202 resultados para ecological risk assessment


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Multimetric ecological condition assessment has become an important biodiversity management tool. This study was the first to examine the reliability of these ecological surrogates across variable environments, and the implications for surrogate efficacy. It was demonstrated that through strategic application and design of the multimetric ecological condition index, the effects of environmental gradients and disturbance regimes can be mitigated, and that ecological condition assessment may serve as a scientifically rigorous approach for conservation planning.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Some polycyclic aromatic hydrocarbons (PAHs) are ubiquitous in air and have been implicated as carcinogenic materials. Therefore, literature is replete with studies that are focused on their occurrence and profiles in indoor and outdoor air samples. However, because the relative potency of individual PAHs vary widely, health risks associated with the presence of PAHs in a particular environment cannot be extrapolated directly from the concentrations of individual PAHs in that environment. In addition, database on the potency of PAH mixtures is currently limited. In this paper, we have utilized multi-criteria decision making methods (MCDMs) to simultaneously correlate PAH-related health risk in some microenvironments to the concentration levels, ethoxyresorufin-O-deethylase (EROD) activity induction equivalency factors and toxic equivalency factors (TEFs) of PAHs found in those microenvironments. The results showed that the relative risk associated with PAHs in different air samples depends on the index used. Nevertheless, this approach offers a promising tool that could help identify microenvironments of concern and assist the prioritisation of control strategies.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Risks and uncertainties are inevitable in engineering projects and infrastructure investments. Decisions about investment in infrastructure such as for maintenance, rehabilitation and construction works can pose risks, and may generate significant impacts on social, cultural, environmental and other related issues. This report presents the results of a literature review of current practice in identifying, quantifying and managing risks and predicting impacts as part of the planning and assessment process for infrastructure investment proposals. In assessing proposals for investment in infrastructure, it is necessary to consider social, cultural and environmental risks and impacts to the overall community, as well as financial risks to the investor. The report defines and explains the concept of risk and uncertainty, and describes the three main methodology approaches to the analysis of risk and uncertainty in investment planning for infrastructure, viz examining a range of scenarios or options, sensitivity analysis, and a statistical probability approach, listed here in order of increasing merit and complexity. Forecasts of costs, benefits and community impacts of infrastructure are recognised as central aspects of developing and assessing investment proposals. Increasingly complex modelling techniques are being used for investment evaluation. The literature review identified forecasting errors as the major cause of risk. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. For risks that cannot be readily quantified, assessment techniques commonly include classification or rating systems for likelihood and consequence. The report outlines the system used by the Australian Defence Organisation and in the Australian Standard on risk management. After each risk is identified and quantified or rated, consideration can be given to reducing the risk, and managing any remaining risk as part of the scope of the project. The literature review identified use of risk mapping techniques by a North American chemical company and by the Australian Defence Organisation. This literature review has enabled a risk assessment strategy to be developed, and will underpin an examination of the feasibility of developing a risk assessment capability using a probability approach.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A shortage of affordable housing is a major problem in Australia today. This is mainly due to the limited supply of affordable housing that is provided by the non-government housing sector. Some private housing developers see the provision of affordable housing for lower income people as a high risk investment which offers a lower return than broader market-based housing. The scarcity of suitable land, a limited government ‘subsidy’, and increasing housing costs have not provided sufficient development incentives to encourage their investment despite the existing high demand for affordable housing. This study analyses the risk management process conducted by some private and not-for-profit housing providers in South East Queensland, and draws conclusions about the relationship between risk assessments/responses and past experiences. In-depth interviews of selected non-government housing providers have been conducted to facilitate an understanding of their approach to risk assessment/response in developing and in managing affordable housing projects. These developers use an informal risk management process as part of their normal business process in accordance with industry standards. A simple qualitative matrix has been used to analyse probability and impacts using a qualitative scale - low, medium and high. For housing providers who have considered investing in affordable housing but have not yet implemented any such projects, affordable housing development is seen as an opportunity that needs to be approached with caution. The risks associated with such projects and the levels of acceptance of these are not consistently identified by current housing providers. Many interviewees agree that the recognition of financial risk and the fear of community rejection of such housing projects have restrained them from committing to such investment projects. This study suggests that implementing improvements to the risk mitigation and management framework may assist in promoting the supply of affordable housing by non-government providers.