196 resultados para physiologic stages
Resumo:
Objectives The objectives of this project were two-fold: • Assess the ease with which current architectural CAD systems supported the use ofparametric descriptions in defining building shape, engineering system performance and cost at the early stages of building design; • Assess the feasibility of implementing a software decision support system that allowed designers to trade-off the characteristics and configuration of various engineering systems to move towards a “global optimum” rather than considering each system in isolation and expecting humans to weigh up all of the costs and benefits. The first stage of the project consisted of using four different CAD systems to define building shells (envelopes) with different usages. These models were then exported into a shared database using the IFC information exchange specifications. The second stage involved the implementation of small computer programs that were able to estimate relevant system parameters based on performance requirements and the constraints imposed by the other systems. These are presented in a unified user interface that extracts the appropriate building shape parameters from the shared database Note that the term parametric in this context refers to the relationships among and between all elements of the building model - not just geometric associations - which will enable the desired coordination.
Resumo:
Brisbane Water (BW), a commercialised business arm of Brisbane City Council (BCC) entered into an alliance with a number of organisations from the private sector in order to design, construct, commission and undertake upgrades to three existing wastewater treatment plants located at Sandgate, Oxley Creek, and Wacol in Brisbane. The alliance project is called the Brisbane Water Environmental Alliance (BWEA). This report details the efforts of a team of researchers from the School of Management at Queensland University of Technology to investigate this alliance. This is the second report on this project, and is called Stage 2 of the research. At the time that Stage 2 of the research project was conducted, the BWEA project was nearing completion with a further 8 months remaining before project completion. The aim of this report is to explore individuals’ perceptions of the effectiveness and functioning of the BWEA project in the latter stages of the project. The second aim of this report is to analyse the longitudinal findings of this research project by integrating the findings from Stage 1 and Stage 2 of the project. This long-term analysis of the functioning and effectiveness of the alliance is important because at the current time, researchers have little knowledge of the group developmental processes that occur in large-scale alliances over time. Stage 2 of this research project has a number of aims including assessing performance of the BWEA project from the point of view of a range of stakeholders including the alliance board and alliance management team, alliance staff, and key stakeholders from the client organisation (Brisbane Water). Data were collected using semi-structured interviews with 18 individuals including two board members, one external facilitator, and four staff members from the client organisation. Analysis involved coding the interview transcripts in terms of the major issues that were reported by interviewees.
Resumo:
This study contributes to the growth of design knowledge in China, where vehicle design for the local, older user is in its initial developmental stages. Therefore, this research has explored the travel needs of older Chinese vehicle users in order to assist designers to better understand users’ current and future needs. A triangulation method consisting of interviews, logbook and co-discovery was used to collect multiple forms of data and so explore the research question. Grounded theory has been employed to analyze the research data. This study found that users’ needs are reflected through various ‘meanings’ that they attach to vehicles – meanings that give a tangible expression to their experiences. This study identified six older-user need categories: (i) safety, (ii) utility, (iii) comfort, (iv) identity, (v) emotion and (vi) spirituality. The interrelationships among these six categories are seen as an interactive structure, rather than as a linear or hierarchical arrangement. Chinese cultural values, which are generated from particular local context and users’ social practice, will play a dynamic role in linking and shaping the travel needs of older vehicle users in the future. Moreover, this study structures the older-user needs model into three levels of meaning, to give guidance to vehicle design direction: (i) the practical meaning level, (ii) the social meaning level and (ii) the cultural meaning level. This study suggests that a more comprehensive explanation exists if designers can identify the vehicle’s meaning and property associated with the fulfilled older users’ needs. However, these needs will vary, and must be related to particular technological, social, and cultural contexts. The significance of this study lies in its contributions to the body of knowledge in three areas: research methodology, theory and design. These theoretical contributions provide a series of methodological tools, models and approaches from a vehicle design perspective. These include a conditional/consequential matrix, a travel needs identification model, an older users’ travel-related needs framework, a user information structure model, and an Older-User-Need-Based vehicle design approach. These models suggest a basic framework for the new design process which might assist in the design of new vehicles to fulfil the needs of future, aging Chinese generations. The models have the potential to be transferred to other design domains and different cultural contexts.
