness when applied to signals measured in transient conditions. In this chapter, an original signal processing tool is developed exploiting some data-adaptive techniques such as Empirical Mode Decomposition, Minimum Entropy Deconvolution and the analytical approach of the Hilbert transform. The tool has been developed to detect localized faults on bearings of traction systems of high speed trains and it is more effective to detect a fault in non-stationary conditions than signal processing tools based on envelope analysis or spectral kurtosis, which represent until now the landmark for bearings diagnostics.
Resumo:
In this paper, a demand-responsive decision support system is proposed by integrating the operations of coal shipment, coal stockpiles and coal railing within a whole system. A generic and flexible scheduling optimisation methodology is developed to identify, represent, model, solve and analyse the coal transport problem in a standard and convenient way. As a result, the integrated train-stockpile-ship timetable is created and optimised for improving overall efficiency of coal transport system. A comprehensive sensitivity analysis based on extensive computational experiments is conducted to validate the proposed methodology. The mathematical proposition and proof are concluded as technical and insightful advices for industry practice. The proposed methodology provides better decision making on how to assign rail rolling-stocks and upgrade infrastructure in order to significantly improve capacity utilisation with the best resource-effectiveness ratio. The proposed decision support system with train-stockpile-ship scheduling optimisation techniques is promising to be applied in railway or mining industry, especially as a useful quantitative decision making tool on how to use more current rolling-stocks or whether to buy additional rolling-stocks for mining transportation.
Resumo:
Collaborative infrastructure projects use hybrid formal and informal governance structures to manage transactions. Based on previous desk-top research, the authors identified the key mechanisms underlying project governance, and posited the performance implications of the governance (Chen et al. 2012). The current paper extends that qualitative research by testing the veracity of those findings using data from 320 Australian construction organisations. The results provide, for the first time, reliable and valid scales to measure governance and performance of collaborative projects, and the relationship between them. The results confirm seven of seven hypothesised governance mechanisms; 30 of 43 hypothesised underlying actions; eight of eight hypothesised key performance indicators; and the dual importance of formal and informal governance. A startling finding of the study was that the implementation intensity of informal mechanisms (non-contractual conditions) is a greater predictor of project performance variance than that of formal mechanisms (contractual conditions). Further, contractual conditions do not directly impact project performance; instead their impact is mediated by the non-contractual features of a project. Obligations established under the contract are not sufficient to optimise project performance.
Resumo:
Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.
Resumo:
In this article I outline an Australian Indigenous women's standpoint theory. I argue that an Indigenous women's standpoint generates problematics informed by our knowledges and experiences. Acknowledging that Indigenous women's individual experiences will differ due to intersecting oppressions produced under social, political, historical and material conditions that we share consciously or unconsciously. These conditions and the sets of complex relations that discursively constitute us in the everyday are also complicated by our respective cultural differences and the simultaneity of our compliance and resistance as Indigenous sovereign female subjects.