219 resultados para rail tunnel
Resumo:
Condition monitoring on rails and train wheels is vitally important to the railway asset management and the rail-wheel interactions provide the crucial information of the health state of both rails and wheels. Continuous and remote monitoring is always a preference for operators. With a new generation of strain sensing devices in Fibre Bragg Grating (FBG) sensors, this study explores the possibility of continuous monitoring of the health state of the rails; and investigates the required signal processing techniques and their limitations.
Resumo:
Fibre Bragg Grating (FBG) sensors have been installed along an existing line for the purposes of train detection and weight measurement. The results show fair accuracy and high resolution on the vertical force acted on track when the train wheels are rolling upon. While the sensors are already in place and data is available, further applications beyond train detection are explored. This study presents the analysis on the unique signatures from the data collected to characterise wheel-rail interaction for rail defect detection. Focus of this first stage of work is placed on the repeatability of signals from the same wheel-rail interactions while the rail is in healthy state. Discussions on the preliminary results and hence the feasibility of this condition monitoring application, as well as technical issues to be addressed in practice, are given.
Resumo:
Dust emissions from large-scale, tunnel-ventilated poultry sheds could have negative health and environmental impacts. Despite this fact, the literature concerning dust emissions from tunnel-ventilated poultry sheds in Australia and overseas is relatively scarce. Dust measurements were conducted during two consecutive production cycles at a single broiler shed on a poultry farm near Ipswich, Queensland. Fresh litter was employed during the first cycle and partially reused litter was employed during the second cycle. This provided an opportunity to study the effect that partial litter reuse has on dust emissions. Dust levels were characterised by the number concentration of suspended particles having diameter between 0.5–20 μm and by the mass concentration of dust particles below 10 μm diameter (PM10) and 2.5 μm diameter (PM2.5). In addition, we measured the number size distributions of dust particles. The average concentration and emission rate of dust was higher when partially reused litter was used in the shed than when fresh litter was used. In addition we found that dust particles emitted from the shed with partially reused litter were finer than the particles emitted with fresh litter. Although the change in litter properties is certainly contributing to this observed variability, other factors such as ventilation rate and litter moisture content are also likely to be involved.
Resumo:
Due to an ever increasing demand for more frequent and higher volume of train service, the physical conditions of tracks in modem railways are deteriorating more quickly when compared to tracks built decades ago. There are incidences in both the UK and Hong Kong indicating there are needs for a more stringent checks on the rail conditions using suitable and effective non-invasive and nondestructive condition monitoring system.
Resumo:
A Flat Bed Rail Wagon (FBRW) has been proposed as an alternative solution for replacing bridges on low traffic volume roads. The subject matter for this paper is to investigate the impediment to load transfer from cross girders to main girder, through visually identifiable structural flaws. Namely, the effect of having large openings at close proximity to the connection of the main girder to the cross girder of a FBRW was examined. It was clear that openings locally reduce the section modulus of the secondary members; however it was unclear how these reductions would affect the load transfer to the main girder. The results are presented through modeling grillage action for which the loads applied onto the FBRW were distributed through cross girders to the main girder.
Resumo:
Despite the global financial downturn, the Australian rail industry is in a period of expansion. Reports indicate that the industry is not attracting sufficient entry level and mid-career engineers and skilled technicians from within the Australian labour market and is facing widespread retirements from an ageing workforce. This paper reports on a completed qualitative study that explores the perceptions of engineering students, their lecturers, careers advisors and recruitment consultants regarding rail as a brand and of careers in the rail industry. Findings are presented about career knowledge, job characteristic preferences, branding and image and indicate that rail as a brand has a dated image, that young people and their influencers have little knowledge of rail careers and that rail could better focus its image and recruitment strategies. Conclusions include suggestions for more effective attraction and image strategies for the industry and for further research.
Resumo:
A finite element numerical simulation is carried out to examine stress distributions on railhead in the cicinity of the endpost of an insulated rail joint. The contact patch and pressure distribution are considered using modified Hertzian simulation. A combined elasto-plastic material modelling available in Abaqus is employed in the simulation. A dynamic load factor of 1.21 is considered in modelling for the wheel load based on a previous study as part of this on going research. Shakedown theorem is employed in this study. A peak pressure load which is above the shakedown limit is determined as input load. As a result, a progressive damage in the railhead has been captured as depicted in the equivalent plastic strain plot.
