620 resultados para Continuous systems


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Diabetic foot ulcers are one of the most hospitalised diabetes complications and contribute to many leg amputations. Trained diabetic foot teams and specialists managing diabetic foot ulcers have demonstrated reductions in amputations and hospitalisation by up to 90%. Few such teams exist in Australia. Thus, access is limited for all geographical populations and may somewhat explain the high rates of hospitalisation. Aim: This pilot study aims to analyse if local clinicians managing diabetic foot complications report improved access to diabetic foot specialists and outcomes with the introduction of a telehealth store-and-forward system. Method: A store-and-forward telehealth system was implemented in six different Queensland locations between August 2009 and February 2010. Sites were offered ad hoc and/or fortnightly telehealth access to a diabetic foot speciality service. A survey was sent six months following commencement of the trial to the 14 eligible clinicians involved in the trial to gauge clinical perception of the telehealth system. Results: Eight participants returned the surveys. The majority of responding clinicians reported that the telehealth system was easy to use (100%), improved their access to diabetic foot speciality services (75%), improved upskilling of local diabetes service staff (100%), and improved patient outcomes (100%). Conclusion: This pilot study suggests that clinicians found the use of a telehealth store-and-forward system very useful in improving access to speciality services, clinical skills and patient outcomes. This study supports the recommendation that telehealth systems should be made available for diabetic foot ulcer management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper studies time integration methods for large stiff systems of ordinary differential equations (ODEs) of the form u'(t) = g(u(t)). For such problems, implicit methods generally outperform explicit methods, since the time step is usually less restricted by stability constraints. Recently, however, explicit so-called exponential integrators have become popular for stiff problems due to their favourable stability properties. These methods use matrix-vector products involving exponential-like functions of the Jacobian matrix, which can be approximated using Krylov subspace methods that require only matrix-vector products with the Jacobian. In this paper, we implement exponential integrators of second, third and fourth order and demonstrate that they are competitive with well-established approaches based on the backward differentiation formulas and a preconditioned Newton-Krylov solution strategy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Australian Securities Exchange (ASX) listing rule 3.1 requires listed companies to immediately disclose price sensitive information to the market via the ASX’s Company Announcements Platform (CAP) prior to release through other disclosure channels. Since 1999, to improve the communication process, the ASX has permitted third-party mediation in the disclosure process that leads to the release of an Open Briefing (OB) through CAP. An OB is an interview between senior executives of the firm and an Open Briefing analyst employed by Orient Capital Pty Ltd (broaching topics such as current profit and outlook). Motivated by an absence of research on factors that influence firms to use OBs as a discretionary disclosure channel, this study examines (1) Why do firms choose to release information to the market via OBs?, (2) What are the firm characteristics that explain the discretionary use of OBs as a disclosure channel?, and (3) What are the disclosure attributes that influence firms’ decisions to regularly use OBs as a disclosure channel? Based on agency and information economics theories, a theoretical framework is developed to address research questions. This theoretical framework comprises disclosure environments such as firm characteristics and external factors, disclosure attributes and disclosure consequences. In order to address the first research question, the study investigates (i) the purpose of using OBs, (2) whether firms use OBs to provide information relating to previous public announcements, and (3) whether firms use OBs to provide routine or non-routine disclosures. In relation to the second and third research questions, hypotheses are developed to test factors expected to explain the discretionary use of OBs and firms’ decisions to regularly use OBs, and to explore the factors influencing the nature of OB disclosure. Content analysis and logistic regression models are used to investigate the research questions and test the hypotheses. Data are drawn from a hand-collected population of 1863 OB announcements issued by 239 listed firms between 2000 and 2010. The results show that types of information disclosed via an OB announcement are principally on matters relating to corporate strategies and performance and outlook. Most OB announcements are linked with a previous related announcement, with the lag between announcements significantly longer for loss-making firms than profitmaking firms. The main results show that firms which tend to be larger, have an analyst following, and have higher growth opportunities, are more likely to release OBs. Further, older firms and firms that release OB announcements containing good news, historical information and less complex information tend to be regular OB users. Lastly, firms more likely to disclose strategic information via OBs tend to operate in industries facing greater uncertainty, do not have analysts following, and have higher growth opportunities are less likely to disclose good news, historical information and complex information via OBs. This study is expected to contribute to disclosure literature in terms of disclosure attributes and firm characteristics that influence behaviour in this unique (OB) disclosure channel. With regard to practical significance, regulators can gain an understanding of how OBs are disclosed which can assist them in monitoring the use of OBs and improving the effectiveness of communications with stakeholders. In addition, investors can have a better comprehension of information contained in OB announcements, which may in turn better facilitate their investment decisions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building prefabrication is known as Industrialised Building Systems (IBS) in Malaysia. This construction method possesses unique characteristics that are central to sustainable construction. For example, offsite construction enables efficient management of construction wastage by identifying major causes of waste arising during both the design and construction stages. These causes may then be eliminated by the improvement process in IBS component's manufacturing. However, current decisions on using IBS are typically financial driven and hinder the wider ranged adoption. In addition, current IBS misconceptions and the failure of rating schemes in evaluating the sustainability of IBS affect its implementation. A new approach is required to provide better understanding on the sustainability potential of IBS among stakeholders. Such approach should also help project the outcomes of each levels of decision-making to respond to social, economy and environmental challenges. This paper presents interim findings of research aimed at developing a framework for sustainable IBS development and suggests a more holistic approach to achieve sustainability. A framework of embedding sustainability factors is considered in three main phases of IBS construction; 1) Pre-construction, 2) Construction and 3) Post-construction phase. SWOT analysis was used to evaluate the strengths, weaknesses, opportunities and threats involved in the IBS implementations. The action plans are formulated from the analysis of sustainable objectives. This approach will show where and how sustainability should be integrated to improve IBS construction. A mix of quantitative and qualitative methodology was used in this research to explore the potential of IBS in integrating sustainability. The tools used in the study are questionnaires and semi-structured interviews. Outcomes from these tools lead to the identification of viable approaches involving 18 critical factors to improve sustainability in IBS constructions. Finally, guidelines for decision-making are being developed to provide a useful source of information and support to mutual benefit of the stakeholders in integrating sustainability issues and concepts into IBS applications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.