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose: The purpose of this paper is to analyse the risk management process conducted by some private and not-for-profit affordable housing providers in South East Queensland, and draw conclusions about the relationship between risk assessments/responses and past experiences.----- Design/methodology/approach: In-depth interviews of selected non-government housing providers have been conducted to facilitate an understanding of their approach to risk assessment in developing and in managing affordable housing projects. Qualitative data are analysed using thematic analysis to find emerging themes suggested by interview participants.----- Findings: The paper finds that informal risk management process is used as part of normal business process in accordance with industry standards. Many interviewees agree that the recognition of financial risk and the fear of community rejection of such housing projects have restrained them from committing to such investment projects. The levels of acceptance of risk are not always consistent across housing providers which create opportunities to conduct multi-stakeholder partnership to reduce overall risk.----- Research limitations/implications: The paper has implications for developers or investors who seek to include affordable housing as part of their portfolio. However, data collected in the study are a cross-section of interviews that will not include the impact on recent tax incentives offers by the Australian Commonwealth Government.----- Practical implications: The study suggests that implementing improvements to the risk mitigation and management framework may assist in promoting the supply of affordable housing by non-government providers.----- Originality/value: The focus of the study is the interaction between partnerships and risk management in development and management of affordable rental housing.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Quantitative Microbial Risk Assessment (QMRA) analysis was used to quantify the risk of infection associated with the exposure to pathogens from potable and non-potable uses of roof-harvested rainwater in South East Queensland (SEQ). A total of 84 rainwater samples were analysed for the presence of faecal indicators (using culture based methods) and zoonotic bacterial and protozoan pathogens using binary and quantitative PCR (qPCR). The concentrations of Salmonella invA, and Giardia lamblia β-giradin genes ranged from 65-380 genomic units/1000 mL and 9-57 genomic units/1000 mL of water, respectively. After converting gene copies to cell/cyst number, the risk of infection from G. lamblia and Salmonella spp. associated with the use of rainwater for bi-weekly garden hosing was calculated to be below the threshold value of 1 extra infection per 10,000 persons per year. However, the estimated risk of infection from drinking the rainwater daily was 44-250 (for G. lamblia) and 85-520 (for Salmonella spp.) infections per 10,000 persons per year. Since this health risk seems higher than that expected from the reported incidences of gastroenteritis, the assumptions used to estimate these infection risks are critically discussed. Nevertheless, it would seem prudent to disinfect rainwater for potable use.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Public and private sector organisations worldwide are putting strategies in place to manage the commercial and operational risks of climate change. However, community organisations are lagging behind in their understanding and preparedness, despite them being among the most exposed to the effects of climate change impacts and regulation. This poster presents a proposal for a multidisciplinary study that addresses this issue by developing, testing and applying a novel climate risk assessment methodology that is tailored to the needs of Australia’s community sector and its clients. Strategies to mitigate risks and build resilience and adaptive capacity will be identified including new opportunities afforded by urban informatics, social media, and technologies of scale making.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Background: The quality of stormwater runoff from ports is significant as it can be an important source of pollution to the marine environment. This is also a significant issue for the Port of Brisbane as it is located in an area of high environmental values. Therefore, it is imperative to develop an in-depth understanding of stormwater runoff quality to ensure that appropriate strategies are in place for quality improvement. ---------------- The Port currently has a network of stormwater sample collection points where event based samples together with grab samples are tested for a range of water quality parameters. Whilst this information provides a ‘snapshot’ of the pollutants being washed from the catchment/s, it does not allow for a quantifiable assessment of total contaminant loads being discharged to the waters of Moreton Bay. It also does not represent pollutant build-up and wash-off from the different land uses across a broader range of rainfall events which might be expected. As such, it is difficult to relate stormwater quality to different pollutant sources within the Port environment. ----------------- Consequently, this would make the source tracking of pollutants to receiving waters extremely difficult and in turn the ability to implement appropriate mitigation measures. Also, without this detailed understanding, the efficacy of the various stormwater quality mitigation measures implemented cannot be determined with certainty. --------------- Current knowledge on port stormwater runoff quality Currently, little knowledge exists with regards to the pollutant generation capacity specific to port land uses as these do not necessarily compare well with conventional urban industrial or commercial land use due to the specific nature of port activities such as inter-modal operations and cargo management. Furthermore, traffic characteristics in a port area are different to a conventional urban area. Consequently, as data inputs based on an industrial and commercial land uses for modelling purposes is questionable. ------------------ A comprehensive review of published research failed to locate any investigations undertaken with regards to pollutant build-up and wash-off for port specific land uses. Furthermore, there is very