Resumo:
The purpose of this document is to introduce non-specialists to the discipline and practice of public policy, particularly in relation to the construction sector in Australia. In order to do this, a brief overview of Australia’s government structure, and some of the main approaches to public policy analysis are outlined. Reference to construction related examples are provided to ensure issues discussed are relevant and understandable to construction professionals. Government is a significant player in the construction industry, and has multiple roles: adjudicator, regulator, constructor, purchaser and client of construction projects. Moreover there are many spheres of government that are typically engaged in construction projects at multiple stages. The machinery of government can be difficult to understand, even for long term public servants. Demystifying the processes within government can help to improve communication and therefore performance in the industry. A better understanding of how policy-making and government policies affect the construction industry will enhance communication and assist construction professionals and academics to understand and work with government. Additionally the document will provide an opportunity to demonstrate the relevance of policy analysis to inquiries of construction policies and regulation.
Resumo:
Principal Topic The study of the origin and characteristics of venture ideas - or ''opportunities'' as they are often called - and their contextual fit are key research goals in entrepreneurship (Davidsson, 2004). We define venture idea as ''the core ideas of an entrepreneur about what to sell, how to sell, whom to sell and how an entrepreneur acquire or produce the product or service which he/she sells'' for the purpose of this study. When realized the venture idea becomes a ''business model''. Even though venture ideas are central to entrepreneurship yet its characteristics and their effect to the entrepreneurial process is mysterious. According to Schumpeter (1934) entrepreneurs could creatively destruct the existing market condition by introducing new product/service, new production methods, new markets, and new sources of supply and reorganization of industries. The introduction, development and use of new ideas are generally called as ''innovation'' (Damanpour & Wischnevsky, 2006) and ''newness'' is a property of innovation and is a relative term which means that the degree of unfamiliarity of venture idea either to a firm or to a market. However Schumpeter's (1934) discusses five different types of newness, indicating that type of newness is an important issue. More recently, Shane and Venkataraman (2000) called for research taking into consideration not only the variation of characteristics of individuals but also heterogeneity of venture ideas, Empirically, Samuelson (2001, 2004) investigated process differences between innovative venture ideas and imitative venture ideas. However, he used only a crude dichotomy regarding the venture idea newness. According to Davidsson, (2004) as entrepreneurs could introduce new economic activities ranging from pure imitation to being new to the entire world market, highlighting that newness is a matter of degree. Dahlqvist (2007) examined the venture idea newness and made and attempt at more refined assessment of the degree and type of newness of venture idea. Building on these predecessors our study refines the assessment of venture idea newness by measuring the degree of venture idea newness (new to the world, new to the market, substantially improved while not entirely new, and imitation) for four different types of newness (product/service, method of production, method of promotion, and customer/target market). We then related type and degree of newness to the pace of progress in nascent venturing process. We hypothesize that newness will slow down the business creation process. Shane & Venkataraman (2000) introduced entrepreneurship as the nexus of opportunities and individuals. In line with this some scholars has investigated the relationship between individuals and opportunities. For example Shane (2000) investigates the relatedness between individuals' prior knowledge and identification of opportunities. Shepherd & DeTinne (2005) identified that there is a positive relationship between potential financial reward and the identification of innovative venture ideas. Sarasvathy's 'Effectuation Theory'' assumes high degree of relatedness with founders' skills, knowledge and resources in the selection of venture ideas. However entrepreneurship literature is scant with analyses of how this relatedness affects to the progress of venturing process. Therefore, we assess the venture ideas' degree of relatedness to prior knowledge and resources, and relate these, too, to the pace of progress in nascent venturing process. We hypothesize that relatedness will increase the speed of business creation. Methodology For this study we will compare early findings from data collected through the Comprehensive Australian Study of Entrepreneurial Emergence (CAUSEE). CAUSEE is a longitudinal study whose primary objective is to uncover the factors that initiate, hinder and facilitate the process of emergence and development of new firms. Data were collected from a representative sample of some 30,000 households in Australia using random digit dialing (RDD) telephone survey interviews. Through the first round of data collection identified 600 entrepreneurs who are currently involved in the business start-up process. The unit of the analysis is the emerging venture, with the respondent acting as its spokesperson. The study methodology allows researchers to identify ventures in early stages of creation and to longitudinally follow their progression through data collection periods over time. Our measures of newness build on previous work by Dahlqvist (2007). Our adapted version was developed over two pre-tests with about 80 participants in each. The measures of relatedness were developed through the two rounds of pre-testing. The pace of progress in the venture creation process is assessed with the help of time-stamped gestation activities; a technique developed in the Panel Study of Entrepreneurial Dynamics (PSED). Results and Implications We hypothesized that venture idea newness slows down the venturing process whereas relatedness facilitates the venturing process. Results of 600 nascent entrepreneurs in Australia indicated that there is marginal support for the hypothesis that relatedness assists the gestation progress. Newness is significant but is the opposite sign to the hypothesized. The results give number of implications for researchers, business founders, consultants and policy makers in terms of better knowledge of the venture creation process.
