650 resultados para road projects
Resumo:
The thesis provides a framework for potential implementation of the design-build (DB) project delivery system in road infrastructure projects in Indonesia. This framework proposed a structure of the hierarchy of factors promoting the potential implementation of the DB project delivery system and introduced ways to implement the DB project delivery system through level of hierarchical factors. These findings not only give benefit to the academic knowledge but also to the public officials in guiding them with regard to the priority of promoting factors in the process to implement the DB system.
Resumo:
Purpose Most barriers and enablers of sustainable projects are related to procurement. This study proposes a framework for evaluating green procurement practices throughout the lifecycle of road construction projects and demonstrates its application through an Australian case study. Design/methodology/approach The study is based on linking the phases of road construction with incentive mechanisms for proactively motivating behavioural change. A holistic view on utilised and potential incentives is attempted with a literature review and a state-of-practice review. The latter is based on interviews and 90 policy and procurement documents across five Australian states. Findings An evaluation framework with seven procurement stages is suggested to describe current state green procurement incentives throughout the delivery lifecycle of road construction projects. The Australian case study was found to provide useful data to identify gaps and strong points of the different states regarding their level of integration of sustainability and greenhouse gas emissions GHG) reduction elements in their procurement practices. This understanding was used to draw recommendations on future advancement of green procurement. Originality/value: Government entities across the globe can impact considerably the achievement of sustainability and GHG targets, by using their procurement practices and requirements to create incentives for contractors and suppliers to engage in more GHG conscious practices. The present study provides a systematic account of how green procurement practices can be underpinned using the Australian road construction industry as a case study, and distinguish between strong and weak links in the green procurement chain to draw recommendations for future initiatives.
Resumo:
Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.
Resumo:
A procurement decision-making model is developed based on a novel integration of leading-edge microeconomic theory and empirically tested in major road and health projects. The model provides a more reliable approach to identifying projects suited to Public-Private-Partnerships (PPPs) and it is expected that the model will enable government to deliver improved value-for-money from their portfolio of PPP projects.
Resumo:
Based on Dunning's dominant international business theory and the unique characteristics of construction, a novel framework is developed and tested to explain multinational contracting into Australia. Beyond contributions to theory, Australian governments now have clear evidence upon which to develop more effective procurement reform towards increasing the attractiveness of public sector major infrastructure projects and competition in this sector.
Resumo:
Existing research and best practice were utilized to develop the Project Management, Stakeholder Engagement and Change Facilitation (PSC) approach to road safety infrastructure projects. Two case studies involving Queensland Transport and Main Roads demonstrated that use of the PSC has potential to create synergies for projects undertaken by multi-disciplinary road safety groups, and to complement Safe System projects and philosophy. The case studies were the North West Road Safety Alliance project, and the implementation of Road Safety Audit policy, and utilised a mix of qualitative and quantitative methods including interviews and surveys.
Resumo:
The Haddon Matrix was developed in the 1960s road safety arena, and has since been used in many public health settings. The literature and two specific case studies are reviewed to describe the background to the Haddon Matrix, identify how it has been critiqued and developed over time and practical applications in the work-related road safety context. Haddon’s original focus on the road, vehicle and driver has been extended and applied to include organisational safety culture, journey management and wider issues in society that affect occupational drivers and the communities in which they work. The paper shows that the Haddon Matrix has been applied in many projects and contexts. Practical work-related road safety applications include providing a comprehensive systems-based safety management framework to inform strategy. It has also been used to structure the review or gap analysis of current programs and processes, identify and develop prevention measures and as a tool for effective post-event investigations.
Resumo:
Flexible design practices broadly permit that design values outside the normal range can be accepted as appropriate for a site-specific context providing that the risk is evaluated and is tolerable. Execution of flexible design demands some evaluation of risk. In restoration projects, it may be the case that an immovable object exists within the zone of the expected deflection of a road safety barrier system. Only by design exception can the situation be determined to be acceptable. However, the notion of using flexible design for road safety barrier design is not well developed. The existence of a diminishing return relationship between safety benefits and provision of increased clear zone has been established previously. This paper proposes that a similar rationale might reasonably apply for the deflection zone behind road safety barriers and describes how the risk associated with road safety barriers might be quantified in order that defensible road safety barrier design can exist below the lower bounds of normal design standards. As such, the methodology described in this paper may provide some basis to enable road authorities to make informed design decisions, particularly for restoration, or “Brownfield”, projects.
Resumo:
Formal incentives systems aim to encourage improved performance by offering a reward for the achievement of project-specific goals. Despite argued benefits of incentive systems on project delivery outcomes, there remains debate over how incentive systems can be designed to encourage the formation of strong project relationships within a complex social system such as an infrastructure project. This challenge is compounded by the increasing emphasis in construction management research on the important mediating influence of technical and organisational context on project performance. In light of this challenge, the research presented in this paper focuses on the design of incentive systems in four infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on a motivational theory frame, a cross case analysis is conducted to examine differences and similarities across social and cultural drivers impacting on the effectiveness of the incentive systems in light of infrastructure project context. Despite significant differences in case project characteristics, results indicate the projects’ experience similar social drivers impacting on incentive effectiveness. Significant value across the projects was placed on: varied performance goals and multiple opportunities to across the project team to pursue incentive rewards; fair risk allocation across contract parties; value-driven tender selection; improved design-build integration; and promotion of future work opportunities. However, differences across the contexts were identified. Results suggest future work opportunities were a more powerful social driver in upholding reputation and establishing strong project relationships in the Australian context. On the other hand, the relationship initiatives in the Dutch context seemed to be more broadly embraced resulting in a greater willingness to collaboratively manage project risk. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the social and cultural influences on incentive effectiveness across different geographical and contextual boundaries in future research.
Resumo:
Road crashes and injuries have become a growing issue worldwide. In 2011, more than 75,000 people died in road crashes in the ten member countries of the Association of South East Asian Nations (ASEAN) and many times this number sustained long term injuries. In 2014, the Asian Development Bank (ADB), funded by the Japan Fund for Poverty Reduction, commenced a package of actions to improve road safety in ASEAN. In 2015, as part of the technical assistance for this project, a Road Safety Advisor was appointed for Cambodia for four months. The assignment produced several primary outputs, which included the organization of national training on traffic law enforcement and road safety management, the conduct of a training needs survey and cost analysis study, and the development of a proposal for strengthening speed management. It is important to note that unlike other ADB technical assistance projects, this assignment adopted a capacity building approach, which promoted and encouraged the local road safety team in the government to step up and take action. The research capacity building approach adopted in this project highlighted the feasibility of increasing participation from existing stakeholders, especially the government in identifying existing human resources, building the capacity of relevant government officials and supporting them to take the ownership of the project. It is hoped that similar outcomes will occur in the other ASEAN countries.