limited information made available by various ports worldwide about the pollution generation potential of their facilities. Published work in this area has essentially focussed on the water quality or environmental values in the receiving waters such as the downstream bay or estuary. ----------------- The Project: The research project is an outcome of the collaborative Partnership between the Port of Brisbane Corporation (POBC) and Queensland University of Technology (QUT). A key feature of this Partnership is the undertaking of ‘cutting edge’ research to strengthen the environmental custodianship of the Port area. This project aims to develop a port specific stormwater quality model to allow informed decision making in relation to stormwater quality improvement in the context of the increased growth of the Port. --------------- Stage 1 of the research project focussed on the assessment of pollutant build-up and wash-off using rainfall simulation from the current Port of Brisbane facilities with the longer-term objective of contributing to the development of ecological risk mitigation strategies for future expansion scenarios. Investigation of complex processes such as pollutant wash-off using naturally occurring rainfall events has inherent difficulties. These can be overcome using simulated rainfall for the investigations. ----------------- The deliverables for Stage 1 included the following: * Pollutant build-up and wash-off profiles for six primary land uses within the Port of Brisbane to be used for water quality model development. * Recommendations with regards to future stormwater quality monitoring and pollution mitigation measures. The outcomes are expected to deliver the following benefits to the Port of Brisbane: * The availability of Port specific pollutant build-up and wash-off data will enable the implementation of customised stormwater pollution mitigation strategies. * The water quality data collected would form the baseline data for a Port specific water quality model for mitigation and predictive purposes. * To be at the cutting-edge in terms of water quality management and environmental best practice in the context of port infrastructure. ---------------- Conclusions: The important conclusions from the study are: * It confirmed that the Port environment is unique in terms of pollutant characteristics and is not comparable to typical urban land uses. * For most pollutant types, the Port land uses exhibited lower pollutant concentrations when compared to typical urban land uses. * The pollutant characteristics varied across the different land uses and were not consistent in terms of the land use. Hence, the implementation of stereotypical structural water quality improvement devices could be of limited value. * The <150m particle size range was predominant in suspended solids for pollutant build-up as well as wash-off. Therefore, if suspended solids are targeted as the surrogate parameter for water quality improvement, this specific particle size range needs to be removed. ------------------- Recommendations: Based on the study results the following preliminary recommendations are made: * Due to the appreciable variation in pollutant characteristics for different port land uses, any water quality monitoring stations should preferably be located such that source areas can be easily identified. * The study results having identified significant pollutants for the different land uses should enable the development of a more customised water quality monitoring and testing regime targeting the critical pollutants. * A ‘one size fits all’ approach may not be appropriate for the different port land uses due to the varying pollutant characteristics. As such, pollution mitigation will need to be specifically tailored to suit the specific land use. * Any structural measures implemented for pollution mitigation to be effective should have the capability to remove suspended solids of size <150m. * Based on the results presented and the particularly the fact that the Port land uses cannot be compared to conventional urban land uses in relation to pollutant generation, consideration should be given to the development of a port specific water quality model.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Large mysticete whales represent a unique challenge for chemical risk assessment. Few epidemiological investigations are possible due to the low incidence of adult stranding events. Similarly their often extreme life-history adaptations of prolonged migration and fasting challenge exposure assumptions. Molecular biomarkers offer the potential to complement information yielded through tissue chemical analysis, as well as providing evidence of a molecular response to chemical exposure. In this study we confirm the presence of cytochrome P450 reductase (CPR) and cytochrome P450 isoenzyme 1A1 (CYP1A1) in epidermal tissue of southern hemisphere humpback whales (Megaptera novaeangliae). The detection of CYP1A1 in the integument of the humpback whale affords the opportunity for further quantitative non-destructive investigations of enzyme activity as a function of chemical stress.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Intelligible and accurate risk-based decision-making requires a complex balance of information from different sources, appropriate statistical analysis of this information and consequent intelligent inference and decisions made on the basis of these analyses. Importantly, this requires an explicit acknowledgement of uncertainty in the inputs and outputs of the statistical model. The aim of this paper is to progress a discussion of these issues in the context of several motivating problems related to the wider scope of agricultural production. These problems include biosecurity surveillance design, pest incursion, environmental monitoring and import risk assessment. The information to be integrated includes observational and experimental data, remotely sensed data and expert information. We describe our efforts in addressing these problems using Bayesian models and Bayesian networks. These approaches provide a coherent and transparent framework for modelling complex systems, combining the different information sources, and allowing for uncertainty in inputs and outputs. While the theory underlying Bayesian modelling has a long and well established history, its application is only now becoming more possible for complex problems, due to increased availability of methodological and computational tools. Of course, there are still hurdles and constraints, which we also address through sharing our endeavours and experiences.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