Resumo:
As ‘The Architect’s Handbook of Professional Practice’ (cited by Riskus (2007) suggests, Building Information Modelling, or BIM, is “the use of virtual building information models to develop building design solutions, design documentation, and to analyse construction processes”. We would suggest such a definition, while useful, should be extended to include the operational phases of built assets (such as maintenance and decommissioning), and also be applied to the whole area of infrastructure. As a set of technologies, BIM holds promise to deliver benefits for the property, construction, and infrastructure management industries – particularly improved efficiencies and effectiveness through enhanced collaboration at all stages of the construction cycle. There are several important qualifiers, barriers, enablers, and some disadvantages with this suite of technologies. This report outlines the costs and benefits enablers and barriers associated with BIM, and makes suggestions about how these issues may be addressed.
Resumo:
There are many studies that reveal the nature of design thinking and the nature of conceptual design as distinct from detailed or embodiment design. The results can assist in our understanding of how the process of design can be supported and how new technologies can be introduced into the workplace. Existing studies provide limited information about the nature of collaborative design as it takes place on the ground and in the actual working context. How to provide appropriate and effective of support for collaborative design information sharing across companies, countries and heterogeneous computer systems is a key issue. As data are passed between designers and the computer systems they employ, many exchanges are made. These exchanges may be used to establish measures of the benefits that new support systems can bring. Collaboration support tools represent a fast growing section of the commercial software market place and a reasonable range of products are available. Many of them offer significant application to design for the support of distributed meetings by the provision of video and audio communications and the sharing of information, including collaborative sketching. The tools that specifically support 3D models and other very design specific features are less common and many of those are in prototype stages of development. A key question is to find viable ways of combining design information visualisation support with the collaboration support technologies that can be seen today. When collaborating, different views will need to be accessible at different times to all the collaborators. The architects may want to explain some ideas on their model, the structural engineers on their model and so on. However, there are issues of ownership when the structural engineer wants to manipulate the architect’s model and vice versa. The modes of working, synchronous or asynchronous may have a bearing as in a synchronous session there is control of what is happening.
Resumo:
In architectural design and the construction industry, there is insufficient evidence about the way designers collaborate in their normal working environments using both traditional and digital media. It is this gap in empirical evidence that the CRC project, “Team Collaboration in High Bandwidth Virtual Environments” addresses. The project is primarily, but not exclusively, concerned with the conceptual stages of design carried out by professional designers working in different offices. The aim is to increase opportunities for communication and interaction between people in geographically distant locations in order to improve the quality of collaboration. In order to understand the practical implications of introducing new digital tools on working practices, research into how designers work collaboratively using both traditional and digital media is being undertaken. This will involve a series of empirical studies in the work places of the industry partners in the project. The studies of collaboration processes will provide empirical results that will lead to more effective use of virtual environments in design and construction processes. The report describes the research approach, the industry study, the methods for data collection and analysis and the foundation research methodologies. A distinctive aspect is that the research has been devised to enable field studies to be undertaken in a live industrial environment where the participant designers carry out real projects alongside their colleagues and in familiar locations. There are two basic research objectives: one is to obtain evidence about design practice that will inform the architecture and construction industries about the impact and potential benefit of using digital collaboration technologies; the second is to add to long term research knowledge of human cognitive and behavioural processes based on real world data. In order to achieve this, the research methods must be able to acquire a rich and heterogeneous set of data from design activities as they are carried out in the normal working environment. This places different demands upon the data collection and analysis methods to those of laboratory studies where controlled conditions are required. In order to address this, the research approach that has been adopted is ethnographic in nature and case study-based. The plan is to carry out a series of indepth studies in order to provide baseline results for future research across a wider community of user groups. An important objective has been to develop a methodology that will produce valid, significant and transferable results. The research will contribute to knowledge about how architectural design and the construction industry may benefit from the introduction of leading edge collaboration technologies. The outcomes will provide a sound foundation for the production of guidelines for the assessment of high bandwidth tools and their future deployment. The knowledge will form the basis for the specification of future collaboration products and collaboration processes. This project directly addresses the industry-identified focus on cultural change, image, e-project management, and innovative methods.