Resumo:
This paper discusses major obstacles for the adoption of low cost level crossing warning devices (LCLCWDs) in Australia and reviews those trialed in Australia and internationally. The argument for the use of LCLCWDs is that for a given investment, more passive level crossings can be treated, therefore increasing safety benefits across the rail network. This approach, in theory, reduces risk across the network by utilizing a combination of low-cost and conventional level crossing interventions, similar to what is done in the road environment. This paper concludes that in order to determine if this approach can produce better safety outcomes than the current approach, involving the incremental upgrade of level crossings with conventional interventions, it is necessary to perform rigorous risk assessments and cost-benefit analyses of LCLCWDs. Further research is also needed to determine how best to differentiate less reliable LCCLWDs from conventional warning devices through the use of different warning signs and signals. This paper presents a strategy for progressing research and development of LCLCWDs and details how the Cooperative Research Centre (CRC) for Rail Innovation is fulfilling this strategy through the current and future affordable level crossing projects.
Resumo:
This paper presents a study on estimating the latent demand for rail transit in Australian context. Based on travel mode-choice modelling, a two-stage analysis approach is proposed, namely market population identification and mode share estimation. A case study is conducted on Midland-Fremantle rail transit corridor in Perth, Western Australia. The required data mainly include journey-to-work trip data from Australian Bureau of Statistics Census 2006 and work-purpose mode-choice model in Perth Strategic Transport Evaluation Model. The market profile is analysed, such as catchment areas, market population, mode shares, mode specific trip distributions and average trip distances. A numerical simulation is performed to test the sensitivity of the transit ridership to the change of fuel price. A corridor-level transit demand function of fuel price is thus obtained and its characteristics of elasticity are discussed. This study explores a viable approach to developing a decision-support tool for the assessment of short-term impacts of policy and operational adjustments on corridor-level demand for rail transit.
Resumo:
This paper provides an overview of the A$11 billion English Channel Tunnel Project. The author's experiences are based on his recent work experience with a British Consulting Engineer involved with this unique project. After providing an historical background, the project is considered in terms of the project structure and funding, the cross Channel transport market and the planned integrated transport system in terms of both design and construction.
Elasto-plastic stress analysis of an insulated rail joint (IRJ) with a loading below shakedown limit
Resumo:
A finite element numerical simulation is carried out to examine stress distributions on railhead in the vicinity of the endpost of a insulated rail joint. The contact patch and pressure distribution are considered using modified Hertzian formulation. A combined elasto-plastic material modelling available in Abaqus is employed in the simulation. A dynamic load factor of 1.21 is considered in modelling for the wheel load based on a previous study as part of this on going research. Shakedown theorem is employed in this study. A peak pressure load which is above the shakedown limit is determined as input load. As a result, a progressive damage in the railhead has been captured as depicted in the equivalent plastic strain plot.
Resumo:
Verification testing of two model technologies in pilot scale to remove arsenic and antimony based on reverse osmosis and chemical coagulation/filtration systems was conducted in Spiro Tunnel Water Filtration Plant located in Park City, Utah, US. The source water was groundwater in abandoned silver mine, naturally contaminated by 60-80 ppb of arsenic and antimony below 10 ppb. This water represents one of the sources of drinking water for Park City and constitutes about 44% of the water supply. The failure to remove antimony efficiently by coagulation/filtration (only 4.4% removal rate) under design conditions is discussed in terms of the chemistry differences between Sb (III, V) and As (III, V). Removal of Sb(V) at pH > 7, using coagulation/filtration technology, requires much higher (50 to 80 times) concentration of iron (III) than As. The stronger adsorption of arsenate over a wider pH range can be explained by the fact that arsenic acid is tri-protic, whereas antimonic acid is monoprotic. This difference in properties of As(V) and Sb(V) makes antimony (V) more difficult to be efficiently removed in low concentrations of iron hydroxide and alkaline pH waters, especially in concentration of Sb < 10 ppb.