An increase in the likelihood of navigational collisions in port waters has put focus on the collision avoidance process in port traffic safety. The most widely used on-board collision avoidance system is the automatic radar plotting aid which is a passive warning system that triggers an alert based on the pilot’s pre-defined indicators of distance and time proximities at the closest point of approaches in encounters with nearby vessels. To better help pilot in decision making in close quarter situations, collision risk should be considered as a continuous monotonic function of the proximities and risk perception should be considered probabilistically. This paper derives an ordered probit regression model to study perceived collision risks. To illustrate the procedure, the risks perceived by Singapore port pilots were obtained to calibrate the regression model. The results demonstrate that a framework based on the probabilistic risk assessment model can be used to give a better understanding of collision risk and to define a more appropriate level of evasive actions.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Information communication and technology (ICT) systems are almost ubiquitous in the modern world. It is hard to identify any industry, or for that matter any part of society, that is not in some way dependent on these systems and their continued secure operation. Therefore the security of information infrastructures, both on an organisational and societal level, is of critical importance. Information security risk assessment is an essential part of ensuring that these systems are appropriately protected and positioned to deal with a rapidly changing threat environment. The complexity of these systems and their inter-dependencies however, introduces a similar complexity to the information security risk assessment task. This complexity suggests that information security risk assessment cannot, optimally, be undertaken manually. Information security risk assessment for individual components of the information infrastructure can be aided by the use of a software tool, a type of simulation, which concentrates on modelling failure rather than normal operational simulation. Avoiding the modelling of the operational system will once again reduce the level of complexity of the assessment task. The use of such a tool provides the opportunity to reuse information in many different ways by developing a repository of relevant information to aid in both risk assessment and management and governance and compliance activities. Widespread use of such a tool allows the opportunity for the risk models developed for individual information infrastructure components to be connected in order to develop a model of information security exposures across the entire information infrastructure. In this thesis conceptual and practical aspects of risk and its underlying epistemology are analysed to produce a model suitable for application to information security risk assessment. Based on this work prototype software has been developed to explore these concepts for information security risk assessment. Initial work has been carried out to investigate the use of this software for information security compliance and governance activities. Finally, an initial concept for extending the use of this approach across an information infrastructure is presented.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Aim: Whilst motorcycle rider training is commonly incorporated into licensing programs in many developed nations, little empirical support has been found in previous research to prescribe it as an effective road safety countermeasure. It has been posited that the lack of effect of motorcycle rider training on crash reduction may, in part, be due to the predominant focus on skills-based training with little attention devoted to addressing attitudes and motives that influence subsequent risky riding. However, little past research has actually endeavoured to measure attitudinal and motivational factors as a function of rider training. Accordingly, this study was undertaken to assess the effect of a commercial motorcycle rider training program on psychosocial factors that have been shown to influence risk taking by motorcyclists. Method: Four hundred and thirty-eight motorcycle riders attending a competency-based licence training course in Brisbane, Australia, voluntarily participated in the study. A self-report questionnaire adapted from the Rider Risk Assessment Measure (RRAM) was administered to participants at the commencement of training, then again at the conclusion of training. Participants were informed of the independent nature of the research and that their responses would in no way effect their chance of obtaining a licence. To minimise potential demand characteristics, participants were instructed to seal completed questionnaires in envelopes and place them in a sealed box accessible only by the research team (i.e. not able to be viewed by instructors). Results: Significant reductions in the propensity for thrill seeking and intentions to engage in risky riding in the next 12 months were found at the end of training. In addition, a significant increase in attitudes to safety was found. Conclusions: These findings indicate that rider training may have a positive short-term influence on riders’ propensity for risk taking. However, such findings must be interpreted with caution in regard to the subsequent safety of riders as these factors may be subject to further influence once riders are licensed and actively engage with peers during on-road riding. This highlights a challenge for road safety education / training programs in regard to the adoption of safety practices and the need for behavioural follow-up over time to ascertain long-term effects. This study was the initial phase of an ongoing program of research into rider training and risk taking framed around Theory of Planned Behaviour concepts. A subsequent 12 month follow-up of the study participants has been undertaken with data analysis pending.