Resumo:
Recent developments in networked three dimensional (3D) virtual worlds, and the proliferation of high bandwidth communications technology, have the potential to dramatically improve collaboration in the construction industry. This research project focuses on the early stages of a construction project in which the models for the project are developed and revised. The project investigates three aspects of collaboration in virtual environments: 1. The processes that enable effective collaboration using high bandwidth information communication technology (ICT); 2. The models that allow for multiple disciplines to share their views in a synchronous virtual environment; 3. The generic skills used by individuals and teams when engaging with high bandwidth information communication technology. The third aspect of the project, listed above, led by the University of Newcastle, explores the domain of People and the extent to which they contribute to the effectiveness of virtual teams. This report relates, primarily, to this aspect.
Resumo:
Recent developments in networked three dimensional (3D) virtual worlds and the proliferation of high bandwidth communications technology have the potential to dramatically improve collaboration in the construction industry. This research project focuses on the early stages of a design/construction project in which models for a project are developed and revised. We have investigated three aspects of collaboration in virtual environments: 1. The processes that enable effective collaboration using high bandwidth information communication technology (ICT); 2. The models that allow for multiple disciplines to share their views in a synchronous virtual environment; 3. The generic skills used by individuals and teams when engaging with high bandwidth information communication technology.
Resumo:
Construction is an information intensive industry in which the accuracy and timeliness of information is paramount. It observed that the main communication issue in construction is to provide a method to exchange data between the site operation, the site office and the head office. The information needs under consideration are time critical to assist in maintaining or improving the efficiency at the jobsite. Without appropriate computing support this may increase the difficulty of problem solving. Many researchers focus their research on the usage of mobile computing devices in the construction industry and they believe that mobile computers have the potential to solve some construction problems that leads to reduce overall productivity. However, to date very limited observation has been conducted in terms of the deployment of mobile computers for construction workers on-site. By providing field workers with accurate, reliable and timely information at the location where it is needed, it will support the effectiveness and efficiency at the job site. Bringing a new technology into construction industry is not only need a better understanding of the application, but also need a proper preparation of the allocation of the resources such as people, and investment. With this in mind, an accurate analysis is needed to provide clearly idea of the overall costs and benefits of the new technology. A cost benefit analysis is a method of evaluating the relative merits of a proposed investment project in order to achieve efficient allocation of resources. It is a way of identifying, portraying and assessing the factors which need to be considered in making rational economic choices. In principle, a cost benefit analysis is a rigorous, quantitative and data-intensive procedure, which requires identification all potential effects, categorisation of these effects as costs and benefits, quantitative estimation of the extent of each cost and benefit associated with an action, translation of these into a common metric such as dollars, discounting of future costs and benefits into the terms of a given year, and summary of all cost and benefit to see which is greater. Even though many cost benefit analysis methodologies are available for a general assessment, there is no specific methodology can be applied for analysing the cost and benefit of the application of mobile computing devices in the construction site. Hence, the proposed methodology in this document is predominantly adapted from Baker et al. (2000), Department of Finance (1995), and Office of Investment Management (2005). The methodology is divided into four main stages and then detailed into ten steps. The methodology is provided for the CRC CI 2002-057-C Project: Enabling Team Collaboration with Pervasive and Mobile Computing and can be seen in detail in Section 3.
Resumo:
Technology is continually changing, and evolving, throughout the entire construction industry; and particularly in the design process. One of the principal manifestations of this is a move away from team working in a shared work space to team working in a virtual space, using increasingly sophisticated electronic media. Due to the significant operating differences when working in shared and virtual spaces adjustments to generic skills utilised by members is a necessity when moving between the two conditions. This paper reports an aspect of a CRC-CI research project based on research of ‘generic skills’ used by individuals and teams when engaging with high bandwidth information and communication technologies (ICT). It aligns with the project’s other two aspects of collaboration in virtual environments: ‘processes’ and ‘models’. The entire project focuses on the early stages of a project (i.e. design) in which models for the project are being developed and revised. The paper summarises the first stage of the research project which reviews literature to identify factors of virtual teaming which may affect team member skills. It concludes that design team participants require ‘appropriate skills’ to function efficiently and effectively, and that the introduction of high band-width technologies reinforces the need for skills mapping and measurement.
Resumo:
In today’s global design world, architectural and other related design firms design across time zones and geographically distant locations. High bandwidth virtual environments have the potential to make a major impact on these global design teams. However, there is insufficient evidence about the way designers collaborate in their normal working environments using traditional and/or digital media. This paper presents a method to study the impact of communication and information technologies on collaborative design practice by comparing design tasks done in a normal working environment with design tasks done in a virtual environment. Before introducing high bandwidth collaboration technology to the work environment, a baseline study is conducted to observe and analyze the existing collaborative process. Designers currently rely on phone, fax, email, and image files for communication and collaboration. Describing the current context is important for comparison with the following phases. We developed the coding scheme that will be used in analyzing three stages of the collaborative design activity. The results will establish the basis for measures of collaborative design activity when a new technology is introduced later to the same work environment – for example, designers using electronic whiteboards, 3D virtual worlds, webcams, and internet phone. The results of this work will form the basis of guidelines for the introduction of technology into global design offices
Resumo:
In Australia, an average 49 building and construction workers have been killed at work each year since 1997-98. Building/construction workers are more than twice as likely to be killed at work, than the average worker in all Australian industries. The ‘Safer Construction’ project, funded by the CRC-Construction Innovation and led by a task force comprising representatives of construction clients, designers and constructors, developed a Guide to Best Practice for Safer Construction. The Guide, which was informed by research undertaken at RMIT University, Queensland University of Technology and Curtin University, establishes broad principles for the improvement of safety in the industry and provides a ‘roadmap’ for improvement based upon lifecycle stages of a building/construction project. Within each project stage, best practices for the management of safety are identified. Each best practice is defined in terms of the recommended action, its key benefits, desirable outcomes, performance measures and leadership. ‘Safer Construction’ practices are identified from the planning to commissioning stages of a project. The ‘Safer Construction’ project represents the first time that key stakeholder groups in the Australian building/construction industry have worked together to articulate best practice and establish an appropriate basis for allocating (and sharing) responsibility for project safety performance.
Resumo:
Construction sector policy makers have the opportunity to create improvements and develop economic, social and environmental sustainability through supply chain economics. The idea of the supply chain concept to improve firm behaviour and industry performance is not new. However there has been limited application and little or no measurement to monitor successful implementation. Often purchasing policies have been developed with sound strategic procurement principles but even these have had limited penetration in to the processes and practices of infrastructure agencies. The research reported in this paper documents an action research study currently being undertaken in the Australian construction sector which aims to explore supply chain economic policy implementation for sectoral change by two government agencies. The theory which informs this study is the emerging area of construction supply chain economics. There are five stages to the project including; demand analysis, chain analysis, government agency organizational audit, supplier strategy and strategic alignment. The overall objective is towards the development of a Supplier Group Strategy Map for two public sector agencies. Two construction subsectors are examined in detail; construction and demolition waste and precast concrete. Both of these subsectors are critical to the economic and environmental sustainability performance of the construction sector and the community as a whole in the particular jurisdictions. The local and state government agencies who are at the core of the case studies rely individually on the performance of these sectors. The study is set within the context of a sound state purchasing policy that has however, had limited application by the two agencies. Partial results of the study are presented and early findings indicate that the standard risk versus expenditure procurement model does not capture the complexities of project, owner and government risk considerations. A new model is proposed in this paper, which incorporates the added dimension of time. The research results have numerous stakeholders; they will hold particular value for those interested in regional construction sector economics, government agencies who develop and implement policy and who have a large construction purchasing imprint and the players involved in the two subsectors. Even though this is a study in Australia it has widespread applicability as previous research indicates that procurement reform is of international significance and policy implementation